Water Project Audit

In order to periodically confirm that a water project funded by Ingomar Living Waters is still in operation, we do audits of previously-funded projects.  We commission on-site and/or remote audits to collect updated information on an existing water project.  The information collected from a remote audit or an on-site audit is the same.  In the case of a remote audit, a member of the on-site well committee is phoned and asked to collect and return information.  In the case of an on-site audit, an auditor travels to the water project site to collect information.  But whether the information is collected by an on-site visit or is collected by a water committee member that you call and walk through the collection of the information below, the information collected is the same.

Here is the information we expect to be collected and returned from a water project audit:

  1. Four pictures looking NORTH, SOUTH, EAST, and WEST showing the water project.  How to Take Pictures
  2. Measured GPS (latitude, longitude) location of the water project.  How to Record GPS Latitude and Longitude
  3. Measurement of current water project capacity or flow in gallons or litres per minute. (GPM or LPM).  How to Measure Pump Flow Rate
  4. Anecdotal interview information by talking to the water committee and users of the well, reflecting if the well is working as expected or if there are any issues.  How to Collect Anecdotal Interview Information
  5. Auditor checklist for your use.  Auditor Checklist
  6. Provide one report per well, label with Ingomar Living Water project number.