KAMUGABA LC1, UGANDA

COMPLETE

STATUS

people impacted

dollars funded

FUNDED MAY 21, 2026

LOCATION

Kamugaba LC1 is a large village of over 450 households. It is home to 2250 people in the area. Right now, everyone must gather water from ponds and streams, which puts them at risk for typhoid, skin rashes, and malaria. The area is home to 3 schools and 11 worship centers, including Christian churches, mosques, and Bisaka (a local African tribal religion) worship centers.

CURRENT CONDITIONS

Right now everyone must gather water from ponds and streams, which puts them at risk for typhoid, skin rashes, and malaria. It is the women and children who suffer from these consequences the most. The young children who go to the water sites with their mothers are also the most likely to fall victim to Malaria. Malaria is the primary cause of death for all children under 5 in Uganda.

Additionally, when the children must walk a long way for water, they are also much more likely to drop out of school, due to missing classes. School is expensive, and families already struggling with illness won’t pay tuition for students who aren’t in school. When a family does not have the resources to support all their children, and if a daughter is no longer in school, then she can be married off in exchange for a bride price of some goats or cattle. At that point, her future is set, and her childhood is over. These are girls as young as 14.

Domestic violence is an issue in this village. Women often must spend hours gathering water. The search for water often replaces working in the fields or even making food for their family. The men in the village see this, unfairly, as the women being lazy. Sometimes the women get harassed on the road and when they get home, they are met with suspicion rather than compassion. All of this leads to increased cases of domestic violence. This is also a mixed faith area, while domestic violence still happens in areas that are predominantly Christian, when you have a mix of Muslims, Bisakans, and Christians, the rates are much, much higher. Statistically, Christian women tend to be treated better by their husbands, brothers, and fathers, than are the women of many other faiths.

Woman describes the problems due to the lack of clean water.

CEED’S EXPERIENCE

CEED has been drilling in Uganda for over 20 years, with over 1,000 wells done to date. The first well was drilled using the percussion method, which could drill inches in a day. A few years after the first well was dug, one of our donors saw the process and felt the call to donate 2 mobile drills for our use, which could now drill a well in days. And then in 2023, we introduced our new big rig for use in areas where we encounter rock layers or other obstacles that the smaller drills cannot overcome, giving us one of the most versatile drilling fleets in East Africa.

The team is Ugandan-staffed and led through the efforts of Herbert Asiimwe, the Director of CEED Uganda. Herbert has been leading these drilling teams for over 20 years, and most of our drillers have been with CEED for over a decade.

We have a dedicated team for each of the rigs, led by Rogers collectively and Felix as the lead on the big rig. Both have been with us for over 10 years. In fact, most of our drillers have been with us for over a decade.

We are sure to pay our workers good wages in Uganda. After all the workman is worth their wages, and one of CEEDs goals has always been to ensure that those working for us can support their families through the work they do.
Herbert Asiimwe is a licensed CPA, so he does his best to keep the operating costs as steady as he can. And oversight is done in the US office by both Kate Kuzko and the CEED board monthly.

Contaminated water, yet all that these people have.

WELL MAINTENANCE & REPAIRS

The funding for future repairs and maintenance is taken care of through a process we have developed over two decades of drilling. When a school or village is chosen for a well, they sign a contract stating that they will do their best to set aside a few pennies per month to help cover the cost of future repairs. In this case it will likely come from the tuition the students pay. The money is kept at the local bank, and CEED will request periodic checks on the accounts to make sure that the village is taking their responsibility seriously.

This method acts as a guarantee that the village will take ownership of the well. When something is wrong, they have the responsibility to reach out and let us know so the wells can be repaired in a timely manner.

Without this process the village would not take full ownership of the well. We have seen this in villages where other NGO’s come in to drill but leave without putting a plan of ownership in place. Those wells often break from small fixable issues, but the villages won’t contact anyone it ‘wasn’t their well’ and they thought the NGO’s would come back. The committee and the water fund solved this issue, and none of the wells we have drilled over time have fallen into disrepair.

