This project replaces the one in Holuta Kasadjan. Ghana. Despite a promising water survey, that well site proved to be undrillable. The funding that was provided last September for Holuka Kasadjan has been reallocated to Kpetegu, with no additional cost to ILW.
CURRENT CONDITIONS
Kpetegu is a farming community of approximately 500 people in Ghana’s Volta Region facing a severe and urgent water crisis. The livelihood of the village depends on agriculture, yet the very resource that sustains life — clean water — is dangerously scarce.
During much of the year, residents rely on a spring located three miles away. But in the dry season, the spring dries up completely. Families are then forced to walk another three miles to a neighboring village in search of a small, limited stream flowing from another spring. The journey requires climbing and descending steep, mountainous terrain, making it exhausting and dangerous — especially for women and children.
The water itself is unsafe. It is muddy, filled with leaves, and shared with animals. At times, villagers cannot even see what has contaminated it. As one resident shared, “Sometimes a snake may even die in the river, and we wouldn’t even see that, making our children sick.”
Waterborne diseases, including cholera, bilharzia, dysentery, and even river blindness, are frequent. With no clinic in the village and the nearest health facility five miles away — often impossible to access — illness becomes a constant and devastating burden. The scarcity of water has fractured daily life.
Competition for the limited water source is intense. Men often spend entire nights fetching water, just to provide for their families, leaving them exhausted and unable to farm the next day productively. As one farmer explained, “As farmers, we depend on water for personal consumption and our crops. But in the dry season, we are unable to feed ourselves and also to irrigate our crops. This affects our income and we are pleading for you to intervene.”
Senyo and Steve explain the problems of dirty water.
Children frequently arrive late to school or miss school entirely due to long water-fetching journeys. Women and children often go without bathing. The crisis has become so severe that some women have left the village in search of reliable water elsewhere. One woman painfully shared, “The unavailability of water has forced many of us to leave our husbands in search of water in nearby villages. Even some women have been forced to divorce their husbands because they couldn’t bear the burden of living without clean water. We beg you to come to our aid.”
When water scarcity begins to break apart families, the urgency cannot be overstated. A borehole in Kpetegu would be transformational. It would restore health, protect families, stabilize marriages, improve farming productivity, and keep children in school. It would eliminate dangerous nighttime water journeys and remove the daily fear of consuming contaminated water. Clean, safe water would not only sustain life — it would restore dignity, unity, and hope to an entire community.
OUR EXPERIENCE IN THE REGION
In recent weeks, Hope for Ghana has met with the Chief and community elders of Kpetegu, as well as the entire village, to understand their circumstances and their dire need for clean water.
Hope for Ghana hopes, with our water engineer, with whom we have worked for several years, to drill a water borehole in Kpetegu. Our water surveyor has confirmed the optimal point for drilling. Our water engineer and our team on the ground will monitor the effectiveness and proper use of the borehole constantly. A water committee within the community will be formed to ensure the safety and proper usage of this gift. Our engineer will provide periodic maintenance for the borehole, ensuring the longevity of this project, with all major maintenance costs coming to Hope for Ghana.
Four views of the proposed well site.
ACCOUNTABILITY
Steve Greene, MD, Hope for Ghana’s President, is on the ground in Ghana 4-5 months per year, managing and evaluating all projects. Senyo Gbormittah, Hope for Ghana’s Vice President of Operations, is on the ground throughout the year, constantly monitoring all projects.
All donations to Hope for Ghana are deposited into First National Bank in Pittsburgh. Funds are then transferred to Ghana Commercial Bank in Ghana, where Steve is the sole signatory, and Steve alone delegates the funds needed for materials and workmanship. For all transactions related to a project, receipts are obtained and transparently available to donors. No funds are used for the personal use of our team or for administrative overhead.
PROJECT SPECIFICS AND TIMELINE
Project Details: Provide a borehole well with a submersible electric pump, storage tank, water filtration & treatment, and hygiene training.
Total Project Cost: $5,000
Total Funding Requested: $5,000
Expected Start Date: February 2026
Expected Completion: March 2026
FUTURE REPAIRS AND MAINTENANCE
The water committee in many communities makes the decision to collect a small amount of money for each bucket of water. This money goes towards maintenance and repairs, while allowing a community to take ownership of the project.
At the same time, Hope for Ghana sets aside funds for future maintenance and repairs, knowing that there will be costs beyond the financial capability of the village.
