COMPLETE
Drilling at Jesus Saves Primary School was unsuccessful for geological reasons. CEED drilled to 80 meters (312.83 feet) and still did not break through the rock below. This depth is the limit for a hand pump, and they reluctantly acknowledged they would need more funding to bring in their Big Rig and provide an electric pump. CEED has committed to completing this project on their own, and asked that we reallocate Jesus Saves’ funding for a hand pump in Rwembuba Village, Uganda. ILW agreed to the reallocation.
LOCATION
Rwembuba village in Kyamasenga Parish is located in Nyabutanzi s/county, Kagadi district, of Uganda.
CURRENT CONDITIONS
Rwembuba is a rural village of roughly 150 households and about 900 residents who rely entirely on a single open pond for water. The pond sits deep in a valley, making access potentially dangerous for children, pregnant mothers, and elderly community members who must navigate steep terrain to reach it. Because the water source is unprotected and shared with livestock and wild animals, it is continually contaminated by animal waste and natural debris.
The pond itself is extremely small, about 7 by 6 feet in diameter, and is located in a low, marshy area that collects runoff from surrounding hills. Rainfall further increases contamination, adding silt and bacteria to the stagnant water, which becomes a breeding ground for disease-carrying organisms.
As a result, waterborne illnesses are widespread. Typhoid fever regularly affects both children and adults, often requiring medical treatment that many families cannot afford. Diarrhea is also especially common. Leading to dehydration and malnutrition, among young children. These preventable illnesses contribute to the health challenges throughout the community.
The lack of clean water also creates daily human and economic burdens. Women and children spend hours walking to and from the valley to collect water, losing time needed for school, farming, childcare, and income-generating activities. Frequent sickness reduces adults’ ability to work consistently, lowering household income. Forcing families to face ongoing medical expenses for treating typhoid, diarrhea, and other waterborne diseases. Children will also miss school due to illness or because they must help fetch water.
Without a safe water source, Rwembuba remains trapped in a cycle of sickness, poverty, and limited opportunity. Establishing a protected, reliable borehole would create the foundation for long-term health and economic stability.
CEED’S EXPERIENCE
CEED has been drilling in Uganda for over 20 years, with over 1,000 wells done to date. The first well was drilled using the percussion method, which could drill inches in a day. A few years after the first well was dug, one of our donors saw the process and felt the call to donate two mobile drills for our use. These rigs could now drill a well in days. And then in 2023, we introduced our new big rig for use in areas where we encounter rock layers or other obstacles that the smaller drills cannot overcome, giving us one of the most versatile drilling fleets in East Africa.
The team is Ugandan-staffed and led through the efforts of Herbert Asiimwe, the Director of CEED Uganda. Herbert has been leading these drilling teams for over 20 years, and most of our drillers have been with CEED for over a decade. We have a dedicated team for each of the rigs, led by Rogers and Felix, who have both been with us for over 10 years.
We are sure to pay our workers good wages in Uganda. After all the workman is worth their wages, and one of CEED’s goals has always been to ensure that those working for us can support their families through the work they do.
Herbert Asiimwe is a licensed CPA who does his best to keep the operating costs as steady as he can. And oversight is done in the US office by both Kate Kuzko and the CEED board monthly.
WELL MAINTENANCE & REPAIRS
The funding for future repairs and maintenance is taken care of through a process we have developed over two decades of drilling. When a school or village is chosen for a well, a water source committee is formed. These are members of the village who are asked, or volunteer, to take care of the well. The village leadership and the water source committee sign a contract stating that they will do their best to set aside a few pennies per month to
help cover the cost of future repairs. The money is kept at the local bank, and CEED will request periodic checks on the accounts to make sure that the village is taking its responsibility seriously.
This method acts as a guarantee that the village will take ownership of the well. When something is wrong, they have the responsibility to reach out and let us know, so the wells can be repaired in a timely manner.
Without this process, the village would not take full ownership of the well. We have seen this in villages where other NGO’s come in to drill but leave without putting a plan of ownership in place. Those wells often break from small fixable issues, but the villages don’t contact anyone – it ‘wasn’t their well’ and they thought the NGO’s would come back. The committee and the water fund solved this issue, and none of the wells we have drilled over time have fallen into disrepair.
