COMPLETE
LOCATION
Kyabajumira Wansisa Village / Kihuuna Parish is located in the Kakindo Subcounty/ Kakumiro district of Uganda. There are 120 households for about 700 residents in Kyabajumira Wansisa.
CURRENT CONDITIONS
The water sources for this village are ponds that capture runoff from the hills. The villagers have done their best to keep animals out of the main pond by adding large branches and forming them into a fence, but animals still get in.
The women of the village report being exposed to domestic violence due to how long it takes them to collect water every day. And the village is spending large amounts of money on medicines for illnesses like typhoid. Medicine and medical care are expensive in Uganda. Most clinics require a vehicle to access them, and many times that costs money to rent. Then they must pay the doctor before they are seen, and the medication itself costs nearly a day’s wage for every day’s dose. So being ill, even with something that can be easily treated, is detrimentally expensive for a family.
Having no access to clean water keeps communities like this one in poverty. They are sick for large portions of their lives, which makes it difficult for children to go to school or for adults to work. Medical treatment is sparse and expensive, and for most families, any income that would have been set aside for school fees, better housing, better food, etc., will instead cover treatments for typhoid and malaria. It’s an endless cycle. They know that without even the dirty water, they would die in days, and they know that with the bad water, they will likely become sick.
But what can they do when there is no other choice?
CEED’S EXPERIENCE
CEED has been drilling in Uganda for over 20 years, with over 1,000 wells done to date. The first well was drilled using the percussion method, which could drill inches in a day. A few years after the first well was dug, one of our donors saw the process and felt the call to donate 2 mobile drills for our use which could now drill a well in days. In 2023 we introduced our new big rig for use in areas where we encounter rock layers or other obstacles that the smaller drills cannot overcome, giving us one of the most versatile drilling fleets in East Africa.
The team is Ugandan staffed and led through the efforts of Herbert Asiimwe the Director of CEED Uganda. Herbert has been leading these drilling teams for over 15 years and most of our drillers have over a decade of experience each, and most have been with CEED for over a decade. We are sure to pay our workers good wages in Uganda. After all the workman is worth their wages, and one of CEEDs goals has always been to ensure that those working for us can support their families through the work they do.
Each well is individually funded, some from the USA and some from inside Uganda. The Big Rig is contracted by the local government officials and schools. The proceeds from those wells go back into drilling in the poorer, remote villages. But over 80% of the rural population in Uganda still lacks access to clean water, so the work is still great.
Woman gathering dirty water for their families
WELL MAINTENANCE & REPAIRS
The funding for future repairs and maintenance is taken care of through a process we have developed over two decades of drilling. When the village is chosen for a well, they sign a contract stating that they will do their best to set aside a few pennies per month to help cover the cost of future repairs. They can do this by selling surplus water to local farmers, or by having a collection. The money is kept at the local bank, and CEED will request periodic checks on the accounts to make sure that the village is taking its responsibility seriously.
This method acts as a guarantee that the village will take ownership of the well. When something is wrong, they have the responsibility to reach out and let us know so the wells can be repaired in a timely manner. Without this process, the village would not take full ownership of the well. We have seen this in villages where other NGO’s come in to drill but leave without putting a plan of ownership in place. Those wells often break from small fixable issues, but the villages don’t contact anyone it ‘wasn’t their well’ and they thought the NGO’s would come back. The committee and the water fund solved this issue, and none of the wells we have drilled over time have fallen into disrepair.
PROJECT COSTS AND TIMELINE
Total Project Cost: $5,000 for a borehole well and hand pump.
Cost Breakdown:
Materials: $3,900
Labor: $650
Administration: $450 – includes the costs of finding the wells for the application, photography costs, ongoing project management, etc. It goes directly to the work required to manage this specific well and not to any other project.
Future maintenance: Covered by funds raised by the Water Source Committee
Other Funding: Each project is directly funded. We only bring in outside funding sources in case of a dry well or a larger project that we know going in will require more heavy-duty equipment. We don’t anticipate this here. If the big rig is needed, Herbert has funds set aside to meet any overhead, although, since the rig belongs to us, overhead is usually a small
cost. We do this so we can keep the U.S. costs as steady as possible for our Donors.
Funding Requested from ILW: $5,000
Date Funding Required: As soon as possible.
Estimated Project Start Date: 2-3 weeks after funding is received in the US office
Estimated Project Completion Date: 2-3 months after the project starts.
YOUR IMPACT
As far as the health of the villagers is concerned, even just 6 months after a well goes in, there will be an average 70% decrease in illnesses per day in the village. That means that families will stop reporting illnesses every other month, and many may not fall sick from the old waterborne illnesses at all in a year. The result is that they will be spending less money on medicine and more money on education, food, buildings, and community development. By decreasing waterborne illness, you are decreasing poverty.
And the local children will have the chance to go to school. There is no public education in Uganda. Every child who is in school must pay tuition to be there. School supplies are an additional fee as well. Many schools have uniforms, though they do allow for poorer students to come in what they have. So if a family is spending large amounts of money on medicine, then their children are not in school. If a family is healthier, then they can afford for the children to go to school, or to learn a trade and come back and support the family better.
If you were to revisit this village a year after the well started providing water, you’d find a cleaner village, with children on their way to school. There would be flowers and plants in front of businesses, the atmosphere would be happier. The people would look healthier, and the air of despondency would have been lifted. There is nothing quite as drastic as the change that clean water can make in the lives of these villages.
The village is already using the water source, and it’s already noticeable that the children are cleaner and starting to look healthier. Over the next few months, you will find that more of the children are going to school, more of the adults are healthy enough to work, and you will find new buildings and businesses going up around the well.
The before and after photos below show the drilled well without its concrete apron, and then again, after the concrete had been poured and dried. Both pictures show the same buildings in the background. The drilling was done during the Maize season, and the commissioning was in the Cowpea season…so please ignore the crop changes. The well is not very far from where it was originally expected to be located. This is a field next to the main road.
| PROJECT COMPLETION REPORT | KYABAJUMIRA WANSISA | UGANDA | |
| Report Submission Date: | Nov 10, 2025 | ||
| Actual Project Completion Date: | Oct 9, 2025 | Has the Completion Date Changed Since Funding Was Approved?: | Yes, due to clerical delays |
| Total Actual Project Costs from Beginning to End: | $5,000 | Have Costs Changed Since Funding Was Approved?: | No |
| Updated Estimate of the Number of People Who Actually Will Be Served Daily: | 700 | Has the Estimate Changed Since Funding Was Approved?: | No |
| Actual Measured Pump Capacity in Liters Per Minute (LPM) or Gallons Per Minute (GPM) : | 34 LPM | 8.98185 GPM | Depth of Well in Meters or Feet: | 32 Meters | 104.987 Feet |
| Actual Latitude, Longitude: | 1.090445, 31.218743 | Has Location Changed Since Funding Was Approved?: | No |
Originally, this project was expected to be done in July 2025. The delay was a clerical issue only; the well was put into use in August. [CEED] is working on overhauling their system of communication back and forth between the US and Africa on future projects.

All projects are made possible by World Changers.