COMPLETE
LOCATION
Kisagara Cell is in the Masaka ward, Nalweyo, Bugangaizi West, in the Kakumiro district of Uganda.
CURRENT CONDITIONS
Kisagara Cell has 200 households with around 820 people. It is also home to two churches, one school, and a newly established trade center.
The only water source the village must use is an open pond surrounded by shallower swamps. The pond is so frequently used by both domestic and wild animals that it is often too filthy to be used for drinking water. The pond is 7–10 ft deep, which makes it particularly dangerous. In 2024 one of the village children died at the local pond when they tried to gather water. They were only 10 years old.
The water there is also a breeding ground for snakes, frogs, and insects. The villagers frequently suffer from typhoid, diarrhea, skin rashes, and malaria from the mosquitoes that breed around the pond.
It is the women and the children who suffer from these consequences the most. When the children have to walk a long way for water, they are also much more likely to drop out due to missing school. School is expensive, and families already struggling with illness won’t pay tuition for students who aren’t in school. When a family does not have the resources to support all their children, and if a daughter is no longer in school, then she can be married off in exchange for a bride price of some goats or cattle. At that point, her future is set, and her childhood is over. These are girls as young as 14.
The young children who go to the water sites with their mothers are also the most likely to fall victim to Malaria. Malaria is the primary cause of death for all children under five in Uganda.
CEED’S EXPERIENCE
CEED has been drilling in Uganda for over 20 years, with over 1,000 wells done to date. The first well was drilled using the percussion method, which could drill inches in a day. A few years after the first well was dug, one of our donors saw the process and felt the call to donate 2 mobile drills for our use, which could now drill a well in days. And then in 2023, we introduced our new big rig for use in areas where we encounter rock layers or other obstacles that the smaller drills cannot overcome, giving us one of the most versatile drilling fleets in East Africa.
The team is Ugandan-staffed and led through the efforts of Herbert Asiimwe, the Director of CEED Uganda. Herbert has been leading these drilling teams for over 20 years, and most of our drillers have been with CEED for over a decade.
We have a dedicated team for each of the rigs, led by Rogers collectively and Felix as the lead on the big rig. Both have been with us for over 10 years. In fact, most of our drillers have been with us for over a decade.
We are sure to pay our workers good wages in Uganda. After all the workman is worth their wages, and one of CEEDs goals has always been to ensure that those working for us can support their families through the work they do.
Herbert Asiimwe is a licensed CPA, so he does his best to keep the operating costs as steady as he can. And oversight is done in the US office by both Kate and the CEED board monthly.
WELL MAINTENANCE & REPAIRS
The funding for future repairs and maintenance is taken care of through a process we have developed over two decades of drilling. When a school or village is chosen for a well, they sign a contract stating that they will do their best to set aside a few pennies per month to help cover the cost of future repairs. In this case it will likely come from the tuition the students pay. The money is kept at the local bank, and CEED will request periodic checks on the accounts to make sure that the village is taking their responsibility seriously.
This method acts as a guarantee that the village will take ownership of the well. When something is wrong, they have the responsibility to reach out and let us know so the wells can be repaired in a timely manner.
Without this process the village would not take full ownership of the well. We have seen this in villages where other NGO’s come in to drill but leave without putting a plan of ownership in place. Those wells often break from small fixable issues, but the villages won’t contact anyone it ‘wasn’t their well’ and they thought the NGO’s would come back. The committee and the water fund solved this issue, and none of the wells we have drilled over time have fallen into disrepair.
Our wells have an up-rate of over 95%, and the other 5% were repaired and are back in working order.
CHRISTIAN DISCIPLESHIP
Our wells are always part of Christian disciple-making outreach. We call what we do putting the gospel into action. We always share the Jesus film when we drill, played on a solar-powered projection system in the local dialect. Every month, we hear stories of Ugandans who accept Jesus as their savior through seeing the life of Jesus in their own language. Our team reports that 2-3 people a week tell us that they have found the Lord after watching this film. Each rig, including the Big Rig has its own projection system, so no matter where or how we are drilling, we are sharing the gospel.
PROJECT COSTS AND TIMELINE
Total Project Cost: $6,000 for a borehole well with a hand pump
Funding Requested from ILW: $6,000
Date Funding Required: Mid May 2026
Estimated Project Start Date: Mid June 2026
Estimated Project Completion Date: Mid July 2026
FUTURE IMPACT
If we can give this village clean water, they will stop suffering from Cholera. Their children will stop dying of waterborne illnesses, and they will stop having to bury their elders for the same. Nearly 70% of all illnesses recorded in Uganda are due to bad water or having to go to the swamps to fetch water. We know this well. Our own research has shown that there will be a 70% drop in illness once the new well goes in.
The three churches in the area will grow as the people praise God for the gift of clean water. The trading center that is just starting out will also grow as the people get healthier and are able to work more consistently.
The village has been able to use the well since July. Since they have been able to use the new well, they have been healthier, as instances of typhoid have already started dropping. The women of the village are no longer having to wake up at 4 am, before the sun is up, to go fetch water. Instead, they can gather at the well in the safety of their village. Children sent to gather water can easily get done with the chore with plenty of time to head to school.
These are the small changes that have already happened over the course of 3 months. More and more changes will happen as time passes.
A village elder expressed the following: “I’m appreciating the engineers, the constructors who have constructed our borehole, the Ingomar company for offering us a borehole. We have been taking poor water, the bad water, people have been suffering from dysentery, suffering from all sorts caused by bad water. This time we are going to take nice water, we shall have good life, and we will get development from drinking pure water.”
THE CONSTRUCTION PHASE
| PROJECT COMPLETION REPORT | KISAGARA CELL | UGANDA | |
| Report Submission Date: | September 1, 2026 | ||
| Actual Project Completion Date: | July 13, 2026 | Has the Completion Date Changed Since Funding Was Approved?: | No |
| Total Actual Project Costs from Beginning to End: | $6,000 | Have Costs Changed Since Funding Was Approved?: | No |
| Updated Estimate of the Number of People Who Actually Will Be Served Daily: | 1,000 | Has the Estimate Changed Since Funding Was Approved?: | Yes |
| Actual Measured Pump Capacity in Liters Per Minute (LPM) or Gallons Per Minute (GPM) : | 30 LPM | 7.92516 GPM | Depth of Well in Meters or Feet: | 41.148 Meters | 135 Feet |
| Actual Latitude, Longitude: | 1.10726, 31.27077 | Has Location Changed Since Funding Was Approved?: | No |