KAMUGEMBE LC1 VILLAGE, UGANDA

COMPLETE

STATUS

people impacted

dollars funded

FUNDED OCTOBER 9, 2025

LOCATION

Kamugembe LC1 Village, in Kijongo Parish, in the Kijongo Subcounty, is at the center of three villages. It has 210 households, of approximately 1,470 people, all in need of clean water. There is at least one church in Kamugembe, plus two primary schools and a small clinic. When the CEED team visited, they were welcomed into the church, where the village laid out the difficulties they were facing.

CURRENT CONDITIONS

There are no clean water sources near this village. The closest clean water is nearly 6 km away, which is too far for most of the women and children to walk safely or easily.  The only water sources they have close access to are a series of streams and ponds that dot the low-lying areas around the village, which is much higher on the hillside. The water sources are used by the local domestic animals, and also by wild animals, including baboons and other monkeys, exposing the villagers to zoonotic illnesses like Mpox (Monkeypox.)

The water itself is dirty and full of tadpoles, snakes, and bacteria that cause typhoid and other waterborne illnesses. Recently, there have been multiple deaths from waterborne illnesses, mostly among the very young. And the repeated cycles of illness have plunged the families into poverty. They commonly have to visit hospitals for everything from skin rashes, diarrhea, cholera, stomachaches, and, of course, typhoid.

None of these issues can be fixed by anything other than a clean water source.

CEED’S EXPERIENCE

CEED has been drilling in Uganda for over 20 years, with over 1,000 wells done to date. The first well was drilled using the percussion method, which could drill only inches in a day. A few years after the first well was dug, one of our donors saw the process and felt called to donate two mobile drills for our use. These rigs could now drill a well in days. In 2023, we introduced our new big rig for use in areas where we encounter rock layers or other obstacles that the smaller drills cannot overcome, giving us one of the most versatile drilling fleets in East Africa.

The team is Ugandan-staffed and led through the efforts of Herbert Asiimwe, the Director of CEED Uganda. Herbert has been leading these drilling teams for over 15 years, and most of our drillers have been with CEED for over a decade. We make sure we pay our workers good wages in Uganda. After all, the workman is worth their wages, and one of CEED’s goals has always been to ensure that those working for us can support their families through the work they do. 

Each well is individually funded, some from the USA and some from inside Uganda, as the Big Rig is contracted by the local government officials and schools. The proceeds from those wells go back into drilling in the poorer, remote villages. But over 80% of the rural population in Uganda still lacks access to clean water, so the work is still great.

Herbert Asiimwe is a licensed CPA, so he does his best to keep the operating costs as steady as he can. And oversight is done in the US office by both Kate Kuzko and the CEED board monthly.

We have spent many years finding the best way to drill, the best materials to use for long-lived wells, and the best way to engage the community both to keep the well running, and to keep it clean and healthy.

FUTURE MAINTENANCE AND REPAIRS

The funding for future repairs and maintenance is taken care of through a process we have developed over two decades of drilling. When the village is chosen for a well, they sign a contract stating that they will do their best to set aside a few pennies per month to help cover the cost of future repairs. They can do this by selling surplus water to local farmers, or by having a collection. The money is kept at the local bank, and CEED will request periodic checks on the accounts to make sure that the village is taking its responsibility seriously.

This method acts as a guarantee that the village will take ownership of the well. When something is wrong, they have the responsibility to reach out and let us know so the wells can be repaired in a timely manner. Without this process, the village would not take full ownership of the well. We have seen this in villages where other NGO’s come in to drill but leave without putting a plan of ownership in place. Those wells often break from small fixable issues, but the villages don’t contact anyone it ‘wasn’t their well’ and they thought the NGO’s would come back. The committee and the water fund solved this issue, and none of the wells we have drilled over time have fallen into disrepair.

CHRISTIAN DISCIPLE-MAKING

We typically try to drill as close to churches as we can, but even if there isn’t already a congregation planted in the area, the well plaques themselves also share scriptures, and the people know that the well was given to them by people who love them because Christ loves them.

