FUNDING DETAILS
Ingomar Living Waters (ILW) partnered with the Catholic Diocese of Pittsburgh to raise funds for this project. A couple within the Catholic Diocese of Pittsburgh led a fundraiser at a local Pittsburgh Catholic church to help raise funds. Thank you to all of the ILW WORLD CHANGERS and Catholic parishioners whose collective generosity is bringing the gift of clean water to 4,000 people in Mwangika, Tanzania!
CURRENT CONDITIONS
St. James the Great Catholic Parish is in Mwangika which is a part of the Mwanza Region, Sengerema District in Tanzania, East Africa. Mwangika is located about 10 KM from Lake Victoria.
Due to the remote location, there is not any type of large-scale commerce activity to supply employment opportunities. Therefore, the people depend upon activities such as small-scale agricultural, preparing lumber for firewood and building material, raising livestock, traveling to Lake Victoria for fishing, and even bartering with their neighbors. Thus, the people live in severe poverty.
Walking is the main mode of mobilization for the people. Some families own a bicycle, or a motorcycle, or a bajaj (a type of motorized 3-wheeled auto rickshaw), and very few own a car or a truck.
Young boy’s dinner water
There are two seasons in Tanzania: a rainy season (November-April) and a dry season (May-October). During the rainy season, people may have more access to water, but the road conditions are more treacherous, and the water is dirty.
Water collection sources in Mwangika are family hand-dug wells and a freshwater spring. The hand-dug wells are inexpensive; however, they are primitive wells that are very shallow, thus making them susceptible to contamination and drying up. Most of these wells are dried up. A freshwater spring is the only reliable water source in Mwangika. There are several problems with fetching water from this spring. First, it is found several kilometers away from the town center where many live. Secondly, adults and children must traverse a perilous path to reach the water source. This includes many rocks, curves, steep inclines, insects, snakes, livestock, and other wild animals that frequent it. Additionally, since it is the only source of water, they must wait in long lines for their turn to access the small space to scoop the water. As a result, many women choose to arise very early in the morning or even go out at midnight to avoid the crowds. This causes strife in the family because the husband may accuse his wife of cheating since she is gone a long time. Also, one might think that this water is safe to drink but it is not, due to contamination from animals and people.
Since Mwangika has no safe, clean, and reliable water source, the local doctor is treating many illnesses which are directly related to the use of contaminated water. Dr. William Michael works at the Mwangika Health Center. Dr. Michael explained that he examines 10-20 people per day, up to 600 per month and around 4,000 patients annually. Approximately 80% of his patients are diagnosed with a water related disease. He has listed the top ten water borne diseases: typhoid fever, cholera, giardiasis, schistosomiasis, dysentery, hepatitis A, ascariasis, amoebiasis, diarrhea, and E. coli. Dr. Michael concluded by stating that he estimates up to 50 patients per year die from water-borne diseases. Another factor that needs to be considered is the fact that the women who are coming in for the delivery of their baby must bring their own bucket of water!
OUR EXPERIENCE
As an answer to help the people to have clean water, the Bishop of Geita, Bishop Flavian Kassala, made the decision to purchase a borehole driller and compressor. He had several meetings with knowledgeable businessmen who were experienced in water well installations. One of these men, donated a PQWT computer surveying machine. He also provided the PQWT training, including reading the surveys. Father David Majala and Father Gerald Singu are the priests who manage the water well projects. They began their water well projects in the diocese about three years ago.
This water well management team is responsible for surveying the land, purchasing the necessary materials, and supervising the four-man team that operates the drilling equipment and installs the materials. As of August 2024, they have successfully completed nine water wells. All nine wells are functional and still in operation. In addition, Father Hilary Faraja, pastor of St. James Parish, has established a water committee comprised of six parishioners and one community representative. Both water project teams are working together to ensure the best possible outcome, ownership of the project, and to ensure the future maintenance of the water project.
