NYEKORNAKPOE VILLAGE, GHANA

COMPLETE

STATUS

PEOPLE SERVED

DOLLARS FUNDED

FUNDED JULY 10, 2025

Nyekornakpoe is a resilient rural village in Ghana’s Volta Region, home to over 250 people. The community survives through peasant farming—growing maize, cassava, and pepper—while others engage in gari processing, fishing, kente weaving, and small-scale trading to support their families.

CURRENT CONDITIONS

Nyekornakpoe faces a critical challenge every single day: the lack of clean, safe water.

Currently villagers rely on rainwater and small streams for survival. But in the dry season, those sources dry up, and families are forced to walk a mile to fetch water from the River, Danyi. This water is dangerous—known to cause bilharzia and other serious illnesses. Streams close to the village are polluted by agrochemicals from nearby rice farms, yet people are left with no alternative but to drink from them, even knowing the risks.

As one woman painfully shared: “My children and I have been experiencing skin rashes for along time and typhoid, which health workers have informed us was caused by drinking polluted water.” An elderly man added: “I have been having diarrhea daily and I’ve been using the toilet at least five times a day. My son has also been battling severe itching and skin rashes. Everyday he has to apply menthol balm just to feel at ease.”

The health consequences in Nyekornakpoe are devastating. Villagers suffer frequently from cholera, dysentery, typhoid, bilharzia, and painful skin infections. In the dry season, those who can afford it pay for tricycles to carry them to the river to fetch water—an expensive option that most families simply cannot afford.

The impact on children is especially heartbreaking. School attendance drops dramatically in the dry season, with children arriving late or missing school entirely due to the long search for water. Others fall ill from contaminated water and miss weeks of school while recovering.

A borehole in Nyekornakpoe would be transformational. It would bring clean, accessible water to the village for the first time in its history—restoring health, dignity, and opportunity. Children would stay in school. Families would no longer live in fear of disease. And a whole community would be lifted from suffering into a future of health and hope.

Senyo explaining the problems of dirty water.

OUR EXPERIENCE IN THE REGION

Hope for Ghana in recent weeks has met with the Chief and community elders of Nyekornakpoe and the entire village to understand their circumstances and their dire need for clean water.

Hope for Ghana, with our water engineer with whom we have worked for several years, hopes to drill a water borehole in Nyekornakpoe. Our water surveyor has confirmed the optimal point for drilling. Our water engineer and our team on the ground will be constantly monitoring the effectiveness and proper use of the borehole. A water committee within the community will be formed to ensure the safety and proper usage of this gift. Our engineer will provide periodic maintenance for the borehole, ensuring the longevity of this project, with all major maintenance costs coming to Hope for Ghana.

 

Four views of the proposed well site.

ACCOUNTABILITY

Steve Greene, MD, Hope for Ghana’s President, is on the ground in Ghana 4-5 months per year, managing and evaluating all projects. Senyo Gbormittah, Hope for Ghana’s Vice President of Operations, is on the ground throughout the year, constantly monitoring all projects.

All donations to Hope for Ghana are deposited into First National Bank in Pittsburgh. Funds are then transferred to Ghana Commercial Bank in Ghana, where Steve is the sole signatory, and Steve alone delegates the funds needed for materials and workmanship. For all transactions related to a project, receipts are obtained and transparently available to donors. No funds are used for the personal use of our team or for administrative overhead.

PROJECT SPECIFICS AND TIMELINE

Project Details: Provide a borehole well with hand pump and hygiene training.

Total Project Cost: $5,000

– Materials:      $4,500
– Labor:            $   500

Total Funding Requested: $5,000

Expected Start Date:    September 2025
Expected Completion: December 2025

Men weaving

FUTURE REPAIRS AND MAINTENANCE

The water committee in many communities makes the decision to collect a small amount of money for each bucket of water. This money goes towards maintenance and repairs, while allowing a community to take ownership of the project.

At the same time, Hope for Ghana sets aside funds for future maintenance and repairs, knowing that there will be costs beyond the financial capability of the village.

