KAHUMUZA VILLAGE, UGANDA

COMPLETE

STATUS

people impacted

dollars funded

FUNDED AUGUST 7, 2024

The funding for this borehole well and hand-pump was originally intended for Hanga Village in Western Uganda. Unfortunately, drilling with a big rig at 80 meters failed twice to produce sufficient water.  CEED will cover the costs to date for Hange, and keep that village for another donor, to provide a deeper borehole well with a solar-powered electric pump. That project will be more expensive, so the Hanga funding has been fully reallocated to Kahumuza Village.

LOCATION

Kahumuza Village is located in the Nyabutanzi Sub County, Nyamasega parish, Kagadi District of  Western Uganda.

CURRENT CONDITIONS

The Kagadi District is rocky and sandy, with very little water during the dry season. In the rainy season, the people of Kahumuza collect water from very sandy streams and ponds full of frogs and snails. The women and children who gather water usually end up with skin rashes and illnesses just from gathering the water. This is also where they get the sand and mud to make their bricks. Because of the high sand content, even after they have gathered their water, they must let it sit just to filter out the mud, clay, and sand for it to be drinkable.

This means that a woman could fill up her jerry can and find that a portion of the water was just undrinkable mud now sunk to the bottom of her container. The ponds are also deep, and cloudy, and they have had more than one drowning death in the past few years.

That is on top of the fact that the water will give everyone in the village typhoid at least once every calendar year.

CEED’S EXPERIENCE

CEED has been drilling in Uganda for over 20 years, with over 1,000 wells done to date. The first well was drilled using the percussion method, which could drill inches in a day. A few years after the first well was dug, one of our donors saw the process and felt the call to donate two mobile drills for our use which could each drill a well in just days. And then in 2023, we introduced our new big rig for use in areas where we encounter rock layers or other obstacles that the smaller drills cannot overcome, giving us one of the most versatile drilling fleets in East Africa.

The CEED drilling team is Ugandan-staffed and led through the efforts of Herbert Asiimwe, the Director of CEED Uganda. Herbert has been leading these drilling teams for over 15 years and most of our drillers have over a decade of experience each.  Herbert is also a licensed CPA, and the bookkeeping is kept to the highest standards, with monthly oversight in the US office by both Kate and the CEED board. Each well is funded individually, and we are sure to pay our workers in Uganda good wages.  After all, the workman is worth their wages, and one of CEED’s goals has always been to ensure that those working for us can support their families through the work they do.

CHRISTIAN DISCIPLESHIP

We always use our drilling opportunities as a disciple-making outreach. We try to dig our wells near churches or schools if possible. In addition, we never exclude individuals of any other faiths from access to the water, so the well becomes a testimony to the mercy of the Lord. In this instance, it will show the village the faithfulness of God. They have been praying for clean water, and the local clergy were the ones who begged CEED to visit this village. Therefore, funding this well will become a sign of hope and the reality of the Gospel in action.

And we will use the drilling itself as an outreach. One of our donors many years ago donated a solar-powered projection system and recently has donated a second to go with the Big Rig Team. During the drilling people come from miles around to watch the drilling while it is happening. While that is going on the projection system is being charged. Then at night, we set up the projector and play ‘The Jesus Film,” a film about Jesus’s life, ministry, death, and resurrection in the local dialect of the area where the well is being drilled.

PROJECT COSTS AND TIMELINE

Total Project Cost:  $5,000 for a borehole well and hand pump. This amount has already been paid, and is fully reallocated from the Hanga project.  No additional funding is needed for this well.

Cost break out:

  • Materials:              $3,900
  • Labor:                       $650
  • Administrative:        $450

Future maintenance:  Covered by funds raised by the Water Source Committee, done by CEED.

Other Costs:  If we hit rock, the well will need to be drilled by the big rig, so the well won’t cost more to drill.

Other Funding: Each project is directly funded. We only bring in outside funding sources in the case of a dry well, or for a larger project that we know going in will require more heavy-duty equipment. To our knowledge this well with require neither.

Funding Requested from ILW:  $5000

Date Funding Required:  As soon as possible

Estimated Project Start Date:  Within 2-3 weeks of project approval.

Estimated Project Completion Date: Within 2-3 months of project approval, based on when the commissioning can take place.

WELL MAINTENANCE & REPAIRS

The funding for future repairs and maintenance is taken care of through a process we have developed over two decades of drilling. When a village is chosen for a well, they sign a contract stating that they will do their best to set aside a few pennies per month to help cover the cost of future repairs. They can do this by selling surplus water to local farmers, or by taking up a collection. The money is kept at the local bank, and CEED will request periodic checks on the accounts, to make sure that the village is taking their responsibility seriously.

This method acts as a guarantee that the village will take ownership of the well. When something is wrong, they have the responsibility to reach out and let us know so the wells can be repaired in a timely manner.

Without this process, the village would not take full ownership of the well. We have seen this in villages where other NGOs have come in to drill but left without putting an ownership plan in place. Those wells often broke from small fixable issues, but the villages didn’t contact anyone because it “wasn’t their well” and they thought the NGOs would come back. A committee and the water fund solves this issue, and none of the wells we have drilled over time have fallen into disrepair.

YOUR IMPACT

These villagers here have never had water that wasn’t filled with mud. They’ve never had water that wasn’t contaminated with disease-carrying bacteria. After they get a well in the village, the average health improvement will be around 71%. That is an immediate impact that can be measured within the first month of a new well being put into the ground. After a year the villagers will have made improvements to their homes, opened new businesses, churches, and schools, and the children will be working on their education. All of this is possible through  access to clean water!

COMPLETED February 6, 2025

he well has been completed and the village now has clean water. The well was cemented at the end of December, and commissioned in late January. The village is home to a primary school, and the children who were once at high risk of drowning for a drink of water, can now safely access clean water. You can see them in the photos of the newly dug well and in the commissioning photos. The school will grow as they children are healthy enough to attend, learn and perform.

You will also notice that the villagers are cleaner, the children already look healthier. Before the well went in basic hygiene was not a priority when just gathering enough water to drink was a challenge. Now they can wash themselves, their children, their clothes etc., which reduces the risk of illness and skin ailments.

You can see the joy on the faces of the villagers. They have a hope for the future that they had been missing in their lives. The women don’t have to haul dirty water home to their families. They don’t have to send their children to a dangerous watering hole. The villagers are healthy enough to work the fields and are able to grow more and feed their families. All because of clean water.

BEFORE

AFTER

THE CONSTRUCTION PHASE

 

PROJECT COMPLETION REPORTKAHUMZAUGANDA
Report Submission Date:February 6, 2025
Actual Project Completion Date:December 19, 2025Has the Completion Date Changed Since Funding Was Approved?:Yes
Total Actual Project Costs
from Beginning to End:
$5,000Have Costs Changed Since Funding Was Approved?:No
Updated Estimate of the Number of People Who Actually Will Be Served Daily:2,500Has the Estimate Changed
Since Funding Was Approved?:
No
Actual Measured Pump Capacity
in Liters Per Minute (LPM)
or Gallons Per Minute (GPM) :
64 LPM  |  20 GPMDepth of Well in Meters or Feet:38 Meters  |  125 Feet
Latitude, Longitude:00.962968, 30.947181Has Location Changed Since Funding Was Approved?:No

THE COMMISSIONING CELEBRATION