CHRISTIAN DISCIPLESHIP
While Hope for Ghana is not a faith-based charity, our work shows the people of Ghana the face of God. Our gifts are given unconditionally and with immense love, expressing the true love of God. We enjoy handing out Bibles to community churches.
Hope for Ghana’s projects are accessible to people of all faiths.
YOUR IMPACT
Water is life! The gift of clean water is truly the gift of life. Our project will allow hundreds of people to drink clean, potable water instead of unhealthy, contaminated water. The morbidity and mortality of waterborne diseases will be reduced significantly.
80% of all diseases in Ghana are caused by unsafe water and poor sanitation. With clean water, the overall health of the community will be greatly improved, as diseases such as cholera, typhoid, and dysentery will be greatly reduced.
Healthy children can attend school, and their performance in school is so much better when they are healthy. Healthy men and women are more productive at home and at work, and better able to care for their families.
The impact of Hope for Ghana’s water project in Kpetegu will be felt today and for generations to come.
Hope for Ghana is proud to announce the successful completion and emotional inauguration of a life-changing borehole for Kpetegu, a resilient farming community of approximately 500 people in Ghana’s Volta Region. Because the community has no access to electricity, this project included both a mechanized borehole and a generator to ensure families have reliable access to clean, safe water for years to come. Today marks a defining moment for a village that has endured the daily burden of water scarcity for far too long.
For years, families depended on distant springs that required exhausting journeys across steep, mountainous terrain. During the dry season, those water sources often disappeared altogether, forcing villagers to travel even farther in search of muddy, contaminated water shared with animals. Waterborne diseases were common, farming suffered, children missed school, and the constant search for water placed an overwhelming burden on every household.
But today, everything has changed.
There were several changes to the original drilling plan and the well location. The water survey showed a different location, still within the village, as the optimal site. The drilling was delayed by an unusually heavy rainy season. For several weeks, the drilling rig could not traverse the muddy roads, and even after successfully drilling, heavy rains prevented the pouring of concrete and construction of the stand for the storage unit.
Note that the plaque shows a date of 28 December, 2025 because it was ordered at the time of funding, with the expected completion date from the application, before the rains came.
The inauguration was filled with overwhelming joy, gratitude, and celebration. As clean water began flowing from the borehole, the entire community gathered in jubilation. Singing and dancing quickly consumed the village. The relief was unmistakable. After years of uncertainty and struggle, the people of Kpetegu were witnessing an answer to prayers they had carried for a very long time.
The atmosphere was filled with deep gratitude. Parents looked on with hope for their children’s future, farmers celebrated knowing they would no longer spend countless hours searching for water, and families embraced one another with the shared realization that life in their village had been permanently transformed. What had once divided daily life was now bringing the entire community together in celebration.
What was once a daily struggle is now a dependable source of life within the community. Children can attend school consistently and in better health. Families can devote their time to farming and caring for one another instead of making dangerous journeys for unsafe water. The burden that once defined Kpetegu has finally been lifted.
This borehole is more than a source of water—it is a transformative turning point.
With clean, safe water now flowing in Kpetegu, health has been restored, dignity strengthened, and new opportunities have taken root. Families can look toward the future with renewed confidence, knowing that the daily struggle for survival has been replaced with the security of clean water. The impact of this project will be felt for generations, strengthening families, improving education, and creating a brighter future for the entire community.
,
| PROJECT COMPLETION REPORT | KPETEGU | GHANA | |
| Report Submission Date: | August 5, 2026 | ||
| Actual Project Completion Date: | August 3, 2026 | Has the Completion Date Changed Since Funding Was Approved?: | Yes, due to weather and road conditions |
| Total Actual Project Costs from Beginning to End: | $5,000 | Have Costs Changed Since Funding Was Approved?: | No |
| Updated Estimate of the Number of People Who Actually Will Be Served Daily: | 500 | Has the Estimate Changed Since Funding Was Approved?: | No |
| Actual Measured Pump Capacity in Liters Per Minute (LPM) or Gallons Per Minute (GPM) : | 70 LPM | 18.492 GPM | Depth of Well in Meters or Feet: | 100 Meters | 328.084 Feet |
| Actual Latitude, Longitude: | 6.8678007, 0.4707367 | Has Location Changed Since Funding Was Approved?: | Yes, due to change in optimal drilling point based on water survey |

All projects are made possible by World Changers.