ABIRA VILLAGE, UGANDA

FUNDING RE-ALLOCATED

STATUS

people impacted

dollars funded

FUNDED AUGUST 7, 2024

LOCATION

Abira Village is located in the Kiruuli Sub-County, Masindi District, of Western Uganda.

CURRENT CONDITIONS

There are 96 households in Abira Village, about 500 people.

This is one of the places that the CEED team visited in 2024. The village is incredibly poor, and the population is made up of refugees from one of the conflicts of the last decade in neighboring Congo. Their home is now Uganda, and they had asked the Ugandan government for water, but it is unlikely that their request will ever be processed. They are industrious people though. They have built everything in their village by hand, including their stick and straw thatch church building shown in the photos. It has no walls, windows or doors, but they worship there. They were also the first village that I ever visited where, rather than asking for more for themselves, they prayed that many villages in Uganda could be given clean water.

Their water source in the dry season is a big pond in a swampy area just under a kilometer from the village. In rainy season there is a shallow well that they have dug that fills up with dirty water. Some of the children have distended bellies, indicative of water worms. And many of the villagers have experienced typhoid and other illnesses in the last year alone, even though they have done their best to dig latrines far from the water sources they need to use.

The lack of clean water keeps them in a state of constant poverty, as what little money they can earn from the crops they grow goes towards medicine, rather than the village itself.

CEED’S EXPERIENCE

CEED has been drilling in Uganda for nearly 20 years. The first well was drilled using the percussion method, which could drill inches in a day. One of our donors saw the process and donated two mobile drills for our use, which could now drill a well in days. And then in 2023 we introduced our new big rig for use in areas where we encounter rock layers or other obstacles that the smaller drills cannot overcome.

The team is Ugandan-staffed and led through the efforts of Herbert Asiimwe the Director of CEED Uganda. They are our exclusive drilling team in Uganda. Herbert has been leading these drilling teams for over fifteen years and most of our drillers have over a decade of experience each.

Herbert is also a licensed CPA, so the bookkeeping is kept to the highest standards and oversight is done in the US office by both Kate Kuzko and the CEED board. Each well is funded individually and [the money] goes directly to the cost of running the drill and [paying[ salaries for the teams on the ground. After all, the workman is worth their wages, and one of CEEDs goals has always been to ensure that those working for us can support their families through the work they do.

We also make sure that we are running our equipment responsibly. A part of each well’s cost goes directly into maintenance and small repairs to keep things running smoothly.

WELL MAINTENANCE & REPAIRS

The funding for future repairs and maintenance is a two-part process. When a village is chosen for a well, [some of the villagers form a water committee, who] sign a contract stating that they will do their best to set aside a few pennies per month to help cover the cost of future repairs. They can do this by selling surplus water to local farmers, or by having a collection.

This method acts as a guarantee that the village will take ownership of the well. When something is wrong, they have the responsibility to reach out and let us know, so the wells can be repaired in a timely manner. This process works and it grew out of many years of
experience in Uganda. Without this process the village does not take full ownership of the well and before we implemented it we found that wells would break from small, fixable issues but they wouldn’t contact us because it “wasn’t their well.” The committee and the water fund solved this issue.

CHRISTIAN DISCIPLESHIP

We always use our drilling opportunities as a disciple making outreach. We try to dig our wells near churches or schools if possible. And we never exclude any one of any other faiths, so the well becomes a testimony to the mercy of the Lord. In this instance it will show the village the faithfulness of God. They have been praying for clean water, and the local clergy were the ones who begged CEED to visit this village. Therefore, funding this well will become a sign of hope and of the reality of the Gospel in action.

And we use the drilling itself as an outreach. One of our donors many years ago donated a solar-powered projection system, and recently has donated a second one to go with the Big Rig Team. During the drilling, people come from miles around to watch the
drilling while it is happening. While that is going on, the projection system is being charged. Then at night, we set up the projector and play “The Jesus Film.” a film about Jesus’ life, ministry, death, and resurrection in the local dialect of the area where the well is being drilled.

When the well is completed, we add the Ingomar plaque, usually with a verse telling the village why the water was gifted to them. The dedications are done by the local ministers of the church, turning even that event into a praise meeting.

PROJECT COSTS AND TIMELINE

Total Project Cost:  $5,000 for a borehole well and hand pump.

Cost break out:

  • Materials:              $3,900
  • Labor:                       $650
  • Administrative:        $450

Future maintenance:  Covered by funds raised by the Water Source Committee

Other Costs:  If we hit rock, the well will need to be drilled by the big rig, so the well won’t cost more to drill.

Other Funding: Each project is directly funded. We only bring in outside funding sources in the case of a dry well, or for a larger project that we know going in will require more heavy-duty equipment. To our knowledge this well with require neither.

Funding Requested from ILW:  $5000

Date Funding Required:  As soon as possible

Estimated Project Start Date:  Within 2-3 weeks of funding date

Estimated Project Completion Date: Within 2-3 months of funding date, based on when the commissioning can take place.

YOUR IMPACT

A clean well will give these villagers a chance to thrive. They will have money to feed their children and get them an education, which is the best way for the village to break the poverty cycle and establish itself as a thriving community. They will be able to use the old water sources for their animals and to make bricks for buildings like their church. This is in addition to the benefits that we know come from a clean water well.

The impact of clean water on the families in the village is almost immeasurable. We do know, however, that on any given day 71% of the village that was sick previously will be healthy because they are not drinking contaminated water. The women of the village will spend less time gathering water and instead will be able to join their husbands in the fields or start cottage businesses. They will be less likely to face domestic violence at home, due to spending hours of the day gathering water.

Families will spend less money on medicines and transportation to clinics, and will be able to pay for tuition for their children, better seed for farming, and even save for supplies to build a sturdier home and even buy a parcel of land for their own, to farm without having to rent.

If a family is spending over $150 a year on medicine, and they experience that 71% decrease in illness, then they will save close to $100 a year for investment in education, agriculture, and better food and shelter. If this is the case for all the families in the village, this savings will start to impact the whole village. In as little as a year, the villagers will be healthier, and new buildings will have sprung up around the well. Over time you will find schools and churches opening up as well, creating a thriving community in place of one that is barely surviving now, due to contaminated water.

FUNDING REALLOCATED OCTOBER 15, 2024

Unfortunately, Abira Village will not receive a well at this time. Its funding has been fully reallocated to another location in Uganda, Kinaga COU.

CEED requires two agreements from the villagers before they will begin drilling. The first requirement, a commitment by the people that regular collections will be taken to pay for future maintenance and repairs, was met. A water committee was formed to manage this collection and future payments. The second agreement, that the landowner will provide free access to the well for all who go there, was refused by two different landowners.  This is an unusual situation for CEED and Ingomar Living Waters.

If a willing landowner in a location with sufficient groundwater for a well is found in Abira, CEED will open a new round of funding for their well. They will cover all of the costs so far in Abira from their general donations.

All projects are made possible by World Changers.