IJAKARA VILLAGE, UGANDA

COMPLETE

STATUS

people impacted

dollars funded

FUNDED FEBRUARY 26, 2025

LOCATION

Ijakara Village is located Marongo Parish, Bombo Subcounty, Hoima District, Uganda, on a packed dirt road about an hour out of Hoima city. The village is home to  1,300 villagers.

The main church building, one of two in the community, doubles as a school. The building has power lines running to it, but the village is too poor for electricity.

CURRENT CONDITIONS

There is a shallow well that the villagers use that sits about 4 km from the heart of the village, as well as a stream downhill from the church. However, neither water source is safe from being contaminated by groundwater, so while the water is close, it is still unhealthy for human consumption. Both sources get low during dry season, driving the women further and further out into the bush to find any water at all.

The village is plagued by high instances of typhoid, particularly in the children. The women who take the time to travel to the shallow well rather than the nearby swamp are risking attack along the way and domestic violence at home when their husbands feel that they have taken ‘too long’ at the well. Imagine being a mother who travels for an 8 km round trip just for the marginally cleaner water only to be accused of laziness and beaten because a meal is not on time.

The children are often sick, and it shows on their faces. And their parents are also frequently sick, which means that they can’t work their fields. Food is scarce, and money even more so. All of this can be changed with a well.

CEED’S EXPERIENCE

CEED has been drilling in Uganda for over 20 years, with over 1,000 wells done to date. The first well was drilled using the percussion method, which could drill inches in a day. A few years after the first well was dug, one of our donors saw the process and felt the call to donate 2 mobile drills for our use which could now drill a well in days. In 2023 we introduced our new big rig for use in areas where we encounter rock layers or other obstacles that the smaller drills cannot overcome, giving us one of the most versatile drilling fleets in East Africa.

The team is Ugandan staffed and led through the efforts of Herbert Asiimwe the Director of CEED Uganda. Herbert has been leading these drilling teams for over 15 years and most of our drillers have over a decade of experience each, and most have been with CEED for over a decade. We are sure to pay our workers good wages in Uganda. After all the workman is worth their wages, and one of CEEDs goals has always been to ensure that those working for us can support their families through the work they do.

Each well is individually funded. Herbert is also a licensed CPA, so he does his best to keep the operating costs as steady as he can. Oversight is done in the US office by both Kate and the CEED board monthly.

WELL MAINTENANCE & REPAIRS

The funding for future repairs and maintenance is taken care of through a process we have developed over two decades of drilling. When the village is chosen for a well, they sign a contract stating that they will do their best to set aside a few pennies per month to help cover the cost of future repairs. They can do this by selling surplus water to local farmers, or by having a collection. The money is kept at the local bank, and CEED will request periodic checks on the accounts to make sure that the village is taking its responsibility seriously.

This method acts as a guarantee that the village will take ownership of the well. When something is wrong, they have the responsibility to reach out and let us know so the wells can be repaired in a timely manner. Without this process, the village would not take full ownership of the well. We have seen this in villages where other NGO’s come in to drill but leave without putting a plan of ownership in place. Those wells often break from small fixable issues, but the villages don’t contact anyone it ‘wasn’t their well’ and they thought the NGO’s would come back. The committee and the water fund solved this issue, and none of the wells we have drilled over time have fallen into disrepair.

CHRISTIAN DISCIPLESHIP

We drill as close to churches as we can. And we always share the Jesus film when we drill. Every month we hear stories of Ugandans who accept Jesus as their savior through seeing the life of Jesus in their own language. The plaques share scriptures and the people know that the well was given to them by people who love them because Christ loves them.

PROJECT COSTS AND TIMELINE

Total Project Cost:  $5,000 for a borehole well and hand pump.

Future maintenance:  Covered by funds raised by the Water Source Committee

Other Costs:  If we hit rock, the well will need to be drilled by the big rig, so the well won’t cost more to drill.

Other Funding: Each project is directly funded. We only bring in outside funding sources in the case of a dry well, or for a larger project that we know going in will require more heavy-duty equipment. To our knowledge this well will require neither.

Funding Requested from ILW:  $5,000

Date Funding Required:  As soon as possible.

Estimated Project Start Date: Late February.

Estimated Project Completion Date: Cement by mid-March, Commissioning by early April.

 YOUR IMPACT

With the contract mentioned in the last section, CEED is able to make an impact on more than the health and wellness of the village. We can add a clause in for the village men to promise to stop domestic violence in the area or else we well take back the pump. We have never had to do so, but having the clause in the contract is enough to make a positive turn around in the lives of the women and girls of the village. We also know that even just 6 months after a well goes in there will be an average 70% decrease in illnesses per day in the village. So, in a village this size, before the well goes in we would expect to see around 100 people sick with some kind of water related illness on any given day. After the well it will be closer to 30 people.

Medicine and medical care are expensive in Uganda. Most clinics requite a vehicle to access them, and many times that costs money to rent. Then you have to pay the doctor before they will see you and the medication itself costs nearly a day’s wage for every day’s dose. So being hill, even with something that can be easily treated, is detrimentally expensive for a family. By decreasing water borne illness you are decreasing poverty.

Then there will be a point where the village will start improving. Money that was being spent on medicine will start to go towards educating the children, which will mean teachers will be heired and more students will start to come in from further away. The churches will increase in attendance. Businesses wills start to open along the main road as farmers have more money for seed, more energy for harvest, and more abundance to sell and share. Women will have time to run businesses and girls will go to school. We have learned that if you put a well in a village, the village will heal and grow on its own. All because of clean water.

COMPLETED SEPTEMBER 3, 2025

The well was drilled in July with the big rig. That was the earliest the drilling could be done because the area was rocky, and the big rig was tied up on other projects.

The cementing happened on August 4th, and the commissioning was completed September 2nd. The village is happy to be using the new well. 

THE CONSTRUCTION PHASE

PROJECT COMPLETION REPORTIJAKARAUGANDA
Report Submission Date:September 3, 2025
Actual Project Completion Date:September 2, 2025Has the Completion Date Changed Since Funding Was Approved?:Yes
Total Actual Project Costs
from Beginning to End:
$5,000Have Costs Changed Since Funding Was Approved?:No
Updated Estimate of the Number of People Who Actually Will Be Served Daily:1,300Has the Estimate Changed
Since Funding Was Approved?:
No
Actual Measured Pump Capacity
in Liters Per Minute (LPM)
or Gallons Per Minute (GPM) :
40 LPM  |  10.567 GPMDepth of Well in Meters or Feet:55 Meters  |  180.446 Feet
Latitude, Longitude:1.52854, 31.23491Has Location Changed Since Funding Was Approved?:Yes

 

THE COMMISSIONING CELEBRATION