KYEBIGOZA B VILLAGE, UGANDA

COMPLETE

STATUS

people impacted

dollars funded

FUNDED MAY 7, 2026

LOCATION

Kyebigoza B Village, in the Kagadi District, Kicucuura Sub-County, Kitooro Parish of Uganda, is home to 1,500 people in 350 households.

This village has been experiencing Cholera outbreaks recently, due to contaminated water. It is mainly affecting the children, pregnant women, and elderly villagers. One in every 25 children in Uganda suffers from these kinds of diseases annually. Cholera is especially difficult on the elderly as well, and many who contract the disease die from dehydration. This is in addition to the usual cases of Typhoid that we see in these kinds of situations.

There are no clean water sources near this village; they only have open ponds and streams to gather from. The nearest borehole is a few hours’ walk away, and it is never an easy journey. Men along the way will try to lure the women and girls gathering water away from their task and home, and we have heard many stories of rape, and pregnancy in school-age girls over the years. But with the recent outbreak of Cholera, many are now taking that risk.

Kyebigoza B Village

CURRENT CONDITIONS

When children have to walk a long way for water, they are also much more likely to drop out due to missing school. School is expensive, and families who are already struggling with illness won’t pay tuition for students who aren’t actually in school. This has been happening in Kyebigoza, and the villagers we spoke to also mentioned that there have been child marriages there. This happens when a family does not have the resources to support all of their children, and if a daughter is no longer in school, then she can be married off in exchange for a bride price of some goats or cattle. At that point, her future is set and her childhood is over. These are girls as young as 14.

The lack of clean water is robbing many of their futures and some of their lives.

A current water source

The pond’s edge is steep and dangerous for the young children fetching water.

Village leaders discuss the water problem

They search for a good well site.

CEED’S EXPERIENCE

CEED has been drilling in Uganda for over 20 years, with over 1,000 wells done to date. The first well was drilled using the percussion method, which could drill inches in a day. A few years after the first well was dug, one of our donors saw the process and felt the call to donate two mobile drills for our use, which could now drill a well in days. And then in 2023, we introduced our new Big Rig for use in areas where we encounter rock layers or other obstacles that the smaller drills cannot overcome, giving us one of the most versatile drilling fleets in East Africa.

The team is Ugandan-staffed and led by Herbert Asiimwe, the Director of CEED Uganda. Herbert has been leading these drilling teams for over 20 years, and most of our drillers have been with CEED for over a decade. We have a dedicated team for each of the rigs, led by Rogers and Felix, who have both been with us for over 10 years.

We are sure to pay our workers good wages in Uganda. After all, the workman is worth their wages, and one of CEED’s goals has always been to ensure that those working for us can support their families through the work they do.

Herbert Asiimwe is a licensed CPA, so he does his best to keep the operating costs as steady as he can. And oversight is done in the US office by both Kate Kuzko and the CEED board monthly.

WELL MAINTENANCE & REPAIRS

The funding for future repairs and maintenance is taken care of through a process we have developed over two decades of drilling. When a school or village is chosen for a well, they sign a contract stating that they will do their best to set aside a few pennies per month to help cover the cost of future repairs. The money is kept at the local bank, and CEED will request periodic checks on the accounts to make sure that the village is taking its responsibility seriously.

This method acts as a guarantee that the village will take ownership of the well. When something is wrong, they have the responsibility to reach out and let us know so the wells can be repaired in a timely manner.

Without this process, the village would not take full ownership of the well. We have seen this happen in villages where other NGO’s came in to drill but left without putting an ownership plan in place. Those wells often broke from small fixable issues, but the villages didn’t contact anyone because it ‘wasn’t their well’ and they thought the NGO’s would come back. A village water committee and a water fund solved this issue for us, and none of the wells we have drilled over time have fallen into disrepair.

CHRISTIAN DISCIPLESHIP

There are three churches in this area that will depend on the clean water. Churches with water nearby are more likely to see growth in their congregation than those without. People will travel to the place where the water is, and in doing so, they will hear the gospel.