CHRISTIAN DISCIPLESHIP

While Hope for Ghana is not a faith based charity, our work shows the people of Ghana the face of God. Our gifts are given unconditionally and with immense love, expressing the true love of God. We enjoy handing out bibles to community churches.

Hope for Ghana’s projects are accessible to people of all faiths.

YOUR IMPACT

Water is life! The gift of clean water is truly the gift of life. Our project will allow hundreds of people to drink clean, potable water instead of unhealthy, contaminated water. The morbidity and mortality of waterborne diseases will significantly be reduced. 80% of all diseases in Ghana are caused by unsafe water and poor sanitation. With clean water, the overall health of the community will be greatly improved, as diseases such as cholera, typhoid and dysentery are greatly reduced.

Healthy children are able to attend school, and their performance is so much better in school while healthy. Healthy men and women are more productive at home and at work, and better able to care for their families.

The impact of Hope for Ghana’s water project in Nyekornakpoe will be felt today, and for generations to come.

COMPLETED APRIL 17, 2025

Hope for Ghana is thrilled to announce the successful completion and emotional inauguration of a life-changing borehole for Nyekornakpoe, a resilient rural community of over 250 people in Ghana’s Volta Region. Due to the far-reaching depth of the water table, we provided a mechanized pump instead of the intended hand pump. Today marks a defining moment for a village that has long carried the daily burden of unsafe water.

For years, families depended on rainwater and distant streams that became unreliable in the dry season. When these sources failed, villagers were forced to walk long distances to the River Danyi, a contaminated source linked to bilharzia and other waterborne diseases. Even nearby streams were  unsafe, polluted by runoff from surrounding farms, leaving families with no truly safe option.

The impact on daily life was severe. Waterborne illnesses such as cholera, typhoid, dysentery, bilharzia, and persistent skin infections were common across the community. For many households, illness became a normal part of life, affecting both health and livelihoods, while children suffered missed school days and interrupted learning.

But today, everything has changed.

Note: The plaque for this well was designed and made in anticipation of our commissioning by the end of December 2025. But due to several challenges, the commissioning couldn’t happen until April. Rather than waste such a beautiful plaque, we used it here anyway.

The inauguration brought the entire village together in a moment of overwhelming joy and relief. As clean water began to flow from the borehole, the atmosphere became electric. What followed was pure celebration—cheering, singing, and dancing as families gathered around the source of water that many never thought they would see in their own community.

Tears of joy filled the faces of many as the reality sank in. There was dancing all around the borehole, as singing and celebration rose from every corner of the village. The moment was full of emotion—pure joy, deep gratitude, and a beautiful sense of relief that years of suffering had finally come to an end.

Below are five pictures of the finished well, from various angles.

PROJECT COMPLETION REPORTNYEKORNAKPOEGHANA
Report Submission Date:April 17, 2025
Actual Project Completion Date:April 16, 2025Has the Completion Date Changed Since Funding Was Approved?:Yes, due to weather and road conditions
Total Actual Project Costs
from Beginning to End:
$5,000Have Costs Changed Since Funding Was Approved?:No
Updated Estimate of the Number of People Who Actually Will Be Served Daily:250Has the Estimate Changed
Since Funding Was Approved?:
No
Actual Measured Pump Capacity
in Liters Per Minute (LPM)
or Gallons Per Minute (GPM) :
70 LPM  |  18.492 GPMDepth of Well in Meters or Feet:100 Meters  |  328.084 Feet
Actual Latitude, Longitude:6.801557, 0.323263Has Location Changed Since Funding Was Approved?:Yes, due to a revised optimal drilling point based on water survey

 

Across the village, there was a shared realization that life had changed forever. The fear of daily illness and the burden of long walks for unsafe water is now a thing of the past. What was once a daily struggle is now a source of life within the community.

Children can attend school consistently and in better health. Families can focus on farming and work without the constant interruption of water scarcity. The weight that once defined Nyekornakpoe has been lifted.

This borehole is more than a source of water—it is a transformative turning point.

With clean, safe water now flowing in Nyekornakpoe, health has been restored, dignity strengthened, and hope firmly established. The impact of this project will be felt for years to come—across homes, schools, and generations.

All projects are made possible by World Changers.