And we always share the Jesus film when we drill as well, played on a solar-powered projection system in the local dialect. Every month, we hear stories of Ugandans who accept Jesus as their savior through seeing the life of Jesus in their own language.

Our team reports that 2-3 people a week tell us that they have found the Lord after watching this film. Each rig has its own projection system, so no matter where or how we are drilling, we are sharing the gospel.

PROJECT COSTS AND TIMELINE

Total Project Cost:  $5,000 for a borehole well and hand pump.

Cost Breakdown:

Materials:           $3,900
Labor:                     $650
Administration:   $450 – includes the costs of finding the wells for the application, photography costs, ongoing project                    management, etc. It goes directly to the work required to manage this specific well and not to any other project.

Future maintenance:  Covered by funds raised by the Water Source Committee

Other Funding: Each project is directly funded. We only bring in outside funding sources in case of a dry well or a larger project that we know going in will require more heavy-duty equipment. We don’t anticipate this here.  If the big rig is needed, Herbert has funds set aside to meet any overhead, although, since the rig belongs to us, overhead is usually a small cost. We do this so we can keep the U.S. costs as steady as possible for our Donors. 

Funding Requested from ILW:  $5,000

Date Funding Required:  As soon as possible.

Estimated Project Start Date: 2-3 weeks after funding is received in the US office

Estimated Project Completion Date: 2-3 months after the project starts, to allow time for cementing and commissioning.

 YOUR IMPACT

This village is already on the path to prosperity with the trading center and the clinic. If they had clean water as well, then they would be able to grow in health. The villagers would be able to work to better support their families with the addition of clean water. There would be more crops grown and more being sold in the trading center. The clinic would flourish with clean water nearby, meaning the workers there would be able to use the water to treat patients rather than relying on shipments.

The women would be able to do more at home and in the fields, not having to look for water during the dry season. The children would go to school. The two churches in the community would grow as the village grows and as outsiders learn about the place where the water is clean.

Often, the neighboring villages learn about CEED and request a well themselves, so one well has ripple effects out into the larger community.

COMPLETED DECEMBER 11, 2025

This project was completed in a very timely manner, with the well commissioning happening just about 3 months to the day from the funding. This was one of the villages our [CEED] team visited in the summer. They were eager to take us to their water source and then back to the church. The church serves Kamugembe, and also two other villages nearby. This water will bring life to many people.

BEFORE: The yellow circle is the proposed well site at the church.

AFTER: The completed well in the churchyard

THE CONSTRUCTION PHASE

PROJECT COMPLETION REPORTKAMUGEMBE LC1 VILLAGEUGANDA
Report Submission Date:12/11/2025
Actual Project Completion Date:12/4/2025Has the Completion Date Changed Since Funding Was Approved?:No
Total Actual Project Costs
from Beginning to End:
$5,000Have Costs Changed Since Funding Was Approved?:No
Updated Estimate of the Number of People Who Actually Will Be Served Daily:1,470Has the Estimate Changed
Since Funding Was Approved?:
No
Actual Measured Pump Capacity
in Liters Per Minute (LPM)
or Gallons Per Minute (GPM) :
12 LPM  |  3.17 GPMDepth of Well in Meters or Feet:63 Meters  |  206.693 Feet
Latitude, Longitude:1.603447, 31.34708Has Location Changed Since Funding Was Approved?:Not significantly. The well was put next to the church, but within about 100 m of the original spot.

 

Having clean water at the steps of the church also means that people will start coming to the church for water, but will stay to hear the gospel. This is what we mean when we say that we are carrying out the gospel in action. Already, the church is so grateful for this miracle, and it is a miracle. They have been waiting for water for many years, so to go from having CEED visit in June to having clean water in December is a Christmas miracle that they will never forget.

Striking Water!

CELEBRATING CLEAN WATER

This well is a testimony to Christ, which is more important than anything else. Clean water can change an earthly life, but the Living Water can change a person’s eternal trajectory. And that is what we are truly in the business of doing, changing lives in Christ’s name so that those who now have clean water can look to Him as their Source and their Redeemer.

A thank you note from the grateful people of
Kamugembe
and their neighbors

All projects are made possible by World Changers.