KISINISIMA, UGANDA

COMPLETE

STATUS

people impacted

dollars funded

FUNDED JUNE 12, 2025

LOCATION

Kisinisima, Uganda, in Kijonjomi Parish is in Isunga Sub-County, Kagadi District of Uganda.  There are about 1,260 people living here, an average 7 per household, plus a developing trading center, one Junior/Primary School, and one Church

CURRENT CONDITIONS

The water sources for this village are a series of scattered ponds and swampy areas. They are particularly shallow and prone to drying up when the rains stop, which forces the women to go farther and farther from home for clean water. The farther they go, the more instances of domestic violence occur in the village. Imagine having to travel for hours just to get for enough water for your family to drink, only to face anger and violence because you were gone too long and food isn’t on the table.

The water takes so long to collect that the people here only bathe occasionally, leaving them suffering from skin infections and sores. They rarely wash their clothes. And many of the women must wake long before the sunrise and work long after the sun sets just to try to do all they need to do in raising their families in these conditions.

There is a school here, but the children are often suffering from typhoid or malnutrition, as their families struggle to work between being sick and being away most of the day in search for water. Sometimes it is the children who go to collect water, meaning that young girls are often out of school permanently, putting them at risk of becoming mothers themselves at a very young age.

The water they are currently drinking contains runoff from the fields, where the lack of good sanitation has resulted in contamination like fecal matter in the water. That is how typhoid gets into the water system, though many of the villagers do not know enough about germ theory to know that that is what is happening. They also suffer from diarrhea and stomach illnesses.

Because the ponds are scattered, and young children often go out into the field to collect water, drownings sometimes happen, when no one is close enough to help if a child falls in and can’t get back out.

CEED’S EXPERIENCE

CEED has been drilling in Uganda for over 20 years, with over 1,000 wells done to date. The first well was drilled using the percussion method, which could drill inches in a day. A few years after the first well was dug, one of our donors saw the process and felt the call to donate 2 mobile drills for our use which could now drill a well in days. In 2023 we introduced our new big rig for use in areas where we encounter rock layers or other obstacles that the smaller drills cannot overcome, giving us one of the most versatile drilling fleets in East Africa.

The team is Ugandan-staffed and led through the efforts of Herbert Asiimwe, the Director of CEED Uganda. Herbert has been leading these drilling teams for over 15 years, and most of our drillers have been with CEED for over a decade. We make sure we pay our workers good wages in Uganda. After all, the workman is worth their wages, and one of CEED’s goals has always been to ensure that those working for us can support their families through the work they do.

Each well is individually funded, some from the USA and some from inside Uganda, as the Big Rig is contracted by the local government officials and schools. The proceeds from those wells go back into drilling in the poorer, remote villages. But over 80% of the rural population in Uganda still lacks access to clean water, so the work is still great.

Herbert Asiimwe is a licensed CPA, so he does his best to keep the operating costs as steady as he can. And oversight is done in the US office by both Kate Kuzko and the CEED board monthly.

WELL MAINTENANCE & REPAIRS

The funding for future repairs and maintenance is taken care of through a process we have developed over two decades of drilling. When the village is chosen for a well, they sign a contract stating that they will do their best to set aside a few pennies per month to help cover the cost of future repairs. They can do this by selling surplus water to local farmers, or by having a collection. The money is kept at the local bank, and CEED will request periodic checks on the accounts to make sure that the village is taking its responsibility seriously.

This method acts as a guarantee that the village will take ownership of the well. When something is wrong, they have the responsibility to reach out and let us know so the wells can be repaired in a timely manner. Without this process, the village would not take full ownership of the well. We have seen this in villages where other NGO’s come in to drill but leave without putting a plan of ownership in place. Those wells often break from small fixable issues, but the villages don’t contact anyone it ‘wasn’t their well’ and they thought the NGO’s would come back. The committee and the water fund solved this issue, and none of the wells we have drilled over time have fallen into disrepair.

CHRISTIAN DISCIPLE-MAKING

We typically try to drill as close to churches as we can, but even if there isn’t already a congregation planted in the area, the well plaques themselves also share scriptures, and the people know that the well was given to them by people who love them because Christ loves them.

And we always share the Jesus film when we drill as well, played on a solar-powered projection system in the local dialect. Every month, we hear stories of Ugandans who accept Jesus as their savior through seeing the life of Jesus in their own language.

Our team reports that 2-3 people a week tell us that they have found the Lord after watching this film. Each rig has its own projection system, so no matter where or how we are drilling, we are sharing the gospel.

PROJECT COSTS AND TIMELINE

Total Project Cost:  $5,000 for a borehole well and hand pump.

Cost Breakdown:

Materials:           $3,900
Labor:                     $650
Administration:   $450 – includes the costs of finding the wells for the application, photography costs, ongoing project management, etc. It goes directly to the work required to manage this specific well and not to any other project.

Future maintenance:  Covered by funds raised by the Water Source Committee

Other Funding: Each project is directly funded. We only bring in outside funding sources in case of a dry well or a larger project that we know going in will require more heavy-duty equipment. We don’t anticipate this here.  If the big rig is needed, Herbert has funds set aside to meet any overhead, although, since the rig belongs to us, overhead is usually a small cost. We do this so we can keep the U.S. costs as steady as possible for our Donors. 

Funding Requested from ILW:  $5,000

Date Funding Required:  As soon as possible.

Estimated Project Start Date: 2-3 weeks after funding

Estimated Project Completion Date: 2-3 months after funding

 YOUR IMPACT

We know that many of the villages we work in struggle with domestic violence, but this one has told us straight out that it is a problem. That means that it is a large problem that can no longer be swept under the rug. One of the first things we will do here is put a clause in the contract that stipulates that the existence of the well hinges on the men treating their wives with kindness and dignity. We can’t change a whole culture, but we can make things better, one village at a time.

Not only will the wives be spared domestic violence, but they will also be spared the risks of traveling on the open road. And they won’t have to spend hours searching for water. They will have time to take care of their families and work the fields. Some will even start cottage businesses with the time that they used to spend gathering water. Young girls will go to school, which will increase their chances of being able to contribute to their family and support themselves as they grow up. They will be less likely to be married off at a young age and will have more say in their future. Children will no longer be at risk of drowning for water, and they won’t be suffering from Typhoid, so they will be able to go to school instead.

The small trading center will flourish as the villagers have enough for themselves, and a little to sell to others. The school will grow, and the church will as well. Give it a year, and the village will be a whole new community. All because of a well.

COMPLETED SEPTEMBER 4, 2025

BEFORE

AFTER

AFTER

AFTER

AFTER

THE CONSTRUCTION PHASE

 

PROJECT COMPLETION REPORTKISINISIMA VILLAGEUGANDA
Report Submission Date:September 4, 2025
Actual Project Completion Date:August 18, 2025Has the Completion Date Changed Since Funding Was Approved?:No
Total Actual Project Costs
from Beginning to End:
$5,000Have Costs Changed Since Funding Was Approved?:No
Updated Estimate of the Number of People Who Actually Will Be Served Daily:1,260Has the Estimate Changed
Since Funding Was Approved?:
No
Actual Measured Pump Capacity
in Liters Per Minute (LPM)
or Gallons Per Minute (GPM) :
46 LPM  |  14 GPMDepth of Well in Meters or Feet:55 Meters  |  180 Feet
Actual  Latitude, Longitude:00.936988, 030.856761Has Location Changed Since Funding Was Approved?:No

THE COMMISSIONING CELEBRATION