Our wells have an up-rate of over 95%, and the other 5% were repaired and are back in working order.

Even very young children must fetch water for their families daily.

It’s a long walk to bring water back home.

CHRISTIAN DISCIPLESHIP

Our wells are always part of Christian disciple-making outreach. We call what we do putting the gospel into action. We always share the Jesus film when we drill, played on a solar-powered projection system in the local dialect. Every month, we hear stories of Ugandans who accept Jesus as their savior through seeing the life of Jesus in their own language. Our team reports that 2-3 people a week tell us that they have found the Lord after watching this film. Each rig, including the Big Rig has its own projection system, so no matter where or how we are drilling, we are sharing the gospel.

Village leaders seek a well site.

PROJECT COSTS AND TIMELINE

Total Project Cost:  $6,000

Project Scope: A borehole well and hand pump

Funding Requested from ILW:  $6,000

Date Funding Required:  Mid May 2026

Estimated Project Start Date: Mid June 2026

Estimated Project Completion Date: Mid July 2026

 FUTURE IMPACT

If we can give this village clean water, they will stop suffering from Cholera. Their children will stop dying of waterborne illnesses, and they will stop having to bury their elders for the same. Nearly 70% of all illnesses recorded in Uganda are due to bad water or having to go to the swamps to fetch water. We know this well. Our own research has shown that there will be a 70% drop in illness once the new well goes in.

The three churches in the area will grow as the people praise God for the gift of clean water. The trading center that is just starting out will also grow as the people get healthier and are able to work more consistently.

Thank you, World Changers!

COMPLETED SEPTEMBER 8, 2026

The well has been in use since June 2026. By July there was already a noticeable improvement in the health and hygiene of the village. The men, women and children who had come out for the well commissioning were visibly healthier than they had been when we were there to see if they were a good project candidate. We know that there is at least a 70% increase in the health of the village.

After a year a village like this will see vast economic improvement. A well will allow the adults in the village to spend nearly a month less on things like doctors’ visits, gathering water, and gathering firewood. On average they will have saved, or made, 1,000,000 shillings more than they had in the prior year. They will be investing in their children’s education, as well as their homes and their crops. Some will start businesses ranging from mending for others to selling prepared food.

Children will be spending weeks in school that they would have spent ill at home. There isn’t a single aspect of life that isn’t touched by the addition of clean water.

From the village: “We the residents of the above area, hereby extend our sincere thanks to our donor Ingomar Living Waters for the support of a permanent safe clean water to our community. We have been having a problem of water, sharing with both wild and domestic animals resulting into typhoid, malaria, cholera and others. But with your donation we are assured of safe clean water. This borehole is going to serve a population of 2250 people from over 450 households. May the Almighty God bless you all abundantly.”

BEFORE

AFTER

Villagers Watching the Jesus Film

THE CONSTRUCTION PHASE

 

PROJECT COMPLETION REPORTKAMUGABA LC1UGANDA
Report Submission Date:September 1, 2026
Actual Project Completion Date:July 13, 2026Has the Completion Date Changed Since Funding Was Approved?:No
Total Actual Project Costs
from Beginning to End:
$6,000Have Costs Changed Since Funding Was Approved?:No
Updated Estimate of the Number of People Who Actually Will Be Served Daily:2,250Has the Estimate Changed
Since Funding Was Approved?:
Yes, the estimate was slightly increased
Actual Measured Pump Capacity
in Liters Per Minute (LPM)
or Gallons Per Minute (GPM) :
35 LPM  |  9.24602 GPMDepth of Well in Meters or Feet:25.908 Meters  |  85 Feet
Actual Latitude, Longitude:1.017865, 31.258138Has Location Changed Since Funding Was Approved?:No

THE COMMISSIONING CELEBRATION