COMPLETE
LOCATION
Prime Junior High is part of Kijangi Parish in the Kijangi Sub County, Kakumiro District of Uganda. There are 420 pupils at the school, and 78 or more households are nearby, for roughly 350 more people who will use the water at the proposed well.
CURRENT CONDITIONS
The day the [CEED] team visited this village, they found the people mourning a 9-year-old boy. He had gone to the pond for a drink of water, fell in, and couldn’t get himself back out. The water source is an open pond. It is deep, and the sides are steep and muddy. Many [Ugandan] children don’t learn to swim unless they live near the large lakes, streams, or rivers. This has put the school and surrounding households into fear because there are many children here. The adults and other children are worried that it will happen again.
In addition, the students and villagers are frequently sick with typhoid, intestinal illnesses, and suffer from skin rashes. likely due to having to share the water with the local animals. The more the children are sick, the more school they miss. The more school they miss, the more likely they are to drop out of school. And this is a mixed boarding school, so parents may become too fearful to pay for their children to attend the school.
CEED’S EXPERIENCE
CEED has been drilling in Uganda for over 20 years, with over 1,000 wells done to date. The first well was drilled using the percussion method, which could drill inches in a day. A few years after the first well was dug, one of our donors saw the process and felt the call to donate 2 mobile drills for our use which could now drill a well in days. In 2023 we introduced our new big rig for use in areas where we encounter rock layers or other obstacles that the smaller drills cannot overcome, giving us one of the most versatile drilling fleets in East Africa.
The team is Ugandan staffed and led through the efforts of Herbert Asiimwe the Director of CEED Uganda. Herbert has been leading these drilling teams for over 15 years and most of our drillers have over a decade of experience each, and most have been with CEED for over a decade. We are sure to pay our workers good wages in Uganda. After all the workman is worth their wages, and one of CEEDs goals has always been to ensure that those working for us can support their families through the work they do.
Each well is individually funded. Herbert is also a licensed CPA, so he does his best to keep the operating costs as steady as he can. Oversight is done in the US office by both Kate Kuzko and the CEED board monthly.
We have spent many years finding the best way to drill, the best materials to use for long-lived wells, and the best way to engage the community, both to keep the well running, and to keep it clean and healthy.
WELL MAINTENANCE & REPAIRS
The funding for future repairs and maintenance is taken care of through a process we have developed over two decades of drilling. When the village is chosen for a well, they sign a contract stating that they will do their best to set aside a few pennies per month to help cover the cost of future repairs. They can do this by selling surplus water to local farmers, or by having a collection. The money is kept at the local bank, and CEED will request periodic checks on the accounts to make sure that the village is taking its responsibility seriously.
This method acts as a guarantee that the village will take ownership of the well. When something is wrong, they have the responsibility to reach out and let us know so the wells can be repaired in a timely manner. Without this process, the village would not take full ownership of the well. We have seen this in villages where other NGO’s come in to drill but leave without putting a plan of ownership in place. Those wells often break from small fixable issues, but the villages don’t contact anyone it ‘wasn’t their well’ and they thought the NGO’s would come back. The committee and the water fund solved this issue, and none of the wells we have drilled over time have fallen into disrepair.
A man describes the difficulties encountered in obtaining water. He tells of the recent drowning of a nine-year-old boy.
PROJECT COSTS AND TIMELINE
Total Project Cost: $5,000 for a borehole well and hand pump.
Cost Breakdown:
Materials: $3,900
Labor: $650
Administration: $450
Future maintenance: Covered by funds raised by the Water Source Committee, done by CEED
Other Costs: If we hit rock, the well will need to be drilled by the big rig, so the well won’t cost more to drill.
Other Funding: Each project is directly funded. We only bring in outside funding sources in case of a dry well or a larger project that we know going in will require more heavy-duty equipment. We don’t anticipate this case here. Also, if the big rig is needed, Herbert has funds set aside to meet any overhead, although since the rig belongs to us, it is usually a small additional cost. We do this so we can keep the US costs as steady as possible for our Donors.
Administration includes the costs of finding the wells for the application, photography costs, ongoing project management, etc. It goes directly to the work required to manage this specific well and not to another project.
Funding Requested from ILW: $5,000
Date Funding Required: As soon as possible.
Estimated Project Start Date: 2-3 weeks after the funding is received in the U.S. office
Estimated Project Completion Date: 2 -3 months after the funding is received to allow for time for cementing and commissioning.
CHRISTIAN DISCIPLESHIP
We typically try to drill as close to churches as we can. The plaques [on the wells] themselves also share scriptures, and the people know that the well was given to them by people who love them because Christ loves them.
We always share the Jesus film when we drill as well, played on a solar-powered projection system in the local dialect. Every month we hear stories of Ugandans who accept Jesus as their savior through seeing the life of Jesus in their own language. Our team reports that 2-3 people a week tell us that they have found the Lord after watching this film.
We now pack a projection system with all our active rigs.
YOUR IMPACT
It’s hard to quantify the value of giving these students, teachers, and villagers peace of mind. A borehole eliminates the risk of their children drowning for the sake of a drink of water. And it eliminates the real risk of surviving the gathering, only to fall sick from the water itself. These are kids whose families are sacrificing much for their futures. There is no public school in Uganda. Everyone must pay their own way. So these families have already put everything they have on the line. A borehole would make their children safe. It would make these kids healthy. The school would grow to include more students, more teachers, and likely bring better living conditions to the boarders.
These healthy children will be able to change the futures for their families. Most of them come from subsistence farm culture with crops grown on rented land, but they have the chance to learn how to own land and how to support their families and communities. But they can’t do that if they are too sick to learn. They can’t do that if they die at 9 years old
because the water hole was too dangerous for them to gather water from.
A well gives these kids a future.
Drilling at this school took place while the US CEED team was visiting. We spent two days here, and while the drill team worked, we taught the children about the dangers of going back to the bad water sources. As you can see, the well is right on school grounds, so the children do not have to walk more than 25 yards for clean water all throughout the day. Below is the letter that they sent to you along with the photos. We can also provide more video of the interactions if you’d like them.
We the fraternity of Prime Junior School and the residents of Ihiyangi Community hereby extend our sincere thanks to our donor for the big gift of a borehole which is going to provide us with safe clean water.
Previously we had been sharing water from ponds, swamps with both wild and domestic animals putting our lives to dangers of typhoid, cholera, malaria and others. We expect this borehole to serve the school plus the community around,
May the Almighty God bless you all abundantly.
The well was funded in May, drilled in June, cemented in July, and commissioned in August, which is a few weeks outside of what was promised, but still within a reasonable timeline.
| PROJECT COMPLETION REPORT | PRIME JUNIOR SCHOOL | UGANDA | |
| Report Submission Date: | Sep 3, 2025 | ||
| Actual Project Completion Date: | Aug 17, 2025 | Has the Completion Date Changed Since Funding Was Approved?: | No |
| Total Actual Project Costs from Beginning to End: | $5,000 | Have Costs Changed Since Funding Was Approved?: | No |
| Updated Estimate of the Number of People Who Actually Will Be Served Daily: | 770 | Has the Estimate Changed Since Funding Was Approved?: | No |
| Actual Measured Pump Capacity in Liters Per Minute (LPM) or Gallons Per Minute (GPM) : | 34.16 LPM | 9.024 GPM | Depth of Well in Meters or Feet: | 42.672 Meters | 140 Feet |
| Actual Latitude, Longitude: | 01.014328, 031.212032 | Has Location Changed Since Funding Was Approved?: | No |
A teacher at Prime Junior School thanks Ingomar Living Waters.