Established internal controls and verification will be used to ensure that the funds will go directly to the project and not for personal use or “overhead.” Specifically, the Diocese of Pittsburgh, Office of the Missions Department, will independently verify through email communication the validity of the project with the Bishop of Geita. After the project is verified, and the project is approved for funding from ILW, ILW will write the check to “Catholic Diocese of Pittsburgh – Missions” with a note in the memo line restricting the funds for “Mwangika, Tanzania Water Well Project ONLY”. The check will be processed and deposited, and after the check has cleared, The Catholic Diocese of Pittsburgh Missions Office will issue a check made payable to “The Diocese of Geita” again with a memo line restricting the funds as stated above. The check will then be deposited into a USA bank account established by the Diocese of Geita, in Denver, Colorado, from where the funds will be wire transferred to the Diocese of Geita, again stipulating the water well project.
FUTURE MAINTENANCE AND REPAIRS
As previously stated, Father Hilary, pastor of the Mwangika parish, has established a water committee. The committee will involve the community in the water well project by educatingthem in water hygiene and proper water well use and maintenance. They will ask all people for “Free Will” donations to create a maintenance fund.
CHRISTIAN DISCIPLESHIP
Bishop Kassala stated that the purpose of the water well projects was not merely bringing the necessity of clean water but also providing a place of community gathering. The people realize that the water well is on the Catholic parish property, and they know that they are welcomed. This brings people together regardless of their faith beliefs. This water well project will have two points of water distribution. The first will be on parish property. The second distribution point will be in the town center
which will provide more access.
PROJECT DETAILS AND TIMELINE
Project Scope: Deep borehole well with electric pump, solar panels, storage tanks, water distribution system, and hygiene training
Total Project Cost: $18,290
Cost Break Down:
Future Maintenance: The parish at Mwangika will take a collection periodically.
Date Funding Required: November 30, 2024
Estimated Project Start Date: November 30, 2024
Estimated Project Completion Date: December 31, 2025
OUR IMPACT
Since Mwangika is a small village, they do not keep records of the exact number of illnesses and deaths related to water-borne illnesses. However, the World Health Organization (WHO) reports that diarrhea due to contaminated water is the 4th leading cause of death in Tanzania.
The Diocese of Geita is initiating a team to educate the people on what causes the freshwater waterborne diseases, how the germs are spread, and the ways to reduce the diseases after the fresh water is acquired. The diocese will use a proven curriculum developed by a non-profit organization based in Kenya, Hydrating Humanity, that focuses on drilling clean water wells and hygiene education. Their statistics show that waterborne diseases are reduced only by up to 15% after clean water is provided. However, evidence shows that clean water combined with hygiene education produces results of disease reduction up to 75%! www.hydratinghumanity.org
The impact of providing a clean water source that will be located in a safe environment extends far beyond the statistical reduction of waterborne diseases. Women and young girls will no longer have to arise very early in the morning, leaving their families and missing out on school and other domestic responsibilities to travel long distances to fetch water. This project will not only bring easier access to water in a safe environment but will also bring hope for the future of many families.
THE CONSTRUCTION PHASE
| PROJECT COMPLETION REPORT | MWANGIKA VILLAGE | TANZANIA | |
| Report Submission Date: | April 13, 2025 | ||
| Actual Project Completion Date: | March 29, 2025 | Has the Completion Date Changed Since Funding Was Approved?: | Yes. Originally December 2024. |
| Total Actual Project Costs from Beginning to End: | $16,461 | Have Costs Changed Since Funding Was Approved?: | Yes, but ILW’s portion remained the same, |
| Updated Estimate of the Number of People Who Actually Will Be Served Daily: | 4,000 | Has the Estimate Changed Since Funding Was Approved?: | No. |
| Actual Measured Pump Capacity in Liters Per Minute (LPM) or Gallons Per Minute (GPM) : | 33 LPM | 8.7 GPM | Depth of Well in Meters or Feet: | 96 Meters | 315 Feet |
| Latitude, Longitude: | -2.4291667, 32.1236111 | Has Location Changed Since Funding Was Approved?: | No |
THE COMMISSIONING CELEBRATION

All projects are made possible by World Changers.