RUGOGIO LC1 VILLAGE, UGANDA

COMPLETE

STATUS

people impacted

dollars funded

FUNDED JUNE 12, 2025

LOCATION

Rugogio LCI, Kyobusige Village, is located in the Kasaigi Parish in the Kakindo Sub-county, Kakumiro District of Uganda. 

CURRENT CONDITIONS

Rugoigo LC1 is a large village with over 480 households within the boundaries, but we will be drilling in one of the sections of the village where 180 households are clustered, for coverage of 1,080 people daily.

The local water source is about .5 km away from where we are hoping to drill, and it is a series of open ponds located in deep bush. While this village shares the common problems of illness and poverty, their most pressing concern is that they have already lost two of the village children to drowning this year. The fear is that if they do not get another water source soon, they will lose more children before the year is out. The ponds are deep, and the sides tend to be steep, so once a child falls in, they have difficulty getting themselves back out of the water.

The village frequently suffers from typhoid, diarrhea, and skin infections. The latter has caused many of the villagers to avoid bathing in the water, which causes other skin issues as hygiene levels drop.

CEED’S EXPERIENCE

CEED has been drilling in Uganda for over 20 years, with over 1,000 wells done to date. The first well was drilled using the percussion method, which could drill inches in a day. A few years after the first well was dug, one of our donors saw the process and felt the call to donate 2 mobile drills for our use which could now drill a well in days. In 2023 we introduced our new big rig for use in areas where we encounter rock layers or other obstacles that the smaller drills cannot overcome, giving us one of the most versatile drilling fleets in East Africa.

The team is Ugandan-staffed and led through the efforts of Herbert Asiimwe, the Director of CEED Uganda. Herbert has been leading these drilling teams for over 15 years, and most of our drillers have been with CEED for over a decade. We make sure we pay our workers good wages in Uganda. After all, the workman is worth their wages, and one of CEED’s goals has always been to ensure that those working for us can support their families through the work they do. 

Each well is individually funded, some from the USA and some from inside Uganda, as the Big Rig is contracted by the local government officials and schools. The proceeds from those wells go back into drilling in the poorer, remote villages. But over 80% of the rural population in Uganda still lacks access to clean water, so the work is still great.

Herbert Asiimwe is a licensed CPA, so he does his best to keep the operating costs as steady as he can. And oversight is done in the US office by both Kate Kuzko and the CEED board monthly.

We have spent many years finding the best way to drill, the best materials to use for long-lived wells, and the best way to engage the community both to keep the well running, and to keep it clean and
healthy.

WELL MAINTENANCE & REPAIRS

The funding for future repairs and maintenance is taken care of through a process we have developed over two decades of drilling. When the village is chosen for a well, they sign a contract stating that they will do their best to set aside a few pennies per month to help cover the cost of future repairs. They can do this by selling surplus water to local farmers, or by having a collection. The money is kept at the local bank, and CEED will request periodic checks on the accounts to make sure that the village is taking its responsibility seriously.

This method acts as a guarantee that the village will take ownership of the well. When something is wrong, they have the responsibility to reach out and let us know so the wells can be repaired in a timely manner. Without this process, the village would not take full ownership of the well. We have seen this in villages where other NGO’s come in to drill but leave without putting a plan of ownership in place. Those wells often break from small fixable issues, but the villages don’t contact anyone it ‘wasn’t their well’ and they thought the NGO’s would come back. The committee and the water fund solved this issue, and none of the wells we have drilled over time have fallen into disrepair.

CHRISTIAN DISCIPLE-MAKING

We typically try to drill as close to churches as we can, but even if there isn’t already a congregation planted in the area, the well plaques themselves also share scriptures, and the people know that the well was given to them by people who love them because Christ loves them.

And we always share the Jesus film when we drill as well, played on a solar-powered projection system in the local dialect. Every month, we hear stories of Ugandans who accept Jesus as their savior through seeing the life of Jesus in their own language.

Our team reports that 2-3 people a week tell us that they have found the Lord after watching this film. Each rig has its own projection system, so no matter where or how we are drilling, we are sharing the gospel.

PROJECT COSTS AND TIMELINE

Total Project Cost:  $5,000 for a borehole well and hand pump.

Future maintenance:  Covered by funds raised by the Water Source Committee

Other Funding: Each project is directly funded. We only bring in outside funding sources in case of a dry well or a larger project that we know going in will require more heavy-duty equipment. We don’t anticipate this here.  If the big rig is needed, Herbert has funds set aside to meet any overhead, although, since the rig belongs to us, overhead is usually a small cost. We do this so we can keep the U.S. costs as steady as possible for our Donors. 

Funding Requested from ILW:  $5,000

Date Funding Required:  As soon as possible.

Estimated Project Start Date: 2-3 weeks after funding is received in the US office

Estimated Project Completion Date: 2-3 months after the project starts, to allow time for cementing and commissioning.

 YOUR IMPACT

A new well will instantly remove the drowning risk posed to the local children. All villagers will see fewer infections from typhoid, diarrhea, and skin infections, and the hygiene of the village will improve as mothers have access to clean water to bathe their children.

Medical costs will be greatly reduced for everyone in the village as people will spend less time sick and in need of medication. The adults will be able to work consistently in the fields as their health improves, which will put them in a better position to improve their lives through wages and crop sales. As the children get healthier, they will be able to go to school, which is the best way to help a community grow out of poverty.

COMPLETED JANUARY 15, 2026

Rugoigo Village has been using the well since September. The village is large, and this well is in a cluster of homes of roughly 1,000 people, though we expect that there will be more using the well during the dry seasons.

Counts and statistics aren’t something that the average village in Uganda keeps track of. But some of the same children pop up in each phase of the project. And they look happier, healthier, and cleaner in each one. It will be good to go back in a year and see how much the village has grown around the water.

These before and after photos were taken from the same plot of land,
although the before photo is a little closer to the main road.
Note the same building in the background in both photos.

Below are four-directional photos of the finished well.

CONSTRUCTION OF THE WELL

PROJECT COMPLETION REPORTRUGOGIO LC1 VILLAGE UGANDA
Report Submission Date:January 15, 2026
Actual Project Completion Date:September 4, 2025Has the Completion Date Changed Since Funding Was Approved?:No
Total Actual Project Costs
from Beginning to End:
$5,000Have Costs Changed Since Funding Was Approved?:No
Updated Estimate of the Number of People Who Actually Will Be Served Daily:1,000Has the Estimate Changed
Since Funding Was Approved?:
No
Actual Measured Pump Capacity
in Liters Per Minute (LPM)
or Gallons Per Minute (GPM) :
31.667 LPM  |  8.365 GPMDepth of Well in Meters or Feet:45 Meters  |  147.638 Feet
Latitude, Longitude:1.060913, 31.134442Has Location Changed Since Funding Was Approved?:No

 

The first draw of clean water!

CELEBRATING CLEAN WATER!