COMPLETE
LOCATION
Kinoirya Village / Kibanjwa Parish is located in the Kitoba Subcountry / Hoima District of Uganda. There are 320 households for about 1500 residents in Kinoirya.
CURRENT CONDITIONS
The water source for this village is a collection reservoir that was dug to capture runoff from the hills. The path to the water source is very steep, and it is a difficult climb when carrying jerry cans full of water. The women spend a large portion of their day collecting water, which has led to an increase in domestic violence in this village. Or they send their children to gather water instead of sending them to school. These children often drop out altogether, which leads to increased child labor in the village.
This is the only water source around; they are also competing with the wildlife for the same water. In this area, close to the forest, there are even gorillas. If the gorillas are at the water source, the humans cannot get water that day. Thankfully, those days are rare, but it does add a layer of fear for those who must make the journey for clean water. And even when they can get to the water source safely, the animals will have made the water source even more dangerous by defecating in it.
The villagers also suffer frequently from typhoid, as the stream is fed by runoff from fields higher up on the mountain.
Lack of access to clean water keeps communities like this one in poverty. They are sick for large portions of their lives, which makes it difficult for children to go to school or for adults to work. Medical treatment is sparse and expensive, and for most families, any income that would have been set aside for school fees, better housing, better food, etc., will instead cover treatments for typhoid and malaria. It’s an endless cycle. They know without even the dirty water, they would die in days, and they know that with the bad water, they will likely be sick. But they have no other option.
CEED’S EXPERIENCE
CEED has been drilling in Uganda for over 20 years, with over 1,000 wells done to date. The first well was drilled using the percussion method, which could drill inches in a day. A few years after the first well was dug, one of our donors saw the process and felt the call to donate 2 mobile drills for our use which could now drill a well in days. In 2023 we introduced our new big rig for use in areas where we encounter rock layers or other obstacles that the smaller drills cannot overcome, giving us one of the most versatile drilling fleets in East Africa.
The team is Ugandan staffed and led through the efforts of Herbert Asiimwe the Director of CEED Uganda. Herbert has been leading these drilling teams for over 15 years and most of our drillers have over a decade of experience each, and most have been with CEED for over a decade. We are sure to pay our workers good wages in Uganda. After all the workman is worth their wages, and one of CEEDs goals has always been to ensure that those working for us can support their families through the work they do.
Each well is individually funded. Herbert is also a licensed CPA, so he does his best to keep the operating costs as steady as he can. Oversight is done in the US office by both Kate Kuzko and the CEED board monthly.
A village man describes the problems in getting drinkable water.
WELL MAINTENANCE & REPAIRS
The funding for future repairs and maintenance is taken care of through a process we have developed over two decades of drilling. When the village is chosen for a well, they sign a contract stating that they will do their best to set aside a few pennies per month to help cover the cost of future repairs. They can do this by selling surplus water to local farmers, or by having a collection. The money is kept at the local bank, and CEED will request periodic checks on the accounts to make sure that the village is taking its responsibility seriously.
This method acts as a guarantee that the village will take ownership of the well. When something is wrong, they have the responsibility to reach out and let us know so the wells can be repaired in a timely manner. Without this process, the village would not take full ownership of the well. We have seen this in villages where other NGO’s come in to drill but leave without putting a plan of ownership in place. Those wells often break from small fixable issues, but the villages don’t contact anyone it ‘wasn’t their well’ and they thought the NGO’s would come back. The committee and the water fund solved this issue, and none of the wells we have drilled over time have fallen into disrepair.
CHRISTIAN DISCIPLESHIP
We typically try to drill as close to churches as we can, but even if there isn’t already a congregation planted in the area, the well plaques themselves also share scriptures, and the people know that the well was given to them by people who love them because Christ loves them.
And we always share the Jesus film when we drill as well, played on a solar-powered projection system in the local dialect. Every month, we hear stories of Ugandans who accept Jesus as their Savior through seeing the life of Jesus in their own language. Our team reports that 2-3 people a week tell us that they have found the Lord after watching this film. Each rig has its own projection system, so no matter where or how we are drilling, we are sharing the gospel. We now have a projection system packed in with all our active rigs.
PROJECT COSTS AND TIMELINE
Total Project Cost: $5,000 for a borehole well and hand pump.
Cost Breakdown:
Materials: $3,900
Labor: $650
Administration: $450 – includes the costs of finding the wells for the application, photography costs, ongoing project management, etc. It goes directly to the work required to manage this specific well and not to any other project.
Future maintenance: Covered by funds raised by the Water Source Committee
Other Funding: Each project is directly funded. We only bring in outside funding sources in case of a dry well or a larger project that we know going in will require more heavy-duty equipment. We don’t anticipate this here. If the big rig is needed, Herbert has funds set aside to meet any overhead, although, since the rig belongs to us, overhead is usually a small cost. We do this so we can keep the U.S. costs as steady as possible for our Donors.
Funding Requested from ILW: $5,000
Date Funding Required: As soon as possible.
Estimated Project Start Date: 2-3 weeks after funding is received
Estimated Project Completion Date: 2-3 months after the project starts.
YOUR IMPACT
This village needs intervention. The women are tired, and many are abused at home because the chore of gathering enough water for their family takes so long that they have little time for anything else. Many children in this village have given up on getting an education because they need to gather water for hours a day. Both groups would see an instant improvement of their quality of life if they were given a clean water source in the center of the village.
As far as the health of the villagers is concerned, even just 6 months after a well goes in, there will be an average 70% decrease in illnesses per day in the village. That means that families will stop reporting illnesses every other month, and many may not fall sick from the old waterborne illnesses at all in a year.
Medicine and medical care are expensive in Uganda. Most clinics require a vehicle to access them, and many times that costs money to rent. Then they must pay the doctor before they are seen, and the medication itself costs nearly a day’s wage for every day’s dose. So being ill, even with something that can be easily treated, is detrimentally expensive for a family. By decreasing waterborne illness, you will be decreasing poverty.
The children will be able to go to school. If they don’t, their only choices for employment will be farming or manual labor. Without an education, they will be less likely to be able to own their own land or their own home. They will likely be subsistence farmers for the rest of their lives.
Many young men without an education end up with no job at all. Education is the key to breaking this cycle. If we can keep these kids healthy and help them to spend less time gathering water in the day, then we can help them go to school and change their lives.
| PROJECT COMPLETION REPORT | KIBOYIRA VILLAGE | UGANDA | |
| Report Submission Date: | 9/3/2025 | ||
| Actual Project Completion Date: | 9/3/2025 | Has the Completion Date Changed Since Funding Was Approved?: | Yes |
| Total Actual Project Costs from Beginning to End: | $5,000 | Have Costs Changed Since Funding Was Approved?: | No |
| Updated Estimate of the Number of People Who Actually Will Be Served Daily: | 1,500 | Has the Estimate Changed Since Funding Was Approved?: | No |
| Actual Measured Pump Capacity in Liters Per Minute (LPM) or Gallons Per Minute (GPM) : | 38.33 LPM | 10.126 GPM | Depth of Well in Meters or Feet: | 50 Meters | 164.042 Feet |
| Latitude, Longitude: | 1.51001, 31.25423 | Has Location Changed Since Funding Was Approved?: | Yes, slightly, still within the village |