COMPLETE
LOCATION
Kasozi Village is located in Kitaihuka Subcounty, Bugangaizi West County, in the Kakumiro District of Uganda.
CURRENT CONDITIONS
Kasozi is a large village with 600 households, 3200 people, 3 primary schools, 8 churches and a thriving trade center with multiple shops.
There is a shallow well on the outskirts of Kasozi Village. However, it does not meet all the needs of the large population. So over half of the villagers have to get their water from the streams and open ponds around the village instead.
One mother told us that she and her family have been ill from typhoid since the beginning of the year, having to spend thousands of shillings on medication alone. She also said that, when they do get water, they often encounter snakes, some that will slither over and up their legs as they try to gather water.
The young children who go to the water sites with their mothers are the most likely to fall victim to Malaria. Malaria is the primary cause of death for all children under 5 in Uganda.
The large size of the village is because it is at a crossroads. And it is therefore strategically positioned for a strong economy. The shallow well likely helped establish the location and enabled its growth. However, with the current population level, more people are drinking contaminated water than clean water.
Also, shallow wells like the one at the village run the risk of going dry in a prolonged dry season, and they can often become contaminated if the rainy season brings flooding. When either of these things happen, no one in the village has access to clean water unless they are willing and able to buy water from the stores. Very few can afford the cost.
Women describe snakes found at the dirty water gathering area
CEED’S EXPERIENCE
CEED has been drilling in Uganda for over 20 years, with over 1,000 wells completed to date. The first well was drilled using the percussion method, which could drill only inches in a day. A few years after the first well was dug, one of our donors saw the process and felt the call to donate two mobile drills for our use, which is capable of drilling a well in days. Later, in 2023, we introduced our new big rig for use in areas where we encounter rock layers or other obstacles that the smaller drills cannot overcome, giving us one of the most versatile drilling fleets in East Africa.
The CEED team is Ugandan staffed and led through the efforts of Herbert Asiimwe, the Director of CEED Uganda. Herbert has been leading the drilling teams for over 20 years, and most of our drillers have been with CEED for over a decade.
We have a dedicated team for each of the rigs, which are together led by Rogers collectively and Felix as the lead on the big rig. Both men have been with CEED for over a decade, and most of our drillers also have been with us for over a decade.
CEED makes sure to pay its workers good wages in Uganda. The workers are worth their wages, and one of CEED’s goals has always been to ensure that those working for it can support their families through the work they do.
Herbert Asiimwe is a licensed CPA, and so he does his best to keep the operating costs as steady as he can. Oversight is provided in the US office by Kate Kuzko and the CEED Board, which meets monthly.
WELL MAINTENANCE & REPAIRS
The funding for future repairs and maintenance is handled through a process we have developed over two decades of drilling. When a school or village is chosen for a well, a water source committee is formed. These are members of the village who are asked, or volunteer, to take care of the well. The village leadership and the water source committee sign a contract stating that they will do their best to set aside a few pennies per month to help cover the cost of future repairs. The money is kept at the local bank, and CEED will request periodic checks on the account to make sure that the village is taking its responsibility seriously.
This method acts as a guarantee that the village will take ownership of the well. When something is wrong, the village has the responsibility to reach out and let us know, so that the wells can be repaired in a timely manner.
Without this process, the village would not take full ownership of the well. We have seen this in villages where other non-governmental organizations (NGOs) come in to drill but leave without putting a plan of ownership in place. In those cases, the wells often break from small fixable issues, but the villages don’t contact anyone, believing that it ‘wasn’t their well’ and that the NGO’s would come back. The committee and the water fund we require has solved this issue, and none of the wells we have drilled over time have fallen into disrepair.
Our wells have an up rate of over 95%, and the other 5% of wells are repaired and placed back in working order.
CHRISTIAN DISCIPLESHIP
Our wells are always part of Christian disciple making outreach. We call what we do putting the gospel in action. We always share the Jesus film when we drill a well, played on a solar powered projection system in the local dialect. Every month we hear stories of Ugandans who accept Jesus as their savior through seeing the life of Jesus in their own language. Our team reports that 2-3 people a week tell us that they have found the Lord after watching this film. Each rig, including the Big Rig, has its own projection system, so that, no matter where or how we are drilling, we are sharing the gospel.
PROJECT COSTS AND TIMELINE
Total Project Cost: $6,000
Project Scope: A borehole well with a hand pump
Funding Requested from ILW: $6,000
Date Funding Required: Mid May 2026
Estimated Project Start Date: Mid June 2026
Estimated Project Completion Date: Mid July 2026
FUTURE IMPACT
Nearly 70% of all illnesses recorded in Uganda are from bad water or from having to go to the swamps to fetch water. CEED’s own research has shown that there will be a 70% drop in illness once the new well goes in.
As mothers begin to gather around wells, rather than in the swamps, the youngest villagers will no longer be exposed to the mosquitoes in the swamps. The women won’t have to risk snake bites and illness when gathering water for their families.
School children will be healthy enough to attend school. And while we often talk of wells enabling economic growth, in the case of this village, a well providing clean water will help prevent a decline in the village economy that currently exists.
Jim West, a representative from CEED, visited the official inauguration of the well in Kasozi. As he pointed out, the more than 600 families in this village will now be healthy. The water from the aquifers do not contain the same bacteria and parasites that you will find in the surface water that these villagers used to have to drink.
The local school children were among the first to use the new well. We now know that adding a well to a village increases school attendance by an average of 28 days per student. For a small percentage, they will now be able to attend school for the first time. We know that a family will spend more time at work, and less money on doctors and medicine, with a net result of almost two months of wages now able to be used for education and improvement of their homes and their village.
And while Malaria will still be something many of these individuals experience, they will have fewer experiences with the illness during the year.
The village will grow, the children will be educated, and everyone will be happier and healthier all because of clean water.
| PROJECT COMPLETION REPORT | KASOZI VILLAGE | UGANDA | |
| Report Submission Date: | September 1, 2026 | ||
| Actual Project Completion Date: | July 13, 2026 | Has the Completion Date Changed Since Funding Was Approved?: | No |
| Total Actual Project Costs from Beginning to End: | $6,000 | Have Costs Changed Since Funding Was Approved?: | No |
| Updated Estimate of the Number of People Who Actually Will Be Served Daily: | 2,000 | Has the Estimate Changed Since Funding Was Approved?: | Yes, the estimate has increased |
| Actual Measured Pump Capacity in Liters Per Minute (LPM) or Gallons Per Minute (GPM) : | 35 LPM | 9.24602 GPM | Depth of Well in Meters or Feet: | 45 Meters | 147.638 Feet |
| Actual Latitude, Longitude: | 0.982942, 31.27269 | Has Location Changed Since Funding Was Approved?: | No |
THE COMMISSIONING CELEBRATION
Jim West describes the joy of clean water for the village

All projects are made possible by World Changers.