MARONGO LC1 VILLAGE, UGANDA

COMPLETE

STATUS

people impacted

dollars funded

FUNDED JUNE 12, 2025

LOCATION

Marongo LC1, Kitetweka Village, Kisaigi Parish is in the Kakindo Sub-County, Kakumiro District of Ghana. There are 98 households, so close to 700 people live there. 

CURRENT CONDITIONS

The water source for this village is a small swampy area close to their homes. In the rainy season, it provides enough water, although the quality is poor, and drinking from it causes them to suffer from many diseases. In the dry season, it dries up completely, causing them to have to walk for hours in search of another source of water. The situation is so bad that many villagers have sold what little land they owned to try to find a better life elsewhere. Many of the households that are left either do not have enough land to sell or are reluctant to sell their family’s future. And what little money they do get from working the fields will largely go to treating typhoid. This means that this is one of the smaller villages that we have worked with, not because it started small, but because they are barely holding on.

The water they are currently drinking contains runoff from the fields, where a lack of good sanitation has resulted in contamination, like fecal matter in the water. That is how typhoid gets into the water system, although many of them do not know enough about germ theory to know that that is what is happening. They also suffer from diarrhea and stomach illnesses.

Swamps also attract frogs and snakes, so the women and children must be particularly careful as they go to collect water. And in the dry season, when they don’t know which direction to wander in for water, they run the risk of abuse and even sexual assault as they leave the boundaries of their village.

CEED’S EXPERIENCE

CEED has been drilling in Uganda for over 20 years, with over 1,000 wells done to date. The first well was drilled using the percussion method, which could drill inches in a day. A few years after the first well was dug, one of our donors saw the process and felt the call to donate 2 mobile drills for our use which could now drill a well in days. In 2023 we introduced our new big rig for use in areas where we encounter rock layers or other obstacles that the smaller drills cannot overcome, giving us one of the most versatile drilling fleets in East Africa.

The team is Ugandan-staffed and led through the efforts of Herbert Asiimwe, the Director of CEED Uganda. Herbert has been leading these drilling teams for over 15 years, and most of our drillers have been with CEED for over a decade. We make sure we pay our workers good wages in Uganda. After all, the workman is worth their wages, and one of CEED’s goals has always been to ensure that those working for us can support their families through the work they do. 

Each well is individually funded, some from the USA and some from inside Uganda, as the Big Rig is contracted by the local government officials and schools. The proceeds from those wells go back into drilling in the poorer, remote villages. But over 80% of the rural population in Uganda still lacks access to clean water, so the work is still great.

Herbert Asiimwe is a licensed CPA, so he does his best to keep the operating costs as steady as he can. And oversight is done in the US office by both Kate Kuzko and the CEED board monthly.

We have spent many years finding the best way to drill, the best materials to use for long-lived wells, and the best way to engage the community both to keep the well running, and to keep it clean and
healthy.

WELL MAINTENANCE & REPAIRS

The funding for future repairs and maintenance is taken care of through a process we have developed over two decades of drilling. When the village is chosen for a well, they sign a contract stating that they will do their best to set aside a few pennies per month to help cover the cost of future repairs. They can do this by selling surplus water to local farmers, or by having a collection. The money is kept at the local bank, and CEED will request periodic checks on the accounts to make sure that the village is taking its responsibility seriously.

This method acts as a guarantee that the village will take ownership of the well. When something is wrong, they have the responsibility to reach out and let us know so the wells can be repaired in a timely manner. Without this process, the village would not take full ownership of the well. We have seen this in villages where other NGO’s come in to drill but leave without putting a plan of ownership in place. Those wells often break from small fixable issues, but the villages don’t contact anyone it ‘wasn’t their well’ and they thought the NGO’s would come back. The committee and the water fund solved this issue, and none of the wells we have drilled over time have fallen into disrepair.

CHRISTIAN DISCIPLE-MAKING

We typically try to drill as close to churches as we can, but even if there isn’t already a congregation planted in the area, the well plaques themselves also share scriptures, and the people know that the well was given to them by people who love them because Christ loves them.

And we always share the Jesus film when we drill as well, played on a solar-powered projection system in the local dialect. Every month, we hear stories of Ugandans who accept Jesus as their savior through seeing the life of Jesus in their own language.

Our team reports that 2-3 people a week tell us that they have found the Lord after watching this film. Each rig has its own projection system, so no matter where or how we are drilling, we are sharing the gospel.

PROJECT COSTS AND TIMELINE

Total Project Cost:  $5,000 for a borehole well and hand pump.

Cost Breakdown:

Materials:           $3,900
Labor:                     $650
Administration:   $450 – includes the costs of finding the wells for the application, photography costs, ongoing project management, etc. It goes directly to the work required to manage this specific well and not to any other project.

Future maintenance:  Covered by funds raised by the Water Source Committee

Other Funding: Each project is directly funded. We only bring in outside funding sources in case of a dry well or a larger project that we know going in will require more heavy-duty equipment. We don’t anticipate this here.  If the big rig is needed, Herbert has funds set aside to meet any overhead, although, since the rig belongs to us, overhead is usually a small cost. We do this so we can keep the U.S. costs as steady as possible for our Donors. 

Funding Requested from ILW:  $5,000

Date Funding Required:  As soon as possible.

Estimated Project Start Date: 2-3 weeks after funding is received in the US office

Estimated Project Completion Date: 2-3 months after the project starts, to allow time for cementing and commissioning.

 YOUR IMPACT

Marongo village is currently at an inflection point. If no help comes, the people will have to leave the lands their families have been on for generations, just for the hope of water. But that fate would change with a borehole. The village would suddenly become a beacon of hope to both those who live there and the ones who had to leave. The villagers will be healthy enough to work the fields, and families that had to leave would start to return to their lands their parents and great grandparents worked.

The women would no longer have to walk for miles for a can of water. Instead, they would be able to work, either in the fields or out of their homestead, bringing in more money and food for their family. The children would be in school instead of being too sick to learn or having to walk so far to make it to school at all. Parents would be able to afford tuition instead of having to pay for medication.

With intervention, this village would start thriving. They would start to build new buildings, build schools, and build churches. They would be healthy and thriving.

COMPLETED SEPTEMBER 4, 2025

The well in Marongo LCI Village in Uganda is complete!  The village has been using the well since early August.

The photo below shows the well site before it was cleaned up. The second one is a slightly different view, with the same pathway in sight.

BEFORE

AFTER

THE CONSTRUCTION PHASE

 

PROJECT COMPLETION REPORTMARONGO VILLAGEUGANDA
Report Submission Date:September 4, 2025
Actual Project Completion Date:September 2, 2025Has the Completion Date Changed Since Funding Was Approved?:No
Total Actual Project Costs
from Beginning to End:
$5,000Have Costs Changed Since Funding Was Approved?:No
Updated Estimate of the Number of People Who Actually Will Be Served Daily:700Has the Estimate Changed
Since Funding Was Approved?:
No
Actual Measured Pump Capacity
in Liters Per Minute (LPM)
or Gallons Per Minute (GPM) :
32.5 LPM  |  9 GPMDepth of Well in Meters or Feet:34 Meters  |  110 Feet
Latitude, Longitude:01.091875, 031.147899Has Location Changed Since Funding Was Approved?:No

THE COMMISSIONING CELEBRATION

All projects are made possible by World Changers.