LOCATION
Kamajegere Village is located in the Kicucuura Sub County, Kagadi District of Uganda. The village is home to 480 households, about 2,400 villagers.
CURRENT CONDITIONS
This village is situated at a crossroads and is developing into a trading center. There are three churches and two primary schools in this place, but the closest clean water source is over 3 km away.
For the most part, the women of the village collect water from streams located along the roadside, which puts those who gather water at risk of being hit by a vehicle.
This village has plenty of challenges that go along with a lack of clean water. The villagers have poor overall hygiene and there is low school attendance due to illness. The water they collect is causing typhoid and other illnesses, particularly in the youngest villagers. Families suffer from poverty and hunger, as the adults in the family continue to contract typhoid from the water they drink.
There is another issue related to collecting water. The women of the village are at a known high risk of domestic violence because much of their day is spent gathering water. While clean water won’t solve all of the roots of this particular evil, it will give the women of the village more time to work in the home, in the fields and even to start their own businesses.
This village needs a safe water source so the children of the village, the women, and their families can break the cycles of poverty, abuse and illness.
CEED’S EXPERIENCE
CEED has been drilling in Uganda for over 20 years. The first well was drilled using the percussion method, which could drill only inches in a day. A few years after the first well was dug, one of our donors saw the process and felt called to donate two mobile drills for our use, which could now drill a well in days. In 2023 we introduced our new big rig for use in areas where we encounter rock layers or other obstacles that the smaller drills cannot overcome, giving us one of the most versatile drilling fleets in East Africa.
The team is Ugandan-staffed and led through the efforts of Herbert Asiimwe the Director of CEED Uganda. They are our exclusive drilling team in Uganda. Herbert has been leading these drilling teams for over fifteen years and most of our drillers have over a decade of experience each.
Herbert is also a licensed CPA, so the bookkeeping is kept to the highest standards, and oversight is done in the US office by both Kate Kuzko and the CEED board. Each well is funded individually and [the money] goes directly to the cost of running the drill and [paying] salaries for the teams on the ground. After all, the workman is worth their wages, and one of CEEDs goals has always been to ensure that those working for us can support their families through the work they do.
WELL MAINTENANCE & REPAIRS
The funding for future repairs and maintenance is taken care of through a process we have developed over two decades of drilling. When a village is chosen for a well, [some of the villagers form a water committee, who] sign a contract stating that they will do their best to set aside a few pennies per month to help cover the cost of future repairs. They can do this by selling surplus water to local farmers, or by having a collection.
This method acts as a guarantee that the village will take ownership of the well. When something is wrong, they have the responsibility to reach out and let us know, so the wells can be repaired in a timely manner. This process works and it grew out of many years of
experience in Uganda.
Without this process the village does not take full ownership of the well and before we implemented it we found that wells would break from small, fixable issues but they wouldn’t contact us because it “wasn’t their well.” The committee and the water fund solved this issue.
CHRISTIAN DISCIPLESHIP
We always use our drilling opportunities as a disciple making outreach. We try to dig our wells near churches or schools if possible. And we never exclude any one of any other faiths, so the well becomes a testimony to the mercy of the Lord. In this instance it will show the village the faithfulness of God. They have been praying for clean water, and the local clergy were the ones who begged CEED to visit this village. Therefore, funding this well will become a sign of hope and of the reality of the Gospel in action.
And we use the drilling itself as an outreach. One of our donors many years ago donated a solar-powered projection system, and recently has donated a second one to go with the Big Rig Team. During the drilling, people come from miles around to watch the
drilling while it is happening. While that is going on, the projection system is being charged. Then at night, we set up the projector and play “The Jesus Film.” a film about Jesus’ life, ministry, death, and resurrection in the local dialect of the area where the well is being drilled.
When the well is completed, we add the Ingomar plaque, usually with a verse telling the village why the water was gifted to them. The dedications are done by the local ministers of the church, turning even that event into a praise meeting.
PROJECT COSTS AND TIMELINE
Total Project Cost: $5,000 for a borehole well and hand pump.
Cost break out:
Future maintenance: Covered by funds raised by the Water Source Committee
Other Costs: If we hit rock, the well will need to be drilled by the big rig, so the well won’t cost more to drill.
Other Funding: Each project is directly funded. We only bring in outside funding sources in the case of a dry well, or for a larger project that we know going in will require more heavy-duty equipment. To our knowledge this well with require neither.
Funding Requested from ILW: $5000
Date Funding Required: As soon as possible
Estimated Project Start Date: Within 2-3 weeks of funding date
Estimated Project Completion Date: Within 2-3 months of funding date, based on when the commissioning can take place.
YOUR IMPACT
A clean well will give these villagers a chance to thrive. They will have money to feed their children and to give them an education at one of the two primary schools nearby, which is the best way for the village to break the poverty cycle and to establish themselves as a thriving community. They will be able to use their old water sources for their animals and to make bricks for new buildings.
The [full] impact of clean water on the families in village is almost immeasurable. We do know that on any given day 71% of the village that was previously sick will be healthy because they are not drinking contaminated water. The women of the village will spend less time
gathering water as well, and instead can join their husbands in the fields, or start cottage businesses. And they will be less likely to face domestic violence at home, due to spending hours of the day to gather water.
After a water source is brought to a village, the people there will spend less money on medicines and transportation to clinics and will be able to pay for tuition for their children, better seed for farming, save for supplies to build a sturdier home and even to buy a parcel of their own land to farm without having to rent.
If a family was spending over $150 a year on medicine, and they experience that 71% decrease in illness, then they will be saving close to $100 a year for investment in education, agriculture, and better food and shelter. If this is the case for all the families in the village, this will start to impact the whole village. In as little as a year the villagers will be healthier, and new buildings will have sprung up around the well.
As for the issue of domestic violence, we have experience in villages where this is an active issue. We can add a clause into the contract the village signs when they are granted their well. The contract states that they will stop abusing their wives, with the well itself as
collateral. They want the clean water we bring, and they come from a culture that is highly relational. Breaking contracts is not something that is taken lightly in their culture. As of today, we have not had to take a single well back in a village where this issue is prevalent. It’s a practical way to change a cultural norm for the benefit of the women and children of the village.
The two small schools that the village started for their children will grow as more families have money to send their children to the school where the water is. And with more students comes more money for books, and teachers leading to a better education and opportunities for the village children. The poverty cycle will now have a chance to be broken as families raise additional crops to sell, and children are educated and better prepared to help their families in the future. And as the plan is to put the well as close to one of the churches as we can, the three nearby church congregations will also grow in both size and influence in the village.


