COMPLETE
LOCATION
Rwamulinda Village, of the Budaka Parish, is located in the Kitoba Subcounty, Hoima District of Uganda. It contains 180 households, about 900 residents. But there is also a primary school in the town and two churches in the trading center in town. So an accurate count is difficult.
CURRENT CONDITIONS
The water source for this village is in the center of a swamp. The village is located at a crossroads with a trading center in the middle of the village. There are two churches in the village and a primary school, and everyone must draw water from the same dirty water source.
Instances of typhoid are very high in the area due to its low elevation. [Contaminants from above flow downhill into the water below.] The locals are also at increased risk for malaria, since they must travel through the swampy areas to get to their water source. And because this is the only water source around, they are also competing with the wildlife for the same water. Monkeys are common visitors to the water. They bring diseases of their own to the area, and there is danger of bites as the monkeys treat the women and children coming to the well as invaders into their territory.
The children also are at risk of drowning in the deep water of the well itself. One of the children recently fell into the well. Thankfully, there were adults close enough to hear the child’s cries for help, and they were able to rescue the child in time. But the ground around the well itself is very muddy in the wet season, so if a child falls in, they can’t get themselves back out of the water without an adult to help them.
No access to clean water keeps communities like this one in poverty. They are sick for large portions of their lives, which makes it difficult for children to go to school or for adults to work. Medical treatment is sparse and expensive, and for most families, any income that would have been set aside for school fees, better housing, better food, etc., will instead cover treatments for typhoid and malaria. It is an endless cycle. They know that without even the dirty water, they will die in days, and they know that with the bad water, they will likely be sick. But they have no other option.
CEED’S EXPERIENCE
CEED has been drilling in Uganda for over 20 years, with over 1,000 wells done to date. The first well was drilled using the percussion method, which could drill inches in a day. A few years after the first well was dug, one of our donors saw the process and felt the call to donate 2 mobile drills for our use which could now drill a well in days. In 2023 we introduced our new big rig for use in areas where we encounter rock layers or other obstacles that the smaller drills cannot overcome, giving us one of the most versatile drilling fleets in East Africa.
The team is Ugandan staffed and led through the efforts of Herbert Asiimwe the Director of CEED Uganda. Herbert has been leading these drilling teams for over 15 years and most of our drillers have over a decade of experience each, and most have been with CEED for over a decade. We are sure to pay our workers good wages in Uganda. After all the workman is worth their wages, and one of CEEDs goals has always been to ensure that those working for us can support their families through the work they do.
Each well is individually funded. Herbert is also a licensed CPA, so he does his best to keep the operating costs as steady as he can. Oversight is done in the US office by both Kate Kuzko and the CEED board monthly.
WELL MAINTENANCE & REPAIRS
The funding for future repairs and maintenance is taken care of through a process we have developed over two decades of drilling. When the village is chosen for a well, they sign a contract stating that they will do their best to set aside a few pennies per month to help cover the cost of future repairs. They can do this by selling surplus water to local farmers, or by having a collection. The money is kept at the local bank, and CEED will request periodic checks on the accounts to make sure that the village is taking its responsibility seriously.
This method acts as a guarantee that the village will take ownership of the well. When something is wrong, they have the responsibility to reach out and let us know so the wells can be repaired in a timely manner. Without this process, the village would not take full ownership of the well. We have seen this in villages where other NGO’s come in to drill but leave without putting a plan of ownership in place. Those wells often break from small fixable issues, but the villages don’t contact anyone it ‘wasn’t their well’ and they thought the NGO’s would come back. The committee and the water fund solved this issue, and none of the wells we have drilled over time have fallen into disrepair.
CHRISTIAN DISCIPLESHIP
We typically try to drill as close to churches as we can. There are two here, so it’s likely the well will be drilled at one of them. The well plaques also share scriptures, and the people know that the well was given to them by people who love them because Christ loves them. And we always share the Jesus film when we drill. Every month we hear stories of Ugandans who accept Jesus as their savior through seeing the life of Jesus in their own language.
PROJECT COSTS AND TIMELINE
Total Project Cost: $5,000 for a borehole well and hand pump.
Cost Breakdown:
Materials: $3,900
Labor: $650
Administration: $450 – includes the costs of finding the wells for the application, photography, and ongoing project management.
Future maintenance: Covered by funds raised by the Water Source Committee
Other Costs: If we hit rock, the well will need to be drilled by the big rig, so the well won’t cost more to drill.
Other Funding: Each project is directly funded. We only bring in outside funding sources in case of a dry well or a larger project that we know going in will require more heavy-duty equipment. We don’t anticipate this here. If the big rig is needed, Herbert has funds set aside to meet any overhead, although, since the rig belongs to us, overhead is usually a small cost. We do this so we can keep the U.S. costs as steady as possible for our Donors.
Funding Requested from ILW: $5,000
Date Funding Required: As soon as possible.
Estimated Project Start Date: 2-3 weeks after funding is received
Estimated Project Completion Date: 2-3 months after the project starts.
YOUR IMPACT
This is a village that is already poised for economic growth. With two churches, a school and a small trading center located on a well-traveled roadway. If they can have access to clean water their area will grow in leaps and bounds over the first year alone. The churches will expand, and school attendance will increase as families start to be able to afford to send their children to school. Other surrounding villages will also start sending their children to school as they see the village start to prosper thanks to clean water.
In even just 6 months after a well goes in there will be an average 70% decrease in illnesses per day in the village. So, in a village this size, before the well goes in we would expect to see around 100 to 200 people sick with some kind of water related illness on any given day.
After the well it will be closer to 50 people.
Medicine and medical care are expensive in Uganda. Most clinics requite a vehicle to access them, and many times that costs money to rent. Then you must pay the doctor before they will see you and the medication itself costs nearly a day’s wage for every day’s dose. So
being ill, even with something that can be easily treated, is detrimentally expensive for a family. By decreasing water borne illness you are decreasing poverty.
Businesses will start to open along the main access points into the village as farmers have more money for seed, more energy for tending and harvesting crops, and more abundance to sell and share. Women will have time to start businesses and girls will go to school. We have learned that if you put a well in a village, the village will heal and grow on its own. All because of clean water!
The well in Rwamulinda Village is finished, and the people are enjoying fresh, clean water near their homes for the first time!
The project is one month over the estimated timeframe, and we shifted the final drilling location to a plot of land next to the local school. This was a better site for the well and a greater benefit for the youngest villagers.
| PROJECT COMPLETION REPORT | RWAMULINDA VILLAGE | UGANDA | |
| Report Submission Date: | September 3, 2025 | ||
| Actual Project Completion Date: | September 3, 2025 | Has the Completion Date Changed Since Funding Was Approved?: | Yes |
| Total Actual Project Costs from Beginning to End: | $5,000 | Have Costs Changed Since Funding Was Approved?: | No |
| Updated Estimate of the Number of People Who Actually Will Be Served Daily: | 900 | Has the Estimate Changed Since Funding Was Approved?: | No |
| Actual Measured Pump Capacity in Liters Per Minute (LPM) or Gallons Per Minute (GPM) : | 66 LPM | 17.43 GPM | Depth of Well in Meters or Feet: | 56.7 Meters | 186.02 Feet |
| Actual Latitude, Longitude: | 1.51057, 31.26818 | Has Location Changed Since Funding Was Approved?: | Yes |

All projects are made possible by World Changers.