GBAGBAJAKOU, Togo

COMPLETE

STATUS

people impacted

dollars funded

FUNDED SEPTEMBER 19, 2025

 LOCATION

Gbagbajakou (pronounced BA-BA-JA-KU) is a village of 2,500 people in the East Mono Region of Central Togo. Note that not everyone in the village will be able to draw water from this well each day. The pump itself will limit the number served daily to 1500. After the well is in, we will be able to reevaluate and see if more can be served with a generator that the village could buy to increase production. The pastor said from the beginning that they really need two wells, but we need to start with this and then evaluate. Possibly, we could put in a hand pump well in partnership with the village. But this is a hard reality in most Togolese villages. 

CURRENT CONDITIONS

In Gbagbajakou, clean water is not just scarce — it’s nearly nonexistent.  Every single day, women and girls walk one kilometer to fetch water from a polluted river — the same river where animals drink, bathe, and defecate. This is the water they drink. The water they cook with. The water they give to their children.

The contaminated and unclean water that the population of Gbagbajakou drinks leads to the transmission of diseases such as cholera, diarrhea, dysentery, hepatitis A, and typhoid fever. Approximately 300 children, 70 women, and 50 men die each year in this village due to a lack of drinking water, inadequate sanitation, and poor hygiene. Access to safe drinking water and sanitation is essential for this area.

CONFLICT IN THE AREA

Strong animism-fetishism influence, along with Islam influence, brings personal and family conflict. Families are persecuted by the witchdoctors and vodou priests.

These are the women of Gbagbajakou. They walked two kilometers to fetch this water from the Mono River during this rainy season. You can see the water we drink and give our children. This is a daily task for women.

Unnamed

The dry season is the most difficult time, since this river dries up.

YOUR EXPERIENCE IN THE AREA

We [Le Pont International] successfully partnered with four local water well drilling companies in Togo to complete our first 23 Living Water Wells. Additionally, we collaborate with 12 different church groups, including denominations like the Methodist Church. The proposed water well in Gbagbajakou will be developed in partnership with an established church in the area.

To ensure the project’s success, we have a dedicated full-time Water Well Manager who oversees every phase of the process — from preparation and construction to follow-up. The manager remains on-site throughout the entire project to guarantee everything runs smoothly. Our team also includes a Financial Administrator who works directly under our Executive Director for Togo, John Laba, who worked 12 years in Africa with Compassion International, ensuring full control, transparency, and accountability. They work together to make sure all funds are used strictly for the water well project, with no exceptions.

A woman drinks the dirty water that
she has just fetched from the Mono River.

FUTURE MAINTENANCE AND REPAIRS

The water wells come with a one-year full guarantee from the drilling company. To manage the well, the villagers have established a Water Well Management Committee. Villagers contribute a small fee each time they collect water, and these funds are used by the committee to cover repairs and maintenance. Additionally, the church takes responsibility for any ongoing maintenance and repair costs to ensure the well remains functional long-term

CHRISTIAN DISCIPLESHIP

The water will be available to everyone, and the well will be used by the church for outreach, evangelism and discipleship. We equip the partner pastor and church on how to use the water well for evangelism and discipleship. In 2024 a total of 448 people received the gift of salvation and became followers of Jesus Christ with 100 Muslims accepting Christ and Christian baptism through these Living Water Wells. NOTE – ILW does not fund projects where water access is restricted to only Christians.

This is their reality. A water well will change this reality into clean water in the village for these women and their families.

PROJECT DETAILS AND TIMELINE

Project Scope: Deep borehole well with solar-powered submersible  electric pump, storage tanks, water filtration and treatment, sanitation and latrines, and hygiene training.

