Kyamasenga B Village, UGANDA

COMPLETE

STATUS

people impacted

dollars funded

FUNDED JULY 16, 2026

LOCATION 

The village of Kyamasenga B, Kyamasenga parish, is located in the Nyabutanzi s/county of the Kagadi District, of Uganda. 

CURRENT CONDITIONS

Water in Kyamasenga B can be found only in the ravines between the hills. The climb is steep, and the path is surrounded by lush vegetation and trees, which makes it a hotspot for snakes and monkeys. The women walking have often risked snake bites, and many of them have been bitten on their search for water.

The local health center at the heart of the village is often overwhelmed with women and children who have been bitten by wild animals or who are suffering from malaria from the mosquitoes. They also often treat the villagers for typhoid infections. These risks and illnesses make an already extremely difficult walk for water even harder for the women and children to bear. Not only do they have to haul gallons of water up steep hills, but they also have to keep a vigilant eye on the woods around them. They cannot move too fast, or they may miss a snake lying along the pathway.

Slow walks for water mean that chores aren’t done at home, and oftentimes girls and young children don’t have enough time to go to school even when they are healthy. This leads to higher dropout rates, especially for girls, which feeds into the poverty cycle.

And malaria is the number one cause of death for children under the age of 5 in Uganda. So any baby or young child going with their mother to the water site is at risk of dying, not from the water, but from what grows there.

CEED’S EXPERIENCE

CEED has been drilling in Uganda for over 25 years, with over 1,000 wells completed to date. The first well was drilled using the percussion method, which could drill only inches in a day. A few years after the first well was dug, one of our donors saw the process and felt the call to donate 2 mobile drills for our use, which could then drill a well in days. And then in 2023 we introduced our new big rig for use in areas where we encounter rock layers or other obstacles that the smaller drills cannot overcome, giving us one of the most versatile drilling fleets in East Africa.

The team is Ugandan staffed and led through the efforts of Herbert Asiimwe, the Director of CEED Uganda. Herbert has been leading these drilling teams for over twenty years and most of our drillers have been with CEED for over a decade.

We have a dedicated team for each of the rigs, led by Rogers collectively and Felix as the lead on the big rig. Both have been with us for over ten years. In fact, most of our drillers have been with us for over a decade.

We are sure to pay our workers good wages in Uganda. After all, the workman is worth his wages, and one of CEEDs goals has always been to ensure that those working for us can support their families through the work they do.

Herbert Asiimwe is a licensed CPA, and so he does his best to keep the operating costs as steady as he can. And oversight is provided in the US office by both Kate Kuzko and the CEED board on a monthly basis.

WELL MAINTENANCE & REPAIRS

The funding for future repairs and maintenance is taken care of through a process we have developed over two decades of drilling. When a school or village is chosen for a well, a water source committee is formed. These are members of the village that are asked, or volunteer, to take care of the well. The village leadership and the water source committee sign a contract stating that they will do their best to set aside a few pennies per month to help cover the cost of future repairs. The money is kept at the local bank, and CEED will request periodic checks on the accounts to make sure that the village is taking its responsibility seriously.

This method acts as a guarantee that the village will take ownership of the well. When something is wrong, the village has the responsibility to reach out and let us know, so that the wells can be repaired in a timely manner.

Without this process, the village would not take full ownership of the well. We have seen this in villages where other non-governmental organizations (NGOs) come in to drill, but leave without putting a plan of ownership in place. Those wells often break from small fixable issues, but the villages won’t contact anyone, believing that it ‘wasn’t their well’ and that the NGO’s would come back. The committee and the water fund solved this issue, and none of the wells we have drilled over time have fallen into disrepair. Our wells have an up rate of over 95%, and when necessary, they are repaired and placed back in working order.

The water source committee is already in place.

CHRISTIAN DISCIPLESHIP

Our wells are always part of Christian disciple making outreach. We call what we do putting the gospel in action. We always share the Jesus film when we drill as well, played on a solar powered projection system in the local dialect. Every month we hear stories of Ugandans who accept Jesus as their savior by seeing the life of Jesus in their own language. Our team reports that 2-3 people a week tell us that they have found the Lord after watching this film. Each rig, including the Big Rig, has its own projection system. So no matter where or how we are drilling, we are sharing the gospel.

PROJECT COSTS AND TIMELINE

Project Scope: Provide a borehole well with a hand pump. 

Total Project Cost: $6,000

Estimated Project Start Date: Early July 2026

Estimated Project Completion Date: Late July 2026

 FUTURE IMPACT

Nearly 70% of all illnesses recorded in Uganda are due either to bad water or to having to go to the swamps to fetch water. Our own research has shown that there will be a 70% drop in illness once the new well goes in. They will no longer be suffering from Typhoid or Cholera.  Instances of malaria will go down as the need to visit the deep pools in the valleys will drop to clothes washing and animal watering.

The children of the village won’t have to challenge wild animals for clean water any longer. The women won’t fear snake bites and have to keep such a vigilant eye on the ground as they walk home with their water jugs. They will have more time to take care of their families, to work in the fields, and even to take on small tasks for extra income.

Since the well will be closer to the village, the children won’t need to spend time gathering water when they should be in school getting an education. The health center in the village will also benefit from having a clean water source nearby.

We have seen over and over again the prosperity clean water brings. The village will likely find a way to start a school now that the children aren’t going back and forth from ponds and streams. We will see churches pop up, and the villagers will start growing crops to send to the larger trading centers, giving them access to funds to better feed, clothe and support their families.

Water is the start of all of these things.

COMPLETED NOVEMBER 3, 2026

The well in Kyamasenga B Village has been in full use for 3 months now. That means an average of 6 more days of school per child already. By the end of the year attendance will have increased by an average of 28 days a year.

Women are already saving up to 7 hours a week on gathering water. That’s time they can spend on other things, from working in the fields to housework, to selling grain and goods in the market.

People are already noticing a complete drop in Typhoid cases as they drink clean water for the first time. They will start to feel the long term effects of health and economic prosperity as the year unfolds.

And perhaps most importantly, the Jesus film had a response of a handful of villagers beginning a relationship with Jesus. For some this is the first time they have heard the gospel in their own language rather than in English.

All of this from one single, new water source.

THE DRILLING PROCESS

There were scheduling overruns on this project. However the date given as an expected completion date, July 30, 2026, was drastically off.  That was the expected drill-by date, but cementing and commissioning take longer.

The well was completed and cemented before the end of August. However we did have weather-related delays to the commissioning. Also, 850 is a more accurate count of the population of the villagers using the well currently.

PROJECT COMPLETION REPORTKYAMASENGA BUGANDA
Report Submission Date:November 3, 2026
Actual Project Completion Date:October 17, 2026Has the Completion Date Changed Since Funding Was Approved?:Yes
Total Actual Project Costs
from Beginning to End:
$6,000Have Costs Changed Since Funding Was Approved?:No
Updated Estimate of the Number of People Who Actually Will Be Served Daily:850Has the Estimate Changed
Since Funding Was Approved?:
Yes
Actual Measured Pump Capacity
in Liters Per Minute (LPM)
or Gallons Per Minute (GPM) :
18 LPM  |  4.7551 GPMDepth of Well in Meters or Feet:28 Meters  |  86 Feet
Actual Latitude, Longitude:0.98299, 30.94349Has Location Changed Since Funding Was Approved?:No

 

BEFORE

AFTER

THE INAUGURATION CELEBRATION

THANK YOU!

All projects are made possible by World Changers.