Our wells have an up rate of over 95%, and the other 5% were repaired and are back in working order.
In Rwembuba, a water source committee is already in the process of being established.
CHRISTIAN DISCIPLE-MAKING
Our wells are always part of Christian disciple-making outreach. We call what we do putting the gospel in action. We always share the Jesus film when we drill as well, played on a solar-powered projection system in the local dialect.
Every month we hear stories of Ugandans who accept Jesus as their savior through seeing the life of Jesus in their own language. Our team reports that 2-3 people a week tell us that they have found the Lord after watching this film.
Each rig, including the Big Rig has its own projection system, so no matter where or how we are drilling, we are sharing the gospel.
PROJECT COSTS AND TIMELINE
Total Project Cost: $6,000 for a borehole well with a hand pump.
Funding Requested: $6,000
Estimated Project Start Date: June 2026.
Estimated Project Completion Date: Late July 2026.
FUTURE IMPACT
Nearly 70% of all illnesses recorded in Uganda are due to bad water or having to go to the swamps to fetch water. Our own research has shown that there will be a 70% drop in illness once the new well goes in. They will no longer be suffering from Typhoid, Cholera and Bilharzia.
The children of the village won’t have to challenge wild animals for clean water any longer. They won’t have to risk being bitten by snakes when they gather clean water for their families. Since the well will be closer to the village, they also won’t need to spend time gathering water when they should be in school getting an education.
The older villagers will have a safe path to water, and the women won’t have to fight off monkeys and apes to provide for their families.
This is a small, rural town, far off the beaten track. However, we have seen the prosperity clean water brings. The village will likely find a way to start a school now that the children aren’t going back and forth from ponds and streams. We will see churches pop up, and the villagers will start growing crops to send to the larger trading centers, giving them access to funds to better feed, clothe and support their families. Water is the start of all of these things.
This well was deep, and the people here are grateful for the use of the big rig. The well is serving 900 people of this community and is located closer to the homesteads on the hill, allowing for easy access for many villagers. Oftentimes the best water is out in the middle of a banana patch or corn field; rarely can we get them water so close to home.
The villagers are already noticing a drastic decline in health issues since the new well went in. They are now rarely getting sick, and when they do it’s from Malaria only, from which we cannot fully save them. But even those cases will drop over time, as mothers and children are no longer venturing into the swamps for water.
THE DRILLING PHASE
| PROJECT COMPLETION REPORT | RWEMBUBA VILLAGE | UGANDA | |
| Report Submission Date: | November 3, 2026 | ||
| Actual Project Completion Date: | October 17, 2026 | Has the Completion Date Changed Since Funding Was Approved?: | Yes |
| Total Actual Project Costs from Beginning to End: | $6,000 | Have Costs Changed Since Funding Was Approved?: | No |
| Updated Estimate of the Number of People Who Actually Will Be Served Daily: | 900 | Has the Estimate Changed Since Funding Was Approved?: | No |
| Actual Measured Pump Capacity in Liters Per Minute (LPM) or Gallons Per Minute (GPM) : | 35 LPM | 9.244 GPM | Depth of Well in Meters or Feet: | 50 Meters | 164.042 Feet |
| Actual Latitude, Longitude: | 0.989905, 30.946658 | Has Location Changed Since Funding Was Approved?: | No |
The children of the village will have more time for an education. On average they will spend 2 days more a month in the classroom. Some will go to school for the first time.
Women are spending at least an hour a day less on gathering water. That’s more time to care for their families.
Everyone will see a noticeable increase in prosperity and health through the addition of clean water.
The project completion date was far too narrow for the project. It was a mistake on our end. It usually takes 2 weeks to clear funds, 2 weeks to drill, 2 weeks to cement and then commissioning. Our fastest turnaround
time is 6 weeks, and our average is closer to 8. We were still past that on the commissioning side, although we did have drilling and cement work done much sooner than expected.

All projects are made possible by World Changers.