BEFORE

AFTER
This was one of the villages CEED visited on the team trip in 2024. It was one that suffered not only water-borne diseases, but also from domestic violence due to the distance the women traveled for water and the time needed for them to bring the water home.
This isn’t a culture where such things get reported for statistics. However, CEED put a clause in the agreements we made with the village that part of the ownership of the well is contingent on the men not beating their wives anymore. CEED can’t promise that there will never be another domestic dispute, but the village no longer accepts this as the normal way of marriage because of this borehole. The women of the village will live safer, happier, healthier lives because of this.
Thank you for giving them that chance.
THE CONSTRUCTION PHASE



| PROJECT COMPLETION REPORT | |||
| Report Submission Date: | December 10, 2024 | ||
| Actual Project Completion Date: | September 29, 2024 | Has the Completion Date Changed Since Funding Was Approved?: | No |
| Total Actual Project Costs from Beginning to End: | $3,500 | Have Costs Changed Since Funding Was Approved?: | No |
| Updated Estimate of the Number of People Who Actually Will Be Served Daily: | 1,400 | Has the Estimate Changed Since Funding Was Approved?: | Yes, down from 2,400 original estimate. |
| Actual Measured Pump Capacity in Liters Per Minute (LPM) or Gallons Per Minute (GPM) : | 37.8 LPM | 10 GPM | Depth of Well in Meters or Feet: | 56.7 meters | 186 feet |
| Latitude, Longitude: | 1.04053, 31.0645 | Has Location Changed Since Funding Was Approved?: | No |
THE COMMISSIONING CELEBRATION





TESTIMONIAL







All projects are made possible by World Changers.