ST. PAUL’S NURSERY AND PRIMARY SCHOOL IN Kyenjojo, UGANDA

COMPLETE

STATUS

people impacted

dollars funded

FUNDED SEPTEMBER 25, 2025

LOCATION

St. Paul’s Nursery and Primary School is in Kyenjojo, in the Galiboleka Sub-County, Kagadi District of Uganda.

There are 480 pupils at the school, and 140 households in the village, for an estimated total of 1,180 people to be served by the proposed borehole well and hand pump.

CURRENT CONDITIONS

When you visit St. Paul’s school, the first thing you notice is how much care the teachers have taken to create a safe learning environment for their students. They have crafted buildings and latrines out of logs and mud, with dirt floors, and the teachers have painted lessons on the walls.

But many of their students will not be able to stay in the school due to typhoid. Many are barefoot and wear dirty clothes; their poverty is evident on their lean faces. Their parents are desperate to give them a better future, but without clean water, their days in school are numbered. They gather their water in the swamps at the bottom of the hills on which their school and homes have been built. The water is contaminated and dirty, causing many health problems, and their parents cannot afford both medication and tuition. 

Many of the children have rashes from the water they are trying to bathe in. Many suffer constantly from stomach ailments. They are locked in a cycle of poverty that can only be broken by access to clean water.

CEED’S EXPERIENCE

CEED has been drilling in Uganda for over 20 years, with over 1,000 wells done to date. The first well was dug with the percussion method, which could drill only inches in a day. A few years later, one of our donors watched the process and felt the call to donate two mobile drills for our use, which could drill a well in just days. In 2023 we introduced our new big rig for use in areas where we encounter rock layers or other obstacles that the smaller drills cannot overcome, giving us one of the most versatile drilling fleets in East Africa.

The team is Ugandan-staffed and led through the efforts of Herbert Asiimwe, the Director of CEED Uganda. Herbert has been leading these drilling teams for over 15 years, and most of our drillers have been with CEED for over a decade. We make sure we pay our workers good wages in Uganda. After all, the workman is worth their wages, and one of CEED’s goals has always been to ensure that those working for us can support their families through the work they do.

Each well is individually funded, some from the USA and some from inside Uganda, as the Big Rig is contracted by the local government officials and schools. The proceeds from those wells go back into drilling in the poorer, remote villages. But over 80% of the rural population in Uganda still lacks access to clean water, so the work is still great.

Herbert Asiimwe is a licensed CPA, so he does his best to keep the operating costs as steady as he can. And oversight is done in the US office by both Kate Kuzko and the CEED board monthly.

We have spent many years finding the best way to drill, the best materials to use for long-lived wells, and the best way to engage the community both to keep the well running, and to keep it clean and healthy.

WELL MAINTENANCE & REPAIRS

The funding for future repairs and maintenance is taken care of through a process we have developed over two decades of drilling. When the village is chosen for a well, they sign a contract stating that they will do their best to set aside a few pennies per month to help cover the cost of future repairs. They can do this by selling surplus water to local farmers, or by having a collection. The money is kept at the local bank, and CEED will request periodic checks on the accounts to make sure that the village is taking its responsibility seriously.

This method acts as a guarantee that the village will take ownership of the well. When something is wrong, they have the responsibility to reach out and let us know so the wells can be repaired in a timely manner. Without this process, the village would not take full ownership of the well. We have seen this in villages where other NGO’s come in to drill but leave without putting a plan of ownership in place. Those wells often break from small fixable issues, but the villages don’t contact anyone it ‘wasn’t their well’ and they thought the NGO’s would come back. The committee and the water fund solved this issue, and none of the wells we have drilled over time have fallen into disrepair.

CHRISTIAN DISCIPLESHIP

We typically try to drill as close to churches as we can, but even if there isn’t already a congregation planted in the area, the well plaques themselves also share scriptures, and the people know that the well was given to them by people who love them because Christ loves them.  And we always share the “Jesus film” when we drill, as well, played on a solar-powered projection system in the local dialect. Our team reports that 2-3 people a week tell us that they have found the Lord after watching this film. Each rig has its own projection system, so no matter where or how we are drilling, we are sharing the gospel.

