Kyabasiita COU in

Kiryanga B Village LC,UGANDA

IN PROGRESS

STATUS

people impacted

dollars funded

FUNDED AUGUST 13, 2026

LOCATION 

The Kyabasiita Church of Uganda, Kiryanga parish, is the place requesting water. It is situated in the village of Kiryanga B LC, located in the Kiryanga sub-county,  Kagadi District of Uganda. Kiryanga B LC is a medium-sized village, with 60 households and 2 churches.

CURRENT CONDITIONS

The only source of water the village currently has is a series of ponds in the nearby swamp lands.

The water is usually plentiful, but it is an unprotected water source used by domestic and wild animals and fed by runoff from the surrounding fields. Sanitation is not always handled in a safe way here, so the runoff includes human waste. This introduces Typhoid to the water system, bringing severe headaches, fevers, and stomach issues with it. There isn’t a member of the congregation here that has never experienced Typhoid. Most will have it 2 – 3 times a year. It’s a costly disease. Not only does it keep the sufferer from being able to go to work or school, but it also costs $6.00, on average, each time it’s contracted. That is a large portion of a month’s wages. It means that not only are they taking the financial hit of being unable to work, but they are also spending whatever savings they may have in reserve on getting treatment. Doctors in this part of the world expect treatment costs to be paid for up front. If a family doesn’t have the money for treatment, the person ill will have to wait until they do.

Children with Typhoid will miss school until they have recovered. Older students risk missing exams and having to drop out as absentee days build. In some cases, they will have the opportunity to repeat the year when they are healthy. But many will stop attending school altogether.

These swamps are spawning ground for the mosquitos that bring malaria. Malaria is the number one cause of death for all children under the age of five in Uganda. And the mosquito larva attract frogs to the ponds, and the frogs attract snakes, which increases the danger inherent in traveling to and from the ponds. The villagers rarely include these things in their pleas. For them it is just the way of their world. However, even these things would be better
with a protected, clean, water source.

CEED’S EXPERIENCE

CEED has been drilling in Uganda for over 25 years, with over 1,000 wells completed to date. The first well was drilled using the percussion method, which could drill only inches in a day. A few years after the first well was dug, one of our donors saw the process and felt the call to donate 2 mobile drills for our use, which could then drill a well in days. And then in 2023 we introduced our new big rig for use in areas where we encounter rock layers or other obstacles that the smaller drills cannot overcome, giving us one of the most versatile drilling fleets in East Africa.

The team is Ugandan-staffed and led by Herbert Asiimwe, the Director of CEED Uganda. Herbert has been leading these drilling teams for over 20 years and most of our drillers have been with CEED for more than a decade.

We have a dedicated team for each of the rigs, led collectively by Rogers, and by Felix as the lead on the big rig. Both have been with us for more than 10 years. In fact, most of our drillers have been with us for over a decade.

We are sure to pay our workers good wages in Uganda. After all, the workman is worth his wages, and one of CEED’s goals has always been to ensure that those working for us can support their families through the work they do.

Herbert Asiimwe is a licensed CPA, and so he does his best to keep the operating costs as steady as he can. Oversight is provided in the US office by both Kate Kuzko and the CEED board monthly.

WELL MAINTENANCE & REPAIRS

The funding for future repairs and maintenance is taken care of through a process we have developed over two decades of drilling. When a school or village is chosen for a well, a water source committee is formed. These are members of the village who are asked, or volunteer, to take care of the well. The village leadership and the water source committee sign a contract stating that they will do their best to set aside a few pennies per month to help cover the cost of future repairs. The money is kept at the local bank, and CEED will request periodic checks on the accounts to make sure that the village is taking their responsibility seriously.

This method acts as a guarantee that the village will take ownership of the well. When something is wrong, they have the responsibility to reach out and let us know so the wells can be repaired in a timely manner.

Without this process, the village would not take full ownership of the well. We have seen this in villages where other NGO’s come in to drill but leave without putting a plan of ownership in place. Those wells often break from small, fixable issues, but the villagers don’t contact anyone; it ‘wasn’t their well’ and they thought the NGO’s would come back.

CEED’s committee and the water fund solved this issue, and none of the wells we have drilled over time have fallen into disrepair. Our wells have an uptime rate of over 95%, and the other 5% were repaired and are back in working order.

CHRISTIAN DISCIPLESHIP

Our wells are always part of Christian disciple-making outreach. We call what we do putting the gospel in action. We always share the Jesus film when we drill as well, played on a solar-powered projection system in the local dialect. Every month we hear stories of Ugandans who accept Jesus as their savior by seeing the life of Jesus in their own language. Our team reports that 2-3 people a week tell us that they have found the Lord after watching this film. Each rig, including the Big Rig, has its own projection system. So no matter where or how we are drilling, we are sharing the gospel.

Additionally, this well will be located at a church. The people coming to gather the water will be invited into the congregation. It is likely that the church will see an increase in attendance after the well has been completed.

PROJECT COSTS AND TIMELINE

Project Scope: Provide a borehole well with a hand pump. 

Total Project Cost: $6,000

Funds Required By: July 2026

Estimated Project Start Date: August 2026

Estimated Project Completion Date: September 2026

 FUTURE IMPACT

Nearly 70% of all illnesses recorded in Uganda are due to bad water or having to go into the swamps to fetch water. Our own research has shown that there will be a 70% drop in illness once the new well is installed. They will no longer suffer from Typhoid, Cholera, and Bilharzia. Malaria cases will also drop, since the villagers won’t have to go to the swamps for water, drastically reducing their exposure to mosquitoes.

The children of the village won’t have to challenge wild animals for water. They won’t have to risk being bitten by snakes when they gather water for their families. Since the well will be closer to the village, they also won’t need to spend time gathering water when they should be in school getting an education.

This is a small, rural town. There is not much here outside of the two churches. However, we have seen the prosperity clean water brings. The village will likely find a way to start a school for their children. Often starting as a small, single room, with parents and pastors acting as teachers. Eventually that small school will grow. And the churches will increase in weekly attendance as people come for the clean water and stay for the gospel. After all, we believe in being the gospel in action through bringing clean water.

All projects are made possible by World Changers.