LOCATION
Kinaga COU is located in the Kagadi District of Uganda. The proposed hand pump will service 768 people.
Note: This project was funded by reallocating the funding from Abira Village, Uganda, because the landowners would not provide an easement for the proposed well. Two different landowners were approached, but both of them refused to give access to their land. This behavior is unusual in CEED’s experience, but this is a new tribe with a new culture, who are suspicious of outsiders.
CURRENT CONDITIONS
The Kagadi district is very rocky, with water that collects on the surface in pools during the rainy season but evaporates during the dry. The water is close to the village, so distance isn’t an issue during the time when the pond is full. But as the water dries up, the women and children have to venture further and further into the bush and rocks to find water sources since most cannot afford to buy water.
Typhoid is prevalent, as it is the major issue for many of these villages. It is common for a family to have it 3 to 4 times a year, locking them into a cycle of poverty that they cannot escape without outside intervention. A clean water well would be enough to do so.
This village is located at a crossroads, making it a trading center for those who live further away, so even though the local numbers are small, there are countless others using the poor water sources every day. The area has three church congregations and a small school that would greatly benefit from a steady, clean water source.
CEED’S EXPERIENCE
CEED has been drilling in Uganda for over 20 years, with over 1,000 wells done to date. The first well was drilled using the percussion method, which could drill inches in a day. A few years after the first well was dug, one of our donors saw the process and felt the call to donate 2 mobile drills for our use which could now drill a well in days. And then in 2023 we introduced our new big rig for use in
areas where we encounter rock layers or other obstacles that the smaller drills cannot overcome, giving us one of the most versatile drilling fleets in East Africa.
The team is Ugandan staffed and led through the efforts of Herbert Asiimwe the Director of CEED Uganda. Herbert has been leading these drilling teams for over 15 years and most of our drillers have over a decade of experience each. Herbert is also a licensed CPA the bookkeeping is kept to the highest standards and oversight is done in the US office by both Kate and the CEED board monthly.
Each well is funded individually. And we are sure to pay our workers good wages in Uganda. After all the workman is worth their wages, and one of CEEDs goals has always been to ensure that those working for us can support their families through the work they do.
WELL MAINTENANCE & REPAIRS
The funding for future repairs and maintenance is taken care of through a process we have developed over two decades of drilling. When the village is chosen for a well, they sign a contract stating that they will do their best to set aside a few pennies per month to help cover the cost of future repairs. They can do this by selling surplus water to local farmers, or by having a collection. The money is kept at the local bank, and CEED will request periodic checks on the accounts to make sure that the village is taking its responsibility seriously.
This method acts as a guarantee that the village will take ownership of the well. When something is wrong, they have the responsibility to reach out and let us know so the wells can be repaired in a timely manner.
Without this process, the village would not take full ownership of the well. We have seen this in villages where other NGOs come in to drill but leave without putting a plan of ownership in place. Those wells often break from small fixable issues, but the villages don’t contact anyone it ‘wasn’t their well’ and they thought the NGO’s would come back. The committee and the water fund solved this issue, and none of the wells we have drilled over time have fallen into disrepair.
CHRISTIAN DISCIPLESHIP
We always use our drilling opportunities as a disciple making outreach. We try to dig our wells near churches or schools if possible.
In addition, we never exclude individuals of any other faiths from access to the water, so the well becomes a testimony to the mercy of the Lord. In this instance it will show the village the faithfulness of God. They have been praying for clean water, and the local clergy were the ones who begged CEED to visit this village. Therefore, funding this well will become a sign of hope and of the reality of the Gospel in action.
And we will use the drilling itself as an outreach. One of our donors many years ago donated a solar-powered projection system, and recently has donated a second to go with the Big Rig Team. During the drilling people come from miles around to watch the drilling while it is happening. While that is going on the projection system is being charged. Then at night, we set up the projector and play ‘The Jesus Film’ a film about Jesus’s life, ministry, death, and resurrection in the local dialect of the area where the well is being drilled.
When the well is completed, we add a plaque with the donor’s names and usually a verse telling the village why the water was gifted to them. The dedications are done by the local ministers of the church, turning even that event into a praise meeting.
PROJECT COSTS AND TIMELINE
Total Project Cost: $5,000 for a borehole well and hand pump.
Cost break out:
Future maintenance: Covered by funds raised by the Water Source Committee, done by CEED
Other Funding: Each project is directly funded. We only bring in outside funding sources in case of a dry well, or a larger project that we know going in will require more heavy-duty equipment. To our knowledge this well with require neither.
Funding Requested from ILW: $5,000
Date Funding Required: As soon as possible.
Estimated Project Start Date: Work will start as soon as reallocation of funds is approved.
Estimated Project Completion Date: December 2024 or January 2025, based on when the commissioning can take place.
YOUR IMPACT
This village is in a prime position to benefit from clean water. Not only would the health of the villagers increase by an estimated 71%, but they would be able to break the poverty cycle. Villages with wells, particularly those situated at crossroads, have the potential to grow. Women who’s main concern was finding water will have opportunities to run shops and businesses. Men who were too sick to work, or spending all of their income on medicine for preventable illnesses like typhoid, will have the capital for tools, seeds, and even small patches of land to farm that they own rather than having to rent. They will be able to build better homes for their families and afford to send their children to school.
Children will be able to learn, and the small school will grow as parents in outlying areas start to send their children to the place where the water is. These children will have an education and will be able to better support themselves and their families as they grow up.
The church congregations will thrive, making this well a key outreach point. All because of one borehole.
The village that was given this well isn’t very large. But clean water will change that. The three churches will grow because the miracle of clean water is attractive to the people who have never had access to anything more than dirty, muddy, water before. The ponds they were using were deep and dangerous, but now they can send their children for clean water and not worry that they will drown. The school children will be healthy. They will be able to attend classes and learn without losing time due to typhoid infections. Their parents aren’t too sick to work or attend church.
The well itself is on church property, so the people who come will continue to hear the gospel as they gather water, and hopefully gather into congregations. You can see the changes on the faces of these people. You can see it in the clean clothes they are wearing.
The children’s faces reflect the joy of the village as they drink from the water source. They have a good future now, one free of preventable illnesses. The village will grow and prosper, all because of this clean water well.
| PROJECT COMPLETION REPORT | KINAGA COU | UGANDA | |
| Report Submission Date: | February 6, 2025 | ||
| Actual Project Completion Date: | December 20, 2024 | Has the Completion Date Changed Since Funding Was Approved?: | No |
| Total Actual Project Costs from Beginning to End: | $5,000 | Have Costs Changed Since Funding Was Approved?: | No |
| Updated Estimate of the Number of People Who Actually Will Be Served Daily: | 768 | Has the Estimate Changed Since Funding Was Approved?: | No |
| Actual Measured Pump Capacity in Liters Per Minute (LPM) or Gallons Per Minute (GPM) : | 54 LPM | 14 GPM | Depth of Well in Meters or Feet: | 46 Meters | 150 Feet |
| Latitude, Longitude: | 00.972754, 31.924863 | Has Location Changed Since Funding Was Approved?: | No |
THE COMMISSIONING CELEBRATION


All projects are made possible by World Changers.