Every month, we hear stories of Ugandans who accept Jesus as their savior through seeing the life of Jesus in their own language. 

PROJECT COSTS AND TIMELINE

Total Project Cost:  $5,000 for a borehole well and hand pump.

Cost Breakdown:

Materials:           $3,900
Labor:                     $650
Administration:   $450 – includes the costs of finding the wells for the application, photography costs, ongoing project                    management, etc. It goes directly to the work required to manage this specific well and not to any other project.

Future maintenance:  Covered by funds raised by the Water Source Committee

Other Funding: Each project is directly funded. We only bring in outside funding sources in case of a dry well or a larger project that we know going in will require more heavy-duty equipment. We don’t anticipate this here.  If the big rig is needed, Herbert has funds set aside to meet any overhead, although, since the rig belongs to us, overhead is usually a small cost. We do this so we can keep the U.S. costs as steady as possible for our Donors. 

Funding Requested from ILW:  $5,000

Date Funding Required:  As soon as possible.

Estimated Project Start Date: 2-3 weeks after funding is received

Estimated Project Completion Date: 2-3 months after the project starts, to allow time for cementing and commissioning

 YOUR FUTURE IMPACT

The school and the surrounding village will be transformed with the addition of clean water. Within a few weeks, the children will be clean and healthier. Within the year, many families will be able to break the poverty cycle, and their children will be ready to attend school. Dropout rates will disappear overnight, with only one or two students getting pulled, rather than losing dozens to poverty and illness each year.

Water will give these children a future where they can find jobs, go to trade school, support their families, and break poverty cycles they have been locked in for generations. All because of clean water.

COMPLETED DECEMBER 11, 2025

Before the borehole was installed at the school, the children had to travel long distances to look for water. They would have to walk to the swamps every day, which was dangerous for the children, both because the water is bad, and because the swamps are full of mosquitoes carrying malaria as well as snakes and frogs.  But now both the school and the community have clean water that is easily accessible. The well is right next to the school, close to the soccer pitch. The school does have some boarders, as most schools do, and these students will now be able to practice good hygiene. Also, the teachers have clean water to use for cooking. 

A Well is Coming Soon

Before the well went in, the children were often absent from school, because they were sick frequently. But now the children are healthy and the absences at the school have dropped to almost nothing. The children were suffering from typhoid and diarrhea, and now they are no longer suffering from either of those conditions. 

BEFORE

AFTER

THE CONSTRUCTION PHASE

St. Paul’s striking water

4 Views of the Actual Well Site After Drilling

 

PROJECT COMPLETION REPORTST. PAUL’S NURSERY AND PRIMARY SCHOOL, KYENJOJO VILLAGEUGANDA
Report Submission Date:December 10, 2025
Actual Project Completion Date:December 5, 2025Has the Completion Date Changed Since Funding Was Approved?:No 
Total Actual Project Costs
from Beginning to End:
$5,000Have Costs Changed Since Funding Was Approved?:No 
Updated Estimate of the Number of People Who Actually Will Be Served Daily:1180Has the Estimate Changed
Since Funding Was Approved?:
No
Actual Measured Pump Capacity
in Liters Per Minute (LPM)
or Gallons Per Minute (GPM) :
37 LPM  |  9.77437 GPMDepth of Well in Meters or Feet:60 Meters  |  196.85 Feet
Actual Latitude, Longitude:0.96196, 30.74739Has Location Changed Since Funding Was Approved?:Yes, it was moved higher up the hill and next to the school

THE COMMISSIONING CELEBRATION

The school has provided a video of thanks to Ingomar Living Waters that acknowledges these improvements.  We know from experience that the school will likely grow in the next few years, with improved enrollment, and this will lead to improved facilities, resources, and levels of education available. The future is brighter because of clean water.

St. Paul’s Commissioning Ceremony

St. Paul’s Primary School

All projects are made possible by World Changers.