AKUAC, SOUTH SUDAN

COMPLETE

STATUS

people impacted

dollars funded

FUNDED MAY  7, 2025

The women and children of Akuac, preparing to fetch water

LOCATION

Akuac is a small village located in Lakes State of South Sudan.  It is home to 108 households, approximately 750 people.

The project well will be located in Rumbek’s Akuac payam (Ah-KWAhCH), near the intersection of the Wau Highway and a newly constructed roadway that is anticipated to become a major thoroughfare in Lakes State. This community is over 1.5 miles south of Rumbek Center.

CURRENT CONDITIONS

Hundreds of families live on the far edge of development here without access to basic necessities like clean water and sanitation.
An estimated 60% of the population lacks access to water wells. With no nearby natural water sources, women and children must sometimes walk 2 to 3 hours to collect surface water after the rains.

People in Lakes State are predominantly cattle herders. Large herds are moved frequently through population areas searching for feed. Pathogens in cattle manure contaminate water sources through runoff and direct contact, especially during the rainy season when groundwater sources are most available.

This lack of clean water has devastating consequences. Diarrheal diseases remain one of the leading causes of death, claiming the lives of up to 10% of children before they reach the age of five. Parasitic diseases such as schistosomiasis and bacterial infections like trachoma are widespread due to the reliance on unsafe surface water for drinking. Rainy seasons, while offering some relief in water availability, bring heightened risks of cholera outbreaks. Tragically, life-saving treatments for these diseases are available only through international aid.

For women and children, fetching water is arduous and dangerous. Long journeys to collect water are exhausting, exposing them to injuries, and burning valuable calories. They also expose them to grave security risks, including the threat of rape, kidnapping, and even murder.

NOTE ON CONFLICT IN THE AREA

We asked Abukloi Foundation about potential violence in the Akuac payam, since some recent news articles mention conflict in South Sudan.  Their answer was this:

Although we, too, are concerned about political issues in South Sudan, Lakes State and Rumbek, in particular, are relatively stable areas. Even between 2013 and 2015, when South Sudan experienced widespread violence, Lakes State was classified as a “Green State,” as it was not directly affected by the fighting. Since 2019, Lakes has realized even more stability under its new governor. 

We are confident that the community in which we are drilling this well is not only stable but will also become a new center for economic development over the next several years. 

In the dry season, there is almost no water.

Women stand in a rainwater puddle, gathering water for their families.

OUR EXPERIENCE IN THE AREA

Abukloi Foundation has been intimately involved with the Akuac community for over 10 years in education, agriculture, and small business training. This past year, we began a health clinic. We have installed a drilled well for each of our projects. Our women’s garden project within the Akuac payam trains over 20 women in sustainable gardening practices. Although there is a well within the garden, the garden is fenced and locked for security reasons. Homes around the garden can access the water when the women are working.

Great Ruaha Drilling, headquartered in Juba, will survey the area, drill the well, and install a hand pump with a platform and soak-away area. We worked with Great Ruaha last year in the neighboring county, serving over 200 households.

Accountability Procedures

A project manager oversees work in Akuac in conjunction with community elders. Within the Abukloi Foundation, checks and balances of all financial transactions ensure work is completed correctly before the payment for work [is made]. All financial transactions are overseen by the foundation treasurer, executive director, and program manager.
❖ Project funds will be run through bottom-up participatory approaches.
❖Community representatives and Abukloi management staff have worked together on monitoring and evaluation to ensure funds are properly spent.
❖ In addition to the above, fund accountability will be ensured through the following controls and documentation in finance, procurements, and logistics management.
     i. Requisition forms for fund approval to ensure accountability.
     ii. Payment request forms
     iii. Quotations for suppliers
     iv. Purchase order forms
     v. Cash payment vouchers
     vi. Invoices
     vii. Receipts
     viii. Goods received notes and Delivery notes.

We [Abukloi Foundation] commit that all funds will go directly to the project and will not defray overhead costs.