We always share the Jesus film when we drill, played on a solar-powered projection system in the local dialect. Every month we hear stories of Ugandans who have accepted Jesus as their Savior through seeing His life portrayed in their own language. Our team reports that 2-3 people a week tell them that they found the Lord after watching this film. Each rig, including the Big Rig, has its own projection system, so no matter where or how we are drilling, we are sharing the gospel.

PROJECT COSTS AND TIMELINE

Total Project Cost:  $6,000

Funding Requested from ILW:  $6,000

Date Funding Required:  Early May 2026

Estimated Project Start Date: Mid June 2026

Estimated Project Completion Date: Mid September 2026

 FUTURE IMPACT

If we can give this village clean water, they will stop suffering from Cholera. Their children will stop dying of waterborne illnesses, and they will stop having to bury their elders for the same. Nearly 70% of all illnesses recorded in Uganda are due to bad water or having to go to the swamps to fetch water. We know this well. Our own research has shown that there will be a 70% drop in illness once the new well goes in.

The three churches in the area will grow as the people praise God for the gift of clean water. The trading center that is just starting out will also grow as the people get healthier and are able to work more consistently.

COMPLETED AUGUST 3, 2026

When we bring a new clean water well to a village, there are some changes that are universal. It will start with a drop in illnesses like typhoid and dysentery. The effects of this change are immediate. Families stop having to spend money on transportation to the clinics and treatment for illnesses. Parents aren’t too sick to work in the fields, so they are able to grow enough food for their children and extra to sell along the roadsides for extra income. Children aren’t too sick to go to school or take their exams. Girls in particular will be more likely to get an education, which in turn will set them up for better job opportunities and better futures.

Women no longer have to wake up at 4 in the morning, long before the sun is up, to go and gather water from the swamps and streams. Children don’t have to miss their morning classes to go gather water. This means that as they grow, they will be more likely to stay in school. There is even enough water now for regular bathing and laundry. And the water is unlikely to cause skin irritation like the bad water could.

The permanent memorial plaque was not ready when the well was commissioned,
so the villagers held a handmade poster. The permanent plaque appears in later pictures.

THE CONSTRUCTION PHASE

The “Jesus Film” played every night during the drilling, telling the story of God’s love.

BEFORE

AFTER

 

PROJECT COMPLETION REPORTKYEBIGOZA B VILLAGE UGANDA
Report Submission Date:September 3, 2026
Actual Project Completion Date:July 13, 2026Has the Completion Date Changed Since Funding Was Approved?:No
Total Actual Project Costs
from Beginning to End:
$6,000Have Costs Changed Since Funding Was Approved?:No
Updated Estimate of the Number of People Who Actually Will Be Served Daily:1,500Has the Estimate Changed
Since Funding Was Approved?:
No
Actual Measured Pump Capacity
in Liters Per Minute (LPM)
or Gallons Per Minute (GPM) :
43.33 LPM  |  11.45 GPMDepth of Well in Meters or Feet: 27.432 Meters  |  90 Feet
Actual Latitude, Longitude:1.053033, 31.073007Has Location Changed Since Funding Was Approved?:No

 

THE COMMISSIONING CEREMONY

It is clear how thankful the villagers are. The villagers have already built a fence system around the well to keep it safe from animals, as well as bars near the pump to limit the lever arc. This keeps the handle from being slammed to its maximum points, which would wear it out faster. The village has already shown that they will care for the well to the best of their abilities.

Jim West receives a gift of food from the grateful village elders.

“I, the chairperson of the above-mentioned village, on behalf of the entire community members of Kyebigoza B village, with great pleasure am extending our sincere thanks to Ingomar Living Waters for the gift of a borehole you have donated to us in our village. We are really happy because you have saved us from taking dirty water from ponds and swamps which have been causing several diseases in our lives which costs a lot of money in hospitals, even sometimes leading to death. Your donation will improve on health standards and hygiene in our communities and minimize diseases. This borehole will serve over 350 households with about 1500 people living in our village. May almighty God bless you so much. Yours faithfully, Tsyamgisa Tadeo.”

Village Elder

The village is so very grateful for the gift of clean water. They know, as you do, that water is life.

Thank you for changing the lives of these individuals!

All projects are made possible by World Changers.