COMPLETE
LOCATION
Bright Future Academy is located in Byimana Village in the Southern Province of Rwanda. There are 285 students today, over half of whom live in the village, and the school expects to add 600 more middle and high school age students over the next 3 to 5 years with a new school building under construction.
CURRENT CONDITIONS
The story of Bright Future Academy must start at the beginning.
In the early 1990s Rwanda experienced a horrific civil war that resulted in the genocide of nearly 1,000,000 people. After the civil war, in the mid 1990s, tens of thousands of war orphans wandered the streets with no homes, no families, and no future. The family of brothers Yohani Kayinamura and Jean Paul Ntabanganyimana saw the suffering in their town and opened their family home to these children. For over two decades, they cared for every child they could, expanded to a larger property, and many of those first children now have jobs and families of their own. Eventually, they started the charity Umuryango (see umuryango.org) to care for children who living in poverty.
However, all of that changed during the COVID pandemic. The government made a rule saying that all children needed to be placed with a direct family member. This meant that the children who were getting 2-3 meals a day, a Christian education, as well as love and care, were now put back into difficult circumstances. As a result, the brothers pivoted and opened Bright Future Academy.
At first, it was a way to gather the children back together to make sure they were getting enough food and care, and receiving an education. But soon, due to excellent teachers, dedicated staff, and the care of those knowing they are doing the work the Lord gave them to do, the school started attracting more and more students. The government even noticed their work and began bringing them more disadvantaged children to care for and educate. The school has done so well that its students have been ranking first in their district on their national exams.
Soon they had too many students for their original classrooms, and with the help of partners in the United States, they started construction of a new, larger school building that would house boarding students and give an education to both their borders and local children, with a capacity of over 900 estimated students.
But there was another problem arising. The school relied on city water to provide enough for drinking, cooking, and washing, with a small filtration tank for drinking. When there were only a hundred or so students, the system of sporadic city water service, rain collection, and storage tanks was enough to provide for everyone. But as the attendance numbers climbed, the system started to break down. Students now had to bring their own water from home in the morning, often from the unprotected streams and springs near the school, putting them at risk of waterborne illnesses. The staff did their best to accommodate the ever-growing need by driving to other known water sources up to 10 km away. These trips would cost the school 25,000 FRW ($17.22) each time but would also cost the staff hours as they waited in line for their turn to fill the van with enough water to supply the students. In particularly bad stretches, they would have to make this trip 20 or 30 times until the tanks could refill. This was not sustainable.
Without clean water, they will have to start turning students away, particularly those who are aging out of their current capacity. This means denying these children access to education, to food, and, for some, to shelter. They need water to continue the good work that they are doing.
CEED’S EXPERIENCE
This is our first well in Rwanda. However, at the time of writing this application, CEED has drilled wells in Uganda, Kenya and Tanzania and has experience working with teams across borders. The original surveyor was the same company we are able to use in Uganda, and Herbert Asiimwe, Director of CEED Uganda, is able to go back and forth to the site as the work progresses because of the open trade agreements between Rwanda and Uganda. So while we choose to use local drillers more accustomed to the terrain and unique challenges offered by each new region we drill in, we are still giving the same oversight and transparency that we bring to our projects in Uganda.

WELL MAINTENANCE & REPAIRS
We try to ensure that every well and water project is fully handed over to the school, village, or church to which it is attached. The reason for this is that full ownership extends the life of the well. Any time an NGO drills a well, but doesn’t fully transfer ownership, small repairs often turn into large problems because they go unreported by the village or school. But when a committee is in place, and ownership is established, small repairs are quickly fixed and the well is maintained so that larger breaks happen much less frequently. This process ensures that each project maximizes its lifespan, with many wells still fully operational over a decade after they were put into use.
In this instance, the school will need to set aside funds for basic maintenance on items such as pumps and pipes.
While schools in Rwanda are generally subsidized by the government, Bright Future Academy is privately funded through donors to the charity that runs the school, Umuryango, and by tuition payments from the student families that can afford tuition. So while repair funds would need to be added into the budget, we will be saving them hundreds of francs by eliminating the need to drive to and pay for water, and by reducing the need to pay for the unreliable city water. Some of those savings can be used for future maintenance.
CHRISTIAN DISCIPLE-MAKING
Bright Future Academy is a Christian school where every child is taught that they were created in the image of God, and that Christ died for them and loves them. The school shows these children that reality every day as they care for them, feed them, educate them and set them up for a future here as well as an eternal one. That is why this water project is so important; without water the project cannot grow. Without water the project cannot be sustained.
When the water problem first came to light at the beginning of the year, and American visitors asked how they were going to fix the issue, the response from the team in Rwanda was, “God knows that we need water; He will provide the way forward.” Less than a month later, a post from Ingomar Living Waters came across the American couple’s news feed, and the process began.
This school is trusting Christ every step of the way, and that active trust and obedience is one of the greatest witnesses to the children they serve.
PROJECT COSTS AND TIMELINE
Total Project Cost: $22,147 for a borehole well, electric pump, solar power installation, storage tank and water distribution system.