Total Project Cost:  $15,000   

Funding Requested: $15,000

Other Funding: None

Date Funding Required: October 1, 2025

Estimated Project Start Date: November 1, 2025

Estimated Project Completion Date: December 1, 2025

YOUR IMPACT

The Future Impact of the Gbagbajakou Living Water Well:

1. Health – Immediate reduction in waterborne diseases, with a significant decrease in illness and death, especially among children.
2. Education – Girls will have the opportunity to attend school, no longer spending hours fetching water.
3. Food – Access to clean water will enhance villagers’ ability in food preparation, to grow vegetables, raise poultry, and fish. This will empower many to start small businesses and improve their livelihoods.
4. Spiritual – The church will become a central hub for both spiritual outreach and community development, sharing the gospel of Jesus Christ while strengthening the entire village.

COMPLETED FEBRUARY 10, 2026

The completion and inauguration of the Gbagbajakou well represent a significant milestone for the community, achieved despite complex regional challenges and logistical hurdles. While originally scheduled for completion by December 1, 2025, the project was successfully finalized on January 5, 2026, and officially inaugurated on January 9, 2026.

The original plaque was replaced with this sturdier, more permanent one. 

PROJECT TIMELINE AND REGIONAL CONTEXT
The slight delay in the project schedule was primarily due to localized unrest and heightened tensions between the Gbagbajakou villagers and Fulani migratory herders.

  • Conflict and Resolution: Significant incidents involving the destruction of local farmlands by livestock led to a major conflict that required direct government intervention to restore order and peace.

ECONOMIC AND LOGISTICAL CONSIDERATIONS
Despite external economic pressures and difficult geographical conditions, the project’s core budget remained stable.

INFLATION MANAGEMENT: While the national inflation rate impacted the cost of labor and raw materials, we successfully managed these fluctuations so that the overall project cost was not significantly affected.

  • Infrastructure Challenges: The project location is approximately 241 km (150 miles) from the capital, Lomé. The “deplorable” state of the connecting roads made transporting essential goods and equipment a daunting task.
  • Increased Oversight Costs: Due to these severe infrastructure limitations and the distance involved, the costs associated with project follow-up and monitoring have increased.

Despite these obstacles, the successful inauguration of the well marks a vital step forward in providing sustainable water access to the Gbagbajakou community.

“My name is Tétévi Odile, and I live in GBAGBADJAKOU. We suffer from a lack of water, and you have quenched our thirst. That’s why we are so happy about what you did by providing us with this well. We have been waiting  a long time for you to come.  If you could drill a second well for us, that would be wonderful.Thank you so much.“

😊

We are incredibly grateful to Ingomar Living Waters and its partner Le Pont International for providing this well. We no longer have to trek for hours to fetch contaminated water that causes stomach aches and other diseases; instead,
we have clean water right at our doorstep. This water is clean and accessible and high quality. May God bless everyone who made this life-changing gift possible.”

A Villager

PROJECT COMPLETION REPORTGBAGBAJAKOUTOGO
Report Submission Date:February 10, 2026
Actual Project Completion Date:January 6, 2026Has the Completion Date Changed Since Funding Was Approved?:Yes
Total Actual Project Costs
from Beginning to End:
$15,500Have Costs Changed Since Funding Was Approved?:Yes
Updated Estimate of the Number of People Who Actually Will Be Served Daily:3000Has the Estimate Changed
Since Funding Was Approved?:
Yes
Actual Measured Pump Capacity
in Liters Per Minute (LPM)
or Gallons Per Minute (GPM) :
50 LPM  |  13.2086 GPMDepth of Well in Meters or Feet:115 Meters  |  377.297 Feet
Latitude, Longitude:7.929827, 1.488854Has Location Changed Since Funding Was Approved?:Yes

 

We are so incredibly joyful!  Fetching water has been transformed from a grueling hardship into the highlight of our day! The well site is now a vibrant hub of laughter and sisterhood for us and our girls. Gone are the days of trekking long distances and straining our backs to scoop dirty water; now, we have a beautiful place to gather, share stories, and celebrate. We are so grateful for this gift of fun and health!”

A Woman in the Village

All projects are made possible by World Changers.