GALIRAAYA VILLAGE, UGANDA

COMPLETE

STATUS

people impacted

dollars funded

FUNDED MAY 21, 2026

LOCATION

Galiraaya Village is located in Kyakakoizi local council area, Budaka parish, Kitoba Subcounty in the Hoima District of Uganda.

CURRENT CONDITIONS

The village of Galiraaya has over 180 households and about 1200 villagers. Villagers are all currently gathering water from a series of ponds located at the edge of a swamp. Because of the water, the villagers are frequently falling ill from typhoid and cholera and suffering from skin rashes. This is also an area where bilharzia is common, which the villagers listed as one of the main issues they were facing due to the water.

The water sources are also used by the local herdsmen. And it is common to find wild monkeys and snakes in and around the water source. Most snakes in Uganda are poisonous, and therefore, in gathering water, villagers run the risk of dying from a snake bite. The village is close to denser forested areas as well, and some of the women also have reported seeing larger apes at the water source when it is dry. The animals are scaring the children away from the ponds.

Further, the journey is too far for many of the older villagers to make. The road is not easy and the water is too heavy for them to carry back up the hills from the ponds.

The village asked the government for help, but it never heard a response from anyone. So, the village is now asking us to help them gain access to clean water.

CEED’S EXPERIENCE

CEED has been drilling in Uganda for over 20 years, with over 1,000 wells completed to date. The first well was drilled using the percussion method, which could drill only inches in a day. A few years after the first well was dug, one of our donors saw the process and felt the call to donate two mobile drills for our use, which is capable of drilling a well in days. Later, in 2023, we introduced our new big rig for use in areas where we encounter rock layers or other obstacles that the smaller drills cannot overcome, giving us one of the most versatile drilling fleets in East Africa.

The CEED team is Ugandan staffed and led through the efforts of Herbert Asiimwe, the Director of CEED Uganda. Herbert has been leading the drilling teams for over 20 years, and most of our drillers have been with CEED for over a decade.

We have a dedicated team for each of the rigs, which are together led by Rogers collectively and Felix as the lead on the big rig. Both men have been with CEED for over a decade, and most of our drillers also have been with us for over a decade.

CEED makes sure to pay its workers good wages in Uganda. The workers are worth their wages, and one of CEED’s goals has always been to ensure that those working for it can support their families through the work they do.

Herbert Asiimwe is a licensed CPA, and so he does his best to keep the operating costs as steady as he can. Oversight is provided in the US office by Kate Kuzko and the CEED Board, which meets monthly.

WELL MAINTENANCE & REPAIRS

The funding for future repairs and maintenance is handled through a process we have developed over two decades of drilling. When a school or village is chosen for a well, a water source committee is formed. These are members of the village that are asked, or volunteer, to take care of the well. The village leadership and the water source committee sign a contract stating that they will do their best to set aside a few pennies per month to help cover the cost of future repairs. The money is kept at the local bank, and CEED will request periodic checks on the account to make sure that the village is taking its responsibility seriously.

This method acts as a guarantee that the village will take ownership of the well. When something is wrong, the village has the responsibility to reach out and let us know, so that the wells can be repaired in a timely manner.

Without this process the village would not take full ownership of the well. We have seen this in villages where other non-governmental organizations (NGOs) come in to drill but leave without putting a plan of ownership in place. In those cases, the wells often break from small fixable issues, but the villages don’t contact anyone, believing that it ‘wasn’t their well’ and that the NGO’s would come back. The committee and the water fund we require has solved this issue, and none of the wells we have drilled over time have fallen into disrepair.

Our wells have an up rate of over 95%, and the other 5% of wells are repaired and placed back in working order.

CHRISTIAN DISCIPLESHIP

Our wells are always part of Christian disciple making outreach. We call what we do putting the gospel in action. We always share the Jesus film when we drill a well, played on a solar powered projection system in the local dialect. Every month we hear stories of Ugandans who accept Jesus as their savior through seeing the life of Jesus in their own language. Our team reports that 2-3 people a week tell us that they have found the Lord after watching this film. Each rig, including the Big Rig, has its own projection system, so that, no matter where or how we are drilling, we are sharing the gospel.

PROJECT COSTS AND TIMELINE

Total Project Cost:  $6,000

Funding Requested from ILW:  $6,000

Date Funding Required:  Mid May 2026

Estimated Project Start Date: Mid June 2026

Estimated Project Completion Date: Mid July 2026

 FUTURE IMPACT

Nearly 70% of all illnesses recorded in Uganda are from bad water or from having to go to the swamps to fetch water. CEED’s own research has shown that there will be a 70% drop in illness once the new well goes in. As a result, much suffering from typhoid, cholera and bilharzia can be eliminated.

In this village, the children will not have to challenge wild animals for clean water any longer. They will not have to risk being bitten by snakes when they gather clean water for their families. Since the well will be closer to the village, they also won’t need to spend time gathering water when they should be in school getting an education.

The older villagers will have a safe path to water and the women won’t have to fight off monkeys and apes to provide for their families.

The school children will be healthy enough to attend school. And while we often talk of wells enabling economic growth, in the case of this village, a well providing clean water will help prevent a decline in the village economy that currently exists.

This is a small, rural town, far off the beaten track. However, in cases like this, we have seen the prosperity that clean water brings. The village will likely find a way to start a new school now that the children aren’t going back and forth from ponds and streams. We may see churches pop up. And the villagers will start growing crops to send to the larger trading centers, giving them access to funds to better feed, clothe and support their families. Water is the start of all of these things.

COMPLETED NOVEMBER 5, 2026

Galiraaya Village has been actively using the well for two months. They have already seen a drastic decrease in illnesses across every age range. Typhoid is no longer an issue for the village. And while they do still experience malaria, those cases have also dropped exponentially. The less the women and children have to travel into the valleys and swamps for water, the less likely they will be at risk of exposure to malaria.

And they are no longer exposed to the parasite that brings bilharzia. That one cannot be treated as easily, so the only true cure is lack of exposure. Now they don’t have to worry about the parasite killing their children.

The women of the village are spending time in the fields and with their families instead of spending time gathering water in the swamps and streams. We know that this is also going to result in at least 50% less cases of domestic violence in the village. 

Children are going to school now, families are keeping more of their earnings for food, seed and basic necessities. Everything is better because of clean water.

BEFORE

AFTER

PROJECT COMPLETION REPORTGALIRAAYA VILLAGE UGANDA 
Report Submission Date:November 5, 2026
Actual Project Completion Date:July 18, 2026Has the Completion Date Changed Since Funding Was Approved?:The well was drilled and commissioned before August. All overruns were due to communication issues.
Total Actual Project Costs
from Beginning to End:
$6,000Have Costs Changed Since Funding Was Approved?:No
Updated Estimate of the Number of People Who Actually Will Be Served Daily:1,200Has the Estimate Changed
Since Funding Was Approved?:
No
Actual Measured Pump Capacity
in Liters Per Minute (LPM)
or Gallons Per Minute (GPM) :
50 LPM  |  13.2086 GPMDepth of Well in Meters or Feet:70 Meters  |  229.6588 Feet
Actual Latitude, Longitude:1.536392, 31.232432Has Location Changed Since Funding Was Approved?:No

 