Cost Breakdown:
Hyrdo survey: $1,000
Materials: $13,940
Labor: $3,507
Other: $3,700 – includes the costs of all transportation to and from the site, as well as project management on all sides of the project as it unfolds. There are many parts to this project that we need to keep an eye on and that will require repeated site visits.
Future maintenance: The school will need to set aside some funds for basic maintenance on things like pumps and pipes.
Other Funding: None is anticipated for this phase of the project.
Funding Requested: $22,147
Date Funding Required: As soon as possible.
Estimated Project Start Date: One month after funding, to allow for mobilization.
Estimated Project Completion Date: 3-6 months after project start, which allows for possible delays.
YOUR IMPACT
The school is poised to grow rapidly. With the new building going up the school can triple in size in a few years. This means that there will be 900 children receiving needed meals, care and an education yearly. And you can estimate that roughly 50 to 100 students will matriculate a year. After one decade, there could be as many as 1,000 graduates beyond the students still enrolled in the school.
These students come from across Rwanda, and many are orphans. This school is their chance at a better life. Nearly one-third of them will be able to live at the school, which will provide hundreds of children a year with a safe place to sleep.
This project is also phase one of two phases. It will provide the school with the water needed to drink, wash, and cook with. As the buildings go up and are completed, a second phase that hooks the provided water into an indoor plumbing system will be possible. But none of that will happen without this first phase of finding and providing clean water to the school!
Each of these children will receive a top-notch education, which will in turn enable them to take care of their families in the future. This project is the chance to change the future of hundreds of families.
And clean water will help make al this possible.
The initial access path for the drilling rig to approach the borehole site at the bottom of a hillside owned by Bright Future Academy (BFA) traversed properties of five neighbors of BFA. And one of those neighbors would not agree to reasonable terms for allowing the drilling rig to traverse their property. So BFA hired workers to cut an alternate path down the hillside and through the woods to reach the borehole that stays 100% on BFA property. The video below shows the excellent work of cutting that access path. The drilling contracting company in Rwanda confirmed that the path is good and will allow the large drilling rig to approach the borehole. Drilling starts soon!
School has been back in session for 3 months now, and the well is in almost constant use. Everyday hundreds of students come to the well to drink clean water. No longer do they have to bring cans of dirty water with them to drink during the day. No longer do they have to rely on the spare resource of a rain catchment system that could not sustain the student body when it was only 300 students rather than the over 350 sudents that are currently enrolled.
The students are no longer missing classes on the hunt for water in the morning. No longer does the school have to spend time and money driving to other wells to buy water to sustain their boarding students, teachers, and day students. Now those funds can go into books, food, and other resources that will set these children up for the bright future the name of the school promises.
And at the end of the day, students are able to fill their Jerry cans before they head home, saving their mothers a second trip for water for the family. This means that the women in the surrounding homes are no longer having to walk far distances for bad water. They are able to spend the day on other tasks like feeding their families.
The water tower is located behind the admin building and in front of the building with the blue roof. The well head is down the hill. There were two factors that did delay this well. Unfortunately, the first drilling failed. The driller did not anticipate that the top portion of the well could be sandy. They did not account for this properly and the well collapsed. They claimed there was no water there and they moved the next site back by over 20 meters. This meant that we had to adjust the logistics on the kind of wiring the solar panels that are powering the pump head would need. The pump head is still on the property of the school, so it is still protected, and the much heavier wires have been placed underground for the protection of the students.
The second factor was that the Ebola crisis delayed an anticipated commissioning trip. We had to wait until the new semester started to officially hand off the well and see how the flow rates are holding up. So far, the well is still providing all the water the school needs in a day. After some more time has passed, we should be ready to assess what the school can do with the water next.
Note from CEED on the number of people using the well:
600 – 900 will be the student count when they fully open the new building…which is still not finished yet from what I was last told. When the new building is done they will have 600 students, mostly from adding the upper levels and welcoming back the secondary school stidents they don’t have classroom space for currently.
The well also serves the local villagers though too, at least 400 – 500 more people have access to the well already.
| PROJECT COMPLETION REPORT | BRIGHT FUTURE ACADEMY | UGANDA | |
| Report Submission Date: | October 6, 2026 | ||
| Actual Project Completion Date: | May 28, 2026 | Has the Completion Date Changed Since Funding Was Approved?: | Yes |
| Total Actual Project Costs from Beginning to End: | $21,147.00 | Have Costs Changed Since Funding Was Approved?: | No |
| Updated Estimate of the Number of People Who Actually Will Be Served Daily: | 600-900 students | Has the Estimate Changed Since Funding Was Approved?: | Yes |
| Actual Measured Pump Capacity in Liters Per Minute (LPM) or Gallons Per Minute (GPM) : | 30 LPM | 7.925 GPM | Depth of Well in Meters or Feet: | 62 Meters | 203.412 Feet |
| Actual Latitude, Longitude: | -2.141088, 29.739680 | Has Location Changed Since Funding Was Approved?: | No |

All projects are made possible by World Changers.