LOCATION
EKO is a village of 2,500 people in the East Mono Region of Togo, near the Mono River.
CURRENT CONDITIONS
In EKO, clean water is not just scarce — it’s nearly nonexistent. Every single day, women and girls walk nearly two kilometers to fetch water from a polluted river — the same river where animals drink, bathe, and defecate. This is the water they drink. The water they cook with. The water they give to their children.
And during the dry season, the situation becomes even more dire. The river dries up completely, and women are forced to dig into the barren riverbed in hopes of finding a few muddy drops — just enough to keep their families alive. This crisis can last up to six months every year.
In 2024 alone, over 200 people died in EKO from waterborne diseases like cholera, dysentery, typhoid, hepatitis A, and diarrhea. Many were children. And health workers believe the real number is even higher. Girls miss school because they spend hours walking for water. Families remain trapped in poverty because clean water is out of reach. The Minister of Water in Togo told us that the average woman spends three hours a day fetching water. In EKO, it’s likely even more. With your support, we can bring safe, sustainable clean water to EKO. We can help save lives, restore health, empower girls to stay in school, and break the cycle of poverty — one well at a time.
CONFLICT IN THE AREA
Strong animism-fetishism influence, along with Islam influence, brings personal and family conflict. Families are persecuted by the witchdoctors and vodou priests.
YOUR EXPERIENCE IN THE AREA
[Le Pont International] has successfully partnered with four local water well drilling companies in Togo to complete our first 20 Living Water Wells. Additionally, we collaborate with 12 different church groups, including denominations like the Methodist Church. The proposed water well in EKO will be developed in partnership with an established Baptist church in the area.
To ensure the project’s success, we have a dedicated full-time Water Well Manager, who oversees every phase of the process — from preparation and construction to follow-up. The manager remains on-site throughout the entire project to guarantee that everything runs smoothly. Our team also includes a Financial Administrator who works directly under our Executive Director for Togo, John Laba, who has worked 12 years in Africa with Compassion International, ensuring full control, transparency, and accountability. They work together to make sure all funds are used strictly for the water well project, with no exceptions.
FUTURE MAINTENANCE AND REPAIRS
The water wells come with a one-year full guarantee from the drilling company. To manage the well, the villagers have established a Water Well Management Committee. Villagers [will] contribute a small fee each time they collect water, and these funds [will be] used by the committee to cover repairs and maintenance. Additionally, the church [has taken] responsibility for any ongoing maintenance and repair costs to ensure that the well remains functional long-term.
CHRISTIAN DISCIPLESHIP
The water [will be] available to everyone, and the well [will be] used by the church for outreach, evangelism, and discipleship. We equip the partner pastor and church on how to use the water well for evangelism and discipleship. In 2024, a total of 448 people received the gift of salvation and became followers of Jesus Christ, with 100 Muslims accepting Christ and Christian baptism through these Living Water Wells.
PROJECT DETAILS AND TIMELINE
Project Scope: Deep borehole well with solar-powered electric pump, storage tank(s,) water filtration & treatment, sanitation & latrines, and hygiene training.
Total Project Cost: $15,000
Cost Break Down:
Funding Requested: $15,000
Other Funding: None
Date Funding Required: May, 2025
Estimated Project Start Date: June 1, 2025
Estimated Project Completion Date: July 1, 2025
YOUR IMPACT
The Future Impact of the EKO Water Well:
1. Health – Immediate reduction in waterborne diseases, with a significant decrease in illness and death, especially among children.
2. Education – Girls will have the opportunity to attend school, no longer spending hours fetching water.
3. Food – Access to clean water will enhance villagers ability to grow vegetables, raise poultry, and fish. This will empower many to start small businesses and improve their livelihoods.
4. Spiritual – The church will become a central hub for both spiritual outreach and community development, sharing the gospel of Jesus Christ while strengthening the village as a whole.
The well was completed on budget at just over $15,000.00, without overruns or underruns. There was a one-month delay due to unseasonal rains, which kept the drilling equipment from being transported to the drilling site.
We estimated 2,500 people to be served by this well, but now we find that 3,500 people will enjoy clean, fresh water daily!
We apologize for the delay. We wanted Le Pont’s new manager of partnerships and projects, Emile Gbemu, to compose this completion report, since he was on site for the drilling and inauguration of the well. But I [Rex Holt] needed to be involved with translating, along with our director, John Laba. So this report comes directly from the African field, prepared by the Africans who oversaw the project, namely Emile Gbemu and Director John Laba.
During the pumping test, after the borehole was dug and water was struck, women and their children came to get water from a hose the drillers attached to test the water. This is how desperate the women were for clean water.
| PROJECT COMPLETION REPORT | VILLAGE: EKO | COUNTRY: TOGO | |
| Report Submission Date: | 9/3/2025 | ||
| Actual Project Completion Date: | 8/14/2025 | Has the Completion Date Changed Since Funding Was Approved?: | Yes, due to heavy rain |
| Total Actual Project Costs from Beginning to End: | $15,004 | Have Costs Changed Since Funding Was Approved?: | Yes |
| Updated Estimate of the Number of People Who Actually Will Be Served Daily: | 3,500 | Has the Estimate Changed Since Funding Was Approved?: | Yes |
| Actual Measured Pump Capacity in Liters Per Minute (LPM) or Gallons Per Minute (GPM) : | 67 LPM | 17.7 GPM | Depth of Well in Meters or Feet: | 72 Meters | 236.220 Feet |
| Latitude, Longitude: | 7.968753, 1.455042 | Has Location Changed Since Funding Was Approved?: | Yes, by 200 meters |
My name is ADJO. I am so happy and pleased that water has come to my village. This well means that I will no longer have to walk long distances to fetch water from a polluted stream that makes my children sick. Now I have clean water in my own village. Thank you Ingomar Living Waters!”

All projects are made possible by World Changers.