Abukloi Foundation
Akuac Property

FUTURE MAINTENANCE AND REPAIRS

The repair and maintenance costs and training will be funded through Abukloi Foundation’s strategic development plan. The Akuac community will assign a team to be trained in managing and maintaining the water system. Training and maintenance will be supervised by Abukloi’s Agriculture Officer and Program Manager.

 Note the rotting vegetation in the pond.

CHRISTIAN DISCIPLESHIP

There is no direct Christian disciple-making outreach connected with this project. However, Abukloi Foundation is founded on the fundamental Christian principle of loving one’s neighbor. All contractual relationships are subject to Christian ethics and integrity. Witnessing the gospel of Jesus Christ is demonstrated by our love for one another, as evidenced by the development of a community partnership whereby all parties are mutually respected. There is a respectful sense of gratitude for God’s provision.

One of the beneficiaries of the well is a church whose bishop is a former student of Abukloi.

PROJECT DETAILS AND TIMELINE

Total Project Cost:  $10,650  

Cost Breakdown:

      • Materials:            $2,925  
      • Labor:                   $5,625
      • Administration:  $900
      • Other:                      $200

Future Maintenance:        $1,000

Describe Other Costs:      Signage

Other Funding:  $2,650

  • Abukloi Foundation:    $900
  • Private donors:           $1,750

Funding Requested from ILW:    $8,000

Date Funding Required:               As soon as possible (May 2025)

Estimated Project Start Date:    May 15, 2025

Estimated Completion Date:      June 15, 2025

 So little water in the dry season!

YOUR IMPACT

Akuac is one of the poorer payams of an already struggling area. Access to clean drinking water will have immediate beneficial impacts.

First, a water well [will] almost completely eliminate waterborne pathogens that devastate [the] community’s health. Dozens of children will survive their critical first years and be able to attend school.

Second, it will greatly reduce women’s and children’s workload as they will no longer spend hours retrieving water simply to survive, or tend to children who are thirsty and hungry. Sixty percent of the population will now be free to invest their time in activities to serve and improve their community, like agriculture and job-generating businesses.

Third, the project area is slated for future development, as evidenced by the creation of a regional dirt highway in the area. The well will be on property owned by Abukloi Foundation, part of a strategic economic development plan in Akuac.

Villagers return from collecting water.

COMPLETED AUGUST 26, 2025

 The well in Akuac, South Sudan, is finished!  The people of Akuac no longer have to search for drying pools of dirty water that makes them sick. They can get clean, fresh water in their own village.

Great Ruaha Drilling, who completed a project for us in January, has shifted its operations away from Lakes State, and could not transport equipment for one borehole project. They referred us to South Sudan Aquatic Drilling Company, who operates in Lakes, drilling boreholes for schools and NGOs. In June, our project managers visited their offices and successfully negotiated the same price for drilling the well.

RELOCATION OF THE DRILLING SITE

The original location of the well was chosen for its accessibility to the most people and consideration for future development. When the drillers arrived to conduct their assessment, they determined that the chosen location was not ideal for optimal water capacity. The well was drilled 100 meters southeast of the originally chosen location. The location remains easily accessible and is an ideal site for future land development.

PROJECT COMPLETION REPORTAKUAC, RUMBEK PAYAMSOUTH SUDAN
Report Submission Date:8/26/2025
Actual Project Completion Date:7/8/2025Has the Completion Date Changed Since Funding Was Approved?:Yes
Total Actual Project Costs
from Beginning to End:
$10,650Have Costs Changed Since Funding Was Approved?:No
Updated Estimate of the Number of People Who Actually Will Be Served Daily:750Has the Estimate Changed
Since Funding Was Approved?:
No
Actual Measured Pump Capacity
in Liters Per Minute (LPM)
or Gallons Per Minute (GPM) :
60 LPM  |  15.85 GPMDepth of Well in Meters or Feet:72 Meters  |  236.22 Feet
Latitude, Longitude:6.782223, 29.672778Has Location Changed Since Funding Was Approved?:Yes, about 100 